Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 300     Entry time: Tuesday, August 23, 2022, 14:36
Author: Adam Newsome 
Category: Standard Operation 
Type: Other 
Specific: Other 
Subject: BL1A Holding Tank - Level Check 

The water level inside the BL1A active water holding tank was checked today (Aug. 23, 2022). The tank is essentially empty at this time.

ELOG V2.9.2-2455