Message ID: 262     Entry time: Monday, April 06, 2020, 15:02
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 2 
Specific: M9 
Subject: M9 beam blocker returned to beamline 

The M9 beam blocker was returned to the beamline today using the RH shielded transport flask.  The top flange o-ring was replaced before installation.

After installation the "Lift T" assembly was removed, and electrical cable and air supply connected.  Correct functionality of the limit switches was confirmed with the control room.  Actuation of the beam blocker could not be tested at this time because control takes place through the M9 area ASU.

 