Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 118     Entry time: Wednesday, July 02, 2014, 16:56
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Cooling 
Subject: T1-P2 and T2-P1 pressure transducers replaced. 

The T1-P2 (outlet) pressure transducer was replaced to address an erroneous signal.  The XTPAGE value now reads as expected.

The T2-P1 (inlet) transducer was also replaced to address a noisy (and worsening) signal.  Replacing the transducer seems to have had no effect on the XTPAGE values.  A possible controls issue is suspected and Jamie Cessford will be notified so that the matter is directed to the appropriate person.

No dose was incurred during the procedure.

ELOG V2.9.2-2455