Message ID: 243     Entry time: Tuesday, August 28, 2018, 11:16
Author: Isaac Earle 
Category: Standard Operation 
Type: Other 
Specific: Other 
Subject: South TNF Holding Tank water released 

 The water in the South TNF Holding Tank was released today under work permit #C2018-08-28-3.  The tank contained approximately 100L from the T1 cooling package (drained Aug 16, 2018) and 350L from the 500MeV system (drained April 23, 2018 by Steve Sapriken).