Message ID: 49     Entry time: Monday, July 09, 2012, 17:17
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Target 
Subject: BL1A Start-Up Prep 

 - T1 & T2 targets switched to "remote" control
 - Both target ladders were moved to Position 3 (12mm Be)
 - T2 Q1 flow interlock defeat was removed (only required when target ladder is in position zero)
 - The targets are now ready for BL1A start-up (up to 10μA this evening)
 