- T1 & T2 targets switched to "remote" control
- Both target ladders were moved to Position 3 (12mm Be)
- T2 Q1 flow interlock defeat was removed (only required when target ladder is in position zero)
- The targets are now ready for BL1A start-up (up to 10μA this evening)
|