Message ID: 77     Entry time: Friday, April 12, 2013, 13:28
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Cooling 
Subject: Cooling Packages Leak Tight 

 The T1 and T2 expansion tanks were filled on Monday April 8th.  There was no change in the level when inspected today (April 12th).  Visual inspection of the packages also found no leaks.