Message ID: 150     Entry time: Tuesday, April 21, 2015, 13:38
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Target 
Subject: Air Amplifier Started. T1 & T2 Profile Monitor Actuation Checked 

 The lower air amplifier has been started, and air supplied to the T1 and T2 areas by opening the appropriate ball valves beneath the amplifier.  The amplifier is cycling normally and the barrels are cool to the touch (indicating no significant air leaks).

Actuation of both profile monitors was checked from the control room.  Both reach the in and out limits as expected, with no change in vacuum level in the respective volumes.