Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 36     Entry time: Wednesday, June 06, 2012, 08:48
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: Manipulator Repair Complete 

 Repair of the west side hot cell manipulator was completed and the manipulator was re-installed into the hot cell.  No contamination was found in the lab, on the manipulator support frame, or on any tools.  A 'y' motion lock was also installed on the east manipulator and all accessible pulleys and rollers were lubricated.

ELOG V2.9.2-2455