Message ID: 58     Entry time: Tuesday, September 25, 2012, 16:31
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: T1/T2 Controls 

 - The target control software was modified to reference the correct pot. look-up table for the target at T1 (T1-MK1)
 - The target position buttons on the T1 & T2 panels were not working properly and Graham Waters was contacted to investigate
 - Graham power cycled the microprocessor and the TG1 crate which seemed to make things worse (the control software would not even boot up)
 - Graham was able to diagnose the problem remotely, and found a loose cable which was causing it not to boot
 - The target position issue will not be looked into further until a longer maintenance period or the 2013 shutdown
 - Target position can be controlled manually using a portable control box
 - Using the control box, the T1 ladder was moved to position zero to allow use of the profile monitor;  The ladder was then moved back to position 3
 