Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 24     Entry time: Tuesday, March 27, 2012, 13:14
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: Water removal from T1 monolith 

All water was removed from the base of the target hole in the T1 monolith using a suction tube device and wypalls.  Video inspection was performed and revealed standing water in the unused 4" beam line pipe facing south as well as on the bellows on the M13 beam line.  (Photos attached)

Vacuum group is currently pumping down on the T1 volume to remove the remainder of the water.

Attachment 1: downstream.jpg  88 kB  | Show | Hide all
Attachment 2: south.jpg  81 kB  | Show | Hide all
Attachment 3: upstream.jpg  91 kB  | Show | Hide all
Attachment 4: M13.jpg  89 kB  | Show | Hide all
ELOG V2.9.2-2455