Message ID: 34     Entry time: Monday, May 28, 2012, 17:17
Author: Isaac Earle 
Category: Repair 
Type: Target 2 
Specific: Cooling 
Subject: T2 Water Loss Update 

 The T2 cooling package, the top of the T2 monolith, and the Hansen water connections which connect the package to the target were inspected and no evidence of a water leak was found.  Kim wipes had been stuffed inside the female Hansen fittings after they were disconnected on April 12th, and these were also completely dry.  I checked with control room and there are no log entries regarding anyone starting the cooling package during the relevant dates.  I also contacted Graham Waters (who sometimes works on the water package controls) and he has not turned on the package since it was shut off on April 12th.

The water level in the expansion tank has not changed since last inspection on May 24th.  I will continue to check the water level daily.

ELOG V2.9.2-2455