Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 185     Entry time: Monday, January 18, 2016, 17:19
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Cooling 
Subject: T1 & T2 Packages Drained; BL1A Holding Tank Released 

 The T1 and T2 cooling packages were drained to the BL1A holding tank on Jan 8 2016.  The volumes were 100L and 80L respectively.  Before starting there was 350L of water in the holding tank from the 500MeV system which Steve Sapriken drained in September 2015.  The T1 and T2 systems were sampled and delivered to RPG.  After receiving permission from RPG to release all 3 portions of water it was pumped into the city sewer on Jan 18, 2016.

ELOG V2.9.2-2455