All water was removed from the base of the target hole in the T1 monolith using a suction tube device and wypalls. Video inspection was performed and revealed standing water in the unused 4" beam line pipe facing south as well as on the bellows on the M13 beam line. (Photos attached)
Vacuum group is currently pumping down on the T1 volume to remove the remainder of the water. |