Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 67     Entry time: Friday, January 11, 2013, 15:48
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Target 
Subject: BL1A Tunnel Accessed 

 The BL1A tunnel was accessed to drain and sample T2 cooling package water.  A puddle of water was noticed in the South TNF area around the drain by the boot-box.  No water was found in the BL1A tunnel.  Photos attached.

Attachment 1: IMG_0801.JPG  440 kB  | Show | Hide all
Attachment 2: IMG_0802.JPG  411 kB  | Show | Hide all
ELOG V2.9.2-2455