Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 306     Entry time: Tuesday, January 03, 2023, 07:42
Author: Adam Newsome 
Category: Other 
Type: Other 
Specific: Active Sump 
Subject: Active Sump - Level Check 

The sump level was checked by Robin Swanson on Dec. 31, 2022. It was essentially empty - see attached photo.

Attachment 1: 2022-12-31.jpg  317 kB  | Show | Hide all
ELOG V2.9.2-2455