- T2-MK2 target (currently in the T2 monolith) purged with air
- All cooling package reservoir o-rings changed
- Target water line #6 Hansen o-rings changed at both ends
- M8 BB / Col. A supply hose Hansen o-rings changed at both ends
- Target water and demin circuit Cuno filters changed
- Used filters double-bagged, labeled, and stored on 1A blocks north of boot box area
- The following Swagelok ball valves removed for service: Tgt return (X2), Sec return (X2), Demin supply, Demin return (X2), Col A return, Col B return
*** Four #4 Hansen o-rings on package panel still require changing (size was not available from stores) |