Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 158     Entry time: Friday, May 01, 2015, 16:01
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Other 
Subject: RH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak Check 

The Meson Hall RH Lab Warm Cell was used by Beamlines Group for hydrostatic testing of the TNF heat exchanger.  The location was chosen because of access to a water supply, active drain, and the heat exchanger has removable contamination.  The work took place on April 30th and May 1, 2015.  New plastic sheet was placed over the 6 foot block in the center of the warm cell which was used as a work area.  The plastic was removed after completion of the job.  The floor around the block was swiped and 100cpm contamination was found.

See attached photos.

Attachment 1: IMG_1510.JPG  126 kB  | Show | Hide all
Attachment 2: IMG_1511.JPG  116 kB  | Show | Hide all
Attachment 3: IMG_1512.JPG  102 kB  | Show | Hide all
ELOG V2.9.2-2455