Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 94     Entry time: Tuesday, November 26, 2013, 10:33
Author: Isaac Earle 
Category: Repair 
Type: Target 2 
Specific: Target 
Subject: T2-MK2 Water Flush 

 The T2-MK2 target in the hot cell was flushed with water and then purged with air so that stagnant water is not left sitting in the target.  Replacement of the failed 10cm Be cassette will take place in January 2014.

ELOG V2.9.2-2455