Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 96     Entry time: Thursday, January 09, 2014, 15:21
Author: Isaac Earle 
Category: Repair 
Type: Target 2 
Specific: Target 
Subject: T2-MK2 Electrical Check 

 An electrical check was performed on the T2-MK2 profile monitor by Bill Rawnsley.  All signals produced the expected response, and Bill approved the monitor for use.  Bill has saved screenshots of the signal profile.

The target ladder position micro-switches and profile monitor in/out limit switches were also tested: all OK.

The T2-MK2 target is now ready to be transported to the beam line.

ELOG V2.9.2-2455