Water was purged from the T1 and T2 targets using compressed air. The water is stored in a labeled bucket on the BL1A blocks near the T2 cooling package. The bucket is approximately 100µSv/hr on contact and 10µSv/hr at 0.5m. Isaac's coveralls had 500cpm on them after this job and were dropped off at active laundry. Keith had no contamination on his coveralls. |