Message ID: 138     Entry time: Tuesday, January 27, 2015, 17:38
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Cooling 
Subject: T1 Cooling Package 3/4" Valves Rebuilt - T1 MRO Complete 

- Both 3/4" ball valves on the T1 cooling package target water circuit were rebuilt, leak tested with house air pressure, and reinstalled

- The 3/4" ball valve on the T1 heat exchanger secondary side was replaced with a new unit

- The 3/4" needle valve on the T1 heat exchanger secondary side was rebuilt, leak tested with house air pressure, and reinstalled

- The T1 cooling package was refilled and restarted using a bypass across the inlet/outlet Hansen fittings

- The package was inspected while running and no leaks were visible (video survey taken with file stored on Isaac's PC)

- All T1 Cooling Package MRO activities are now complete