Message ID: 199     Entry time: Friday, April 22, 2016, 14:45
Author: Isaac Earle 
Category: Other 
Type: Other 
Specific: Active Sump 
Subject: RH MH Hot Cell Lab Active Sump Water Released 

The Remote Handling Hot Cell Lab Active Sump has been released to city sewer following the procedure in Document-64834.  The water was close to the sump high limit switch (approximately 5800L).  Before release the water was sampled, tested, and approved for release by RPG.  The tritium analysis form has been filled out and returned to RPG,.

It took approximately 5 hours to empty the sump with all valves fully open and the water flowing through the 10" Cuno filter.