Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 274     Entry time: Friday, April 09, 2021, 12:42
Author: Matthew Gareau 
Category: Maintenance 
Type: Target 2 
Specific: Cooling 
Subject: Changed the paddle wheel, o ring, and shaft in the Collimator A flow meter at the T2 package 

With the assistance of Maico we changed the paddle wheel, o ring, and shaft in the Collimator A flow meter (Q4) at the T2 package.

Flow meter was wiped clean to ensure o ring surface was clean.

Everything was changed without incident, and ops confirmed that the flow rate is now normal.

ELOG V2.9.2-2455