Message ID: 278     Entry time: Thursday, March 10, 2022, 13:57
Author: Adam Newsome 
Category: Maintenance 
Type: Target 1 
Specific: Cooling 
Subject: Changed paddle wheel, o-ring, and shaft in flow sensors at T1 cooling package 

The paddle wheels, o-rings, and shafts were changed at the T1 cooling package for the following sensors:

  • B1A:T1:FGCOLA
  • T1CS:FGTGT
  • T1CS:FGDEM
  • T1CS:FGSEC
  • T1:FGCOLB

No major issues were noted. Some residue was observed upon cleaning the sensors. No leaks observed when turning water isolation valves back on.

The schematic which contains these sensors is TBP0902.