Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 339     Entry time: Monday, January 15, 2024, 16:36
Author: Albert Kong 
Category: Standard Operation 
Type: Target 2 
Specific: Cooling 
Subject: T2 Resin Flask Exchange 

The resin flask on the T2 cooling package was exchanged today (new resin can prepped in the morning). 

The newly installed resin flask was placed slightly off-set from the marking on the platform to ensure that the braided hose will clear the blocks when replaced at the end of shutdown.

The spent resin can was dropped off in the hot cell, ready to be prepped for drying. 

See attached image for illustration of the rigging solution used, ~20 ft was covered by two sligs and a shackle to clear the MH mezzanine.

 

Attachment 1: IMG_3836.JPEG  560 kB  | Show | Hide all
Attachment 2: IMG_3844.JPEG  1010 kB  | Show | Hide all
Attachment 3: IMG_3856.JPEG  751 kB  | Show | Hide all
ELOG V2.9.2-2455