  RH-Meson Hall  Not logged in ELOG logo
Message ID: 149     Entry time: Tuesday, April 21, 2015, 12:59
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Target 
Subject: T1-MK2 target moved from storage pit to beam line 

 The T1-MK2 target was transported from the storage pit to the beamline.  The target measured approximately 10mSv/hr at 0.5m.  All target services were hooked up and the cooling package was started (no change in T1 vacuum).