Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 161     Entry time: Monday, May 25, 2015, 12:48
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Controls 
Subject: T1/T2 Controls System Crash 

At 9:15am this morning BL1A tripped off due to loss of the watchdog signals for the T1/T2 control system.  Graham Waters investigated and the problem was found to be a corrupted initialization file.  The error was corrected, and BL1A was started by 11:30am.
 

ELOG V2.9.2-2455