Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 298     Entry time: Thursday, July 28, 2022, 12:51
Author: Adam Newsome 
Category: Repair 
Type: Other 
Specific: Hot Cell 
Subject: Meson Hall Hot Cell - Nuclear Ventilation Issue 

It was reported today by Peter Bratt that the nuclear ventilation system for the hot cell is not functioning. At this time, the cause of the issue is unknown. Remote Handling and Electrical Services are investigating. This e-log will be updated when the issue is resolved.

 

Update: the issue was caused by worn belts which had been smoking. The belts must be replaced.

ELOG V2.9.2-2455