The target ladder was detached, old delta seals removed, sealing surfaces cleaned using scotchbrite pad and a dremel tool, and delta seals were installed on the lower face of the upper slide plate. The target was leak checked and found to have no significant leaks (no response from 2s helium spray at previous leak location on upper slide plate).
The profile and protect monitor electronics were checked by Bill Rawnsley and appear to be functioning normally.
The T1-MK2 target is now ready for use in the beam line. |