Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 288     Entry time: Thursday, April 14, 2022, 14:38
Author: Adam Newsome 
Category: Other 
Type: Target 2 
Specific: Diagnostics 
Subject: Issue with Protect Monitor SHV Cable 

Diagnostics group (Shengli Liu) noted a lack of connectivity between control panel and T2 Protect Monitor via the high voltage cable. Upon inspection it was noted:

  • The cable was very brittle due to radiation exposure and it was cracking in multiple places
  • In the SHV connector, the pins were slightly bent (bending them back into position seemed to rectify the connectivity issue).
  • The cable was bent at the strain relief junction

RH Group has advised that Diagnostics replace the entire cable as soon as possible. For now it appears to be working.

Attachment 1: PXL_20220414_210238000.jpg  374 kB  | Show | Hide all
Attachment 2: PXL_20220414_210053641.jpg  379 kB  | Show | Hide all
Attachment 3: PXL_20220414_210037717.jpg  458 kB  | Show | Hide all
ELOG V2.9.2-2455