Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 101     Entry time: Wednesday, January 22, 2014, 15:41
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 2 
Specific: Water Leak 
Subject: Water Drained From Suck Tube Released 

 After approval from RPG, the water drained from the suck tube, which was stored in a bucket in the RH lab active sink area, was released to the active drain.  Even after rinsing, the bucket still had a slight field from the base, so it has been labelled and will be kept in the active sink area.

ELOG V2.9.2-2455