Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 130     Entry time: Friday, December 19, 2014, 14:35
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 2 
Specific: Other 
Subject: Amplified Air Shut Off 

The BL1A amplified air system has been shut off, and will remain off until required for BL1A start-up in Spring 2015 (the lower of the two units was in use, with the upper unit on standby as a spare).

ELOG V2.9.2-2455