Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 314     Entry time: Tuesday, January 17, 2023, 13:49
Author: Adam Newsome 
Category: Repair 
Type: Other 
Specific: Active Sump 
Subject: Active Sump - Valve V6 Leaking 

It was noticed today (2023-01-17) that the valve V6, used in draining the BL1A Holding Tank to the Active Sump, was leaky. This valve should be replaced as soon as possible. It has been added to the MS Planner maintenance tasks list.

ELOG V2.9.2-2455