The following work was completed during the 2020 shutdown period for BL1A (Jan-Aug 2020):
- T1 and T2 EPICS data checked for anomalies. None found, all sensors behaving as expected
- T1 and T2 cooling package water drained to storage tank, sampled, and released
- All cuno filters changed (3 for T1, 2 for T2)
- All T1 and T2 proteus paddle wheels changed
- T1 and T2 hansen fitting connections inspected: all good, no leaks
- Both packages refilled, restarted, demin flow tuned to 1gpm, and checked for leaks: very small leak from 3/4" line going into heat exchanger on T1 target loop (not new, tightening doesn't help)
- Profile monitor air hoses inspected: ok
- Air amplifiers inspected: cycle time ok, no leaks
- M9 beam blocker overhaul completed including new air cylinders
- M9 and M20 BB actuation checked
- T1 and T2 profile monitor actuation checked
- T1 and T2 ladder movement checked
- XTPAGE 7L updated to indicate which targets spent
- Target ladder status sheet updated
- ASCO valves for M9BB, M20BB, T1 prof mon, T2 prof mon all serviced (with rebuild kit)
August 25, 2020 update:
- The cap block was replaced over T2
- Actuation of the M9-T2 and M20 beam blockers was tested. Both moved fine and limits displayed correctly |