Message ID: 135     Entry time: Wednesday, January 14, 2015, 13:32
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 1 
Specific: Target 
Subject: T1-MK2 Moved from B/L to Storage Pit 

The T1-MK2 target was transferred from the beam line to the storage pit in hole #5 using the transfer flask.  A maximum field of 7.2mSv/hr was measured at 0.5 meters from the target.  A video was taken while the target was lifted from the monolith and can be found on Isaac's PC (too large to upload).

The blocks to the west and east side of the T1 monolith (level with the monolith) were swiped by Danka Krsmanovic and no contamination was found.  These blocks will therefore not be painted this shutdown.

The three active filters removed from the T1 cooling package have been labelled and stored in the area north of the BL1A blocks boot box with permission from Danka.  The bag with the filters is 100microSv/hr at 0.5m and 2mSv/hr on contact.