Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 8     Entry time: Friday, January 06, 2012, 15:37
Author: Isaac Earle 
Category: Maintenance 
Type: Target 2 
Specific: Target 
Subject: Transferred M20 beam blocker to hot cell 

Uncovered T2 monolith and transferred M20BB to hot cell using flask.

  

Field at 0.5m from beam blocker while being lifted with flask: 21,700μSv/hr (using pole monitor) 

Field above hole after removing M20BB: 9000μSv/hr

  

ELOG V2.9.2-2455