Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 352     Entry time: Thursday, August 22, 2024, 15:16
Author: Adam Newsome 
Category: Standard Operation 
Type: Other 
Specific: Active Sump 
Subject: Active sump filled ~600L with grey water from RCR1 sump replacement 

During a replacement of the RCR1 active sump (mechanical services group), approximately 600L of non-active grey water was released into the RH active sump. At this time, this should be all of the water in the RH sump (approximately 600L total).

ELOG V2.9.2-2455