The following work was completed on both the T1 and T2 target alignment frames

  • One of the short taper pins on the top of the frame was swapped for a longer version to simplify flask alignment to the frame (now one pin can be aligned at a time instead of both concurrently)
  • Three permanently mounted cameras installed to view east/west alignment, north/south alignment, as well as hook, latch, and door position
  • LED strip lights installed on the bottom of the frame for better illumination during alignment of target devices
  • All video and power signals routed through a single connector (9-pin CPC) for ease of use
  • Frame painted with blue Rustoleum metal paint
  • Hole positions, alignment orientation, camera position, etc labeled on frame

20190624_095731.jpg

 

20190624_095714.jpg

 

20190624_095626.jpg

 

20190624_095613.jpg

 

20190624_095701.jpg

 

20190624_095743.jpg

 

Attachment 1: 20190624_095714.jpg  181 kB  | Show | Hide all
Attachment 6: 20190624_095701.jpg  76 kB  | Show | Hide all
ELOG V2.9.2-2455