Message ID: 71     Entry time: Tuesday, January 29, 2013, 15:55
Author: Isaac Earle 
Category: Maintenance 
Type: Target 2 
Specific: Cooling 
Subject: T2 H.E. Transported to Warm Cell 

Friday Jan 25:
- Both sides of heat exchanger drained, disconnected, and capped
- Heat exchanger transported to warm cell (field from H.E. approximately 15µSv/hr at 0.5m)

Monday Jan 28:
- Both sides of heat exchanger flushed with city water
- Heat exchanger lifted and tilted to drain as much water as possible 

IMG_0860.JPG

 

IMG_0864.JPG

ELOG V2.9.2-2455