Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 254     Entry time: Monday, January 20, 2020, 16:07
Author: Isaac Earle 
Category: Other 
Type: Other 
Specific: Other 
Subject: Second 55-gal drum moved to cyclotron east vault tunnel 

 The second (and final) 55 gallon drum containing active items from the Meson Hall East Hot Cell was transported today from the Warm Cell to the Cyclotron East Vault Tunnel.   The updated form is attached.

Attachment 1: RWC-55-02-2019_(after_move_to_cyc_vault_tunnel).pdf  99 kB  | Show | Hide all
ELOG V2.9.2-2455