Message ID: 261     Entry time: Monday, March 23, 2020, 16:13
Author: Isaac Earle 
Category: Maintenance 
Type: Other 
Specific: Other 
Subject: M9 beam blocker MRO completed 

M9 beam blocker MRO work was completed in the hot cell today.  This included replacement of the main shaft seals and replacement of the air cylinders.  Actuation was tested after replacement and the blocker moved smoothly through the full length of travel with approximately 45psi air pressure.  It is ready for transport back to the beamline.