Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 127     Entry time: Monday, November 17, 2014, 10:25
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Other 
Subject: Amplified Air Leak In T1 Area Repaired 

While the 1A blocks over the T1 area were removed last week the opportunity was used to investigate an air leak on the amplified air system discovered on August 11, 2014.

The leak was found to be coming from a device related to the septum polarity switch located behind (south of) the septum power supply on the 1A blocks.  This device is not in use, so the amplified air to the device was disconnected by plugging the relevant branch of a brass 3/8" Swagelok T fitting in the area.  This stopped the leak, and the air amplifier is cycling at usual speed after being restarted.

Attachment 1: IMG_4263.JPG  2.296 MB  | Show | Hide all
ELOG V2.9.2-2455