When the damage to the T2 Protect Monitor was found to be caused by flying debris from a vacuum spike (see e-log #179), it was decided that the T1 Protect Monitor should also be replaced.


Oct 8:

- The T1-MK2 target was transported from the beam line to the hot cell after the T2 target was returned to the beamline (see e-log #180).  The T1 target was 38.9mSv/hr at 0.5m

- The T1 target was inspected in the hot cell: profile monitor looked ok, protect monitor damaged with holes and dents on upstream side (see attached photos), position 4 target looked ok with beam spots roughly centered (see photos)

- The old protect monitor was removed in the hot cell and a new monitor supplied by Probes Group was installed (previously undocumented brass spacers were seen over the monitor cassette alignment pins on the target)

- The T1-MK2 profile and protect monitors were checked by Probes Group at the hot cell --> both ok

- Measured elevation of the new T1-MK2 protect monitor: 1831.1mm on entrance side (previously 1831.0 --> ok)

- Position 4 target entrance side elevation checked: 1832.9mm (previously 1831.9mm --> 1mm discrepancy)

- Position 4 exit side elevation measured: 1832.4mm (previously 1832.1mm --> ok)

- Protect monitor exit side elevation measured: 1833.7mm (previously 1833.3 --> ok)

- T1-MK2 target returned to beamline at approximately 5pm, no problems

- Vacuum pumped down quickly and it was decided that a leak check would not be necessary


Oct 9:

- All target services attached

- T1 target moved to Position 0 using remote control box

- T1 package started, no change to T1 vacuum

- T1 profile monitor and protect monitor electronics checked by Probes Group from mezzannine --> both ok

- T1 motor drive cable conected to controller in 1A racks.  The T1 ladder can be moved from the 1A racks mimic panel (T2 still requires portable control box)

- Actuation of the T1 profile monitor was tested --> actuated properly, no change in vacuum

- T1 cooling package expansion tank level checked: no change

- The T1 area is ready to be covered

Attachment 1: entrance_1.JPG  184 kB  | Show | Hide all
Attachment 2: entrance_2.JPG  161 kB  | Show | Hide all
Attachment 3: entrance_3.JPG  186 kB  | Show | Hide all
Attachment 4: exit_1.JPG  176 kB  | Show | Hide all
Attachment 5: exit_2.JPG  169 kB  | Show | Hide all
Attachment 6: exit_3.JPG  178 kB  | Show | Hide all
Attachment 7: new_protect_1.JPG  174 kB  | Show | Hide all
Attachment 8: new_protect_2.JPG  189 kB  | Show | Hide all
Attachment 9: new_protect_3.JPG  146 kB  | Show | Hide all
Attachment 10: old_protect_1.JPG  160 kB  | Show | Hide all
Attachment 11: profile_1.JPG  181 kB  | Show | Hide all
Attachment 12: targets_1.JPG  191 kB  | Show | Hide all
ELOG V2.9.2-2455