Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 213     Entry time: Thursday, January 12, 2017, 09:21
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 2 
Specific: Target 
Subject: T2-MK2 Position 1 Beam Spot 

 The beam spot on the 10cm beryllium target in Position 1 on T2-MK2 (Target ID: "OCT.06#3") was measured and photographed yesterday.  A fairly well centered spot was measured to be approximately 4.6mm wide x 5.2mm tall on the entrance window and 5.7mm wide x 7.6mm tall on the exit window using the Nikon micrometer level.  This target first saw beam on June 16, 2016.

A PDF scan of the beam spot measurements and photographs of the beam spots are attached.

 

 

T2-MK2_Posn_1_Beam_Spot_-_Jan_11_2017.jpg

Attachment 2: T2-MK2_Position_1_Beam_Spot_Measurements_-_Jan_11_2017.pdf  125 kB  | Show | Hide all
ELOG V2.9.2-2455