Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 234     Entry time: Wednesday, March 28, 2018, 10:12
Author: Isaac Earle 
Category: Standard Operation 
Type: Other 
Specific: Other 
Subject: Five waste pails moved to East Vault Tunnel for storage 

 Five 5 gallon metal pails with active waste were moved from the Warm Cell to the Cyclotron East Vault Tunnel today for long term storage.  The pails were labeled with radioactive item tags and storage item numbers (1442 through 1446).  The pails contain used resin from T1, T2, and STF, as well as one pail with active metal parts.

ELOG V2.9.2-2455