Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 19     Entry time: Tuesday, March 06, 2012, 15:27
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: Quick Connect Fittings on T1 Target 

 The air hoses for the profile monitor supply line were inspected and no cracking was found (was found on T2).  The quick connect fittings for the bottom air assembly were sticky/corroded and not actuating properly.  Replaced fittings with new parts.

ELOG V2.9.2-2455