Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 303     Entry time: Friday, September 23, 2022, 10:51
Author: Matthew Gareau 
Category: Standard Operation 
Type: Target 2 
Specific: Target 
Subject: Target T2-MK2 moved to storage pit 

The T2-MK2 target was transported from the east hot cell to the storage pit at position 3.

As was noted in the past, position 3 is difficult to align. The flask alignment pins prevent the flask from positioning in the correct location, and it is required to have the flask just above the pins to ensure that the pins did not restrict the flask movement.

It is recommended to install a camera system to assist with the target placement and retrieval, which will help reduce the amount of dose one receives during this operation.

 

Attachment 1: Storage_location_state_as_of_Sept_23_2022_(after_target_moves).jpg  2.736 MB  Uploaded Friday, September 23, 2022, 16:24  | Show | Hide all
ELOG V2.9.2-2455