Message ID: 189     Entry time: Monday, March 07, 2016, 18:22
Author: Isaac Earle 
Category: Development 
Type: Target 1 
Specific: Controls 
Subject: Preliminary Testing of T1 Control System Complete 

 Preliminary testing of the new PLC control system and EPICS interface was completed today for the T1 target, T1 cooling package, and T1 collimator.  All systems behaved as specified.  This test did not include testing of any T1 thermocouples which will be included as part of the T2 test program to follow.  This is not considered system commissioning, which will follow after all preliminary testing is complete and the commissioning plan document has been released.

A scanned copy of the T1 test plan with notes is attached.

Attachment 1: T1_Testing_Checklist_-_Complete_-_March_7_2016.pdf  210 kB  | Show | Hide all