Entry  Friday, January 10, 2025, 18:36, Albert Kong, Standard Operation, Other, Cooling, T1/T2 cooling packages drained CALCS_T1_T2_cooling_system_drain_speed.htmlTritium_Sample_and_Analysis_Form_-_T1_Cooling_Package_-_2025-01-10.pdfTritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10.pdf
The T1 and T2 cooling packages were drained starting at 14:36, by 14:48 both expansion tanks had dried, meaning the draining rate for both tanks were
~80L/hr, generally it will only take 2 hours to fully drain the system.
Tritium samples were collected after allowing the system to drain for ~5 minutes to clear out water in the drain lines and actually collect samples
Entry  Friday, November 29, 2024, 11:57, Adam Newsome, Maintenance, Other, Hot Cell, Hot cell and warm cell maintenance tasks Operator_left_oil_level_before_refill.jpgOperator_Left_oil_level_after_refill.JPGOperator_right_oil_level.jpgRight_window_water_level_before_refill.jpgWarm_cell_water_window_after_refill.jpg
The following maintenance tasks were completed on 2024-11-29 by A. Newsome, A. Kong, A. Tam, M. Dalla Valle:

    Warm cell right window water level topup... the water level was a couple inches lower from the top. Using a tube connected to the nearby
sink, the level was topped up fully. See attached before/after picture.
    Hot cell oil level checks:
    
        Right side OK.
Entry  Wednesday, October 30, 2024, 15:10, Albert Kong, Standard Operation, Target 1, Target, T1-MK1 Electrical Check on Hot Cell 7x
T1-MK1 electrical checks were completed on the hot cell. Specifically the profile and protect monitors were checked (assistance from Micheal Donohoe
and Holden Jones from 'probes group'/accelerator systems).
Reference WP C2024-10-30-3.
Entry  Thursday, October 10, 2024, 12:24, Adam Newsome, Other, Other, Hot Cell, Safety Walkaround Complete - Meson Hall HC/WC Area 
A safety walkaround was completed for the Meson Hall Hot/Warm Cells. 
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified: 
Entry  Monday, September 09, 2024, 16:31, Albert Kong, Standard Operation, Other, Active Sump, Active Sump High Level Sensor Testing 
The active sump high level sensor was tested and correctly alarmed locally. However the alarm in the MHESA RCR lab did not make any sound and no notification
was recieved at the main control room. After some investigation, it is believed that the RCR lab alarm 'had already produced a notification at the control
room and so no new notification was produced by testing the remote handling sump. Alternatively, the RCR sump alarm may have been silenced in the control
Entry  Monday, September 09, 2024, 09:39, Albert Kong, Other, Target 2, Cooling, B1A:T2CS:FGSEC:RDFLOW noisy, CYCLOTRON Fault 17321 EPICS_Data_Strip.png
Secondary flow sensor B1A:T2CS:FGSEC:RDFLOW on the T2 cooling station suddenly became very noisy at around 11 pm, 01 September 2024. 
The sensor reading would fluctuate from 0-150 gpm which is beyond typical noise levels for these sensors (~2gpm). 
The noise spontaneously ended at around 4 am, 05 September 2024. 
Entry  Thursday, August 22, 2024, 15:16, Adam Newsome, Standard Operation, Other, Active Sump, Active sump filled ~600L with grey water from RCR1 sump replacement 
During a replacement  of the RCR1 active sump (mechanical services group), approximately 600L of non-active grey water was released into the RH active
sump. At this time, this should be all of the water in the RH sump (approximately 600L total). 
Entry  Tuesday, August 06, 2024, 11:35, Albert Kong, Standard Operation, Other, BL1A Holding Tank, BL1A and RH Active Sump Draining IMG_0173.JPEGIMG_0170.JPEGIMG_0185.JPEG
The RH active sump was drained (over Jul 31-Aug 01), in total approximately 5500 L of water was sent to city sewage.
We also tried to divert water from the BL1A holding tank to the active sump, and learned that we cannot run back-flow through the sump pump. The
valving configuration used here was V10, V1, SV1, V6 open - V2, V3 closed. (Note solenoid valve SV1 does not serve a purpose and energizing/powering-down
Entry  Wednesday, July 17, 2024, 15:05, Adam Newsome, Standard Operation, Other, Other, Safety Walkaround Complete - Meson Hall HC/WC Area 
A safety walkaround for July 2024 was completed by A. Kong.
Results can be found in the master
spreadsheet
Entry  Friday, June 28, 2024, 15:44, Albert Kong, Other, Other, Transfer Flask, Inspection of Primary Target Transfer Flask Flask_Inspection_Images_(26_June_2024).pdf






Normal
0




false
false
false

EN-CA
JA
X-NONE

Entry  Thursday, May 23, 2024, 17:10, Albert Kong, Standard Operation, Target 1, Target, T1-MK1 Target Exchange (+ leak fix, service panel changes, coupler exchange) 36x
On May 23, 2024 two sets of plugs from position 1 and 3 and a 12mm Be target from position 5 (serial #109) was removed from T1-MK1 in the Meson Hall
remote handling hot cell.
The plugs and spent target are kept in the secondary hot cell (East) on the lift table for future beamspot imaging and to cool down prior to disposal.
Entry  Tuesday, May 07, 2024, 13:21, Albert Kong, Repair, Target 2, Cooling, T2 Cooling System Expansion Tank Ultrasonic Level Sensor Repair T2_Level_EPICS_Readout.pdfT2_expansion_tank_sensor_noise_issue_-_4_hr_after_fix.PNG
At ~8am on May 06, the expansion tank level sensor for the T2 cooling system suddenly became noisy. 
Cyclotron fault ref: 16915
Approximately 11:00 am today, the noisy sensor was replaced with a spare, upon which it was learned that the spare sensor is broken (registers
Entry  Wednesday, April 03, 2024, 10:48, Adam Newsome, Other, Other, BL1A Holding Tank, BL1A Holding Tank - water level check 
As of 2024-04-03, the BL1A Holding Tank water level is approximately 580L. It is recommended to drain the tank prior to the start of the operating year.
Entry  Thursday, February 15, 2024, 14:53, Albert Kong, Maintenance, Target 2, Air amplifiers, T2 Lower Air Amplifier Maintenance/Rebuild IMG_4005.JPEGIMG_4006.JPEGIMG_4054.JPEG
The lower amplifier for the T2 target station air supply was removed for teardown, inspection, and rebuild. 
The goal of this operation is to understand wear development in the air amplifier over ~13 years of operation, and potentially determine a recommeded
service interval.
Entry  Thursday, February 15, 2024, 12:38, Riley Sykes, Repair, Other, Hot Cell, Indium Extruder Hand Pump 
Feb 1 2024
Hand Pump observed to be losing pressure at full extension of cylinder, seals likely blown. Due to Enerpac P84 being an obsolete model, a newer
model hand pump was ordered.
Entry  Thursday, February 01, 2024, 11:16, Albert Kong, Standard Operation, Other, Cooling, Spent resin can rinse, purge, and drying 
 The recently removed resin can from the T2 target station was rinsed with city water and flushed with compressed air for 1 cycle. 
We will run it through a few more cycles before proceeding with drying under the fume extractor, at which point this ELOG will be updated. 
UPDATE (Feb 08, 2024): The T2 resin can underwent 3 more air cycles. Today it was moved under the fume extractor with the lid cracked open and
Entry  Thursday, February 01, 2024, 11:14, Albert Kong, Standard Operation, Target 1, Hot Cell, T1-MK1 Flush and Purge on Hot Cell IMG_3950.JPEGIMG_3975.JPEGIMG_3973.JPEGIMG_3971.JPEGT1&T2_Pump-Down_and_Leak_Check_Record_05_FEB_2024.pdf
The recently removed T1-MK1 target ladder was flushed with city water for ~30s at all target positions. It was then purged with compressed air at ~5
psi for ~1 minute at all target positions. We then left the target ladder in pos5 to fully extend the bellows and allow it to dry overnight.
This ELOG will be updated as we progress with work done to dry the target ladder and eventually exchange the spent targets.
Entry  Friday, January 19, 2024, 17:07, Albert Kong, Standard Operation, Other, Target, T1/T2 Profile Monitor, TGT Ladder, CUNO filter leak, Motor Coupling Inspection, + M9/M20 Blocker Actuation 7x
 The following tasks were completed:

    Yesterday (Jan 18), the T1/T2 cooling packages were inspected for leaks and some moisture was found underneath the CUNO filters behind
the resin cans on both T1/T2. It was determined that the source of the leak was a loose fitting on the drain valves of the CUNO filter housing (see photo).
Entry  Monday, January 15, 2024, 16:47, Albert Kong, Standard Operation, Other, Cooling, T1/T2 Cooling Pkg. Prep for Refill + Leak Check At Pressure 7x
 The following tasks were completed in preparation of re-filling the T1 and T2 cooling packages:

    All valves were returned to the 'open' configuration (note, compressed air to collimators at T1 is to remain closed - rotating collimator
no longer in use || also note, odd handle configuration at T1 panel when all valves are open - see attached).
    Leaks from valves were checked,
Entry  Monday, January 15, 2024, 16:36, Albert Kong, Standard Operation, Target 2, Cooling, T2 Resin Flask Exchange IMG_3836.JPEGIMG_3844.JPEGIMG_3856.JPEG
The resin flask on the T2 cooling package was exchanged today (new resin can prepped in the morning). 
The newly installed resin flask was placed slightly off-set from the marking on the platform to ensure that the braided hose will clear the blocks
when replaced at the end of shutdown.
Entry  Thursday, January 11, 2024, 15:10, Albert Kong, Maintenance, Other, Cooling, T1/T2 Cooling Pkg. Proteus Paddle Wheel Maintenance, CUNO Filter Replacement, and Fitting Inspection 
 The following tasks were performed:

    All electrical, water, and pneumatic connections to the T1 target was reconnected.
    3x and 2x CUNO filters for T1 and T2
respectively were changed (O-ring for the housings were not changed).
    All hansen fittings on the front mounting plates of the T1 and T2 cooling
Entry  Wednesday, January 10, 2024, 12:47, Albert Kong, Standard Operation, Target 1, Target, T1 target ladder exchange (T1-MK1 to hot cell roof, T1-MK2 from pit to station) T1_and_T2_Beryllium_Target_Beamtime_Spreadsheet_-_(10Jan2024).xlsxMeson_Hall_Storage_Pit_Target_Device_Location_Record_-_(10Jan2024).pptmVacuumAt2.56PM.PNG
T1-MK1 was moved from the target station to the hot cell roof. 
Radiation surveys report 140 mSv/hr at 0.5m for the bare T1-MK1 target ladder.
On the hot cell roof, fields are 220uSv/h at 0.5m.
Entry  Wednesday, January 10, 2024, 12:25, Albert Kong, Standard Operation, Other, Cooling, T1/T2 cooling packages drained T1T2EPICSPages.PNGIMG_3943.JPEGIMG_4231.JPEG
Jan 10, 2024:
The cooling packages for T1/T2 was drained this morning. ~150 L from each of the cooling package reservoirs + expansion tank was drained to the
BL1A holding tank. The holding tank held ~400 L initially and is therefore now filled to ~700 L (out of a 800 L capacity). We will likely drain the holding
Entry  Monday, December 04, 2023, 09:22, Albert Kong, Standard Operation, Target 2, Cooling, T2 TGT Low Flow T2FlowAlwaysCloseTo3GPM.pngT2TGTWaterTempOK.pngWarnTripLevels.pngFlowWarnTripLevels.pngPicture1.png
 See Cyclotron fault 16553. 
"B1A:T2CS:FGTGT readback is toggling at the warn limit of 3.0 GPM and over the last week has started crossing over the trip threshold of 2.8
GPM, tripping off the water package. Initial Action Taken: 1A is scheduled to take beam on December 13."
Entry  Tuesday, October 17, 2023, 14:25, Albert Kong, Maintenance, Other, Other, T1/T2 Air Amplifier Spool O-Ring Servicing IMG_2576.JPEGIMG_2575.JPEG
Today we re-lubricated the o-rings on the top air amplifier for T1/T2, and replaced the o-rings on the bottom air amplifier with new and also lubricated
o-rings. 
We used Haskel lubricant #50866.
Entry  Tuesday, October 17, 2023, 10:16, Eric Lahe, Maintenance, Other, Active Sump, Testing the Remote Handling Lab Active Sump Level Sensor 
The level sensor for the active sump in the RH lab was tested.
The level sensor is working properly and is operational.
 
Entry  Thursday, August 03, 2023, 10:33, Albert Kong, Repair, Target 2, Cooling, T2 Expansion Tank Water Level Low (Leak Identified) 7x
The water level in the T2 cooling system expansion tank dropped to below the trip treshold of 20 cm (ref Cyclotron fault #16123), requiring the beam
to be 'defined' off (see attached image).
Some calculations (see attached .html) show that over the period in which the tank level was dropping (from July 12 - Aug03, 2023) approximatley
Entry  Tuesday, July 18, 2023, 09:14, Adam Newsome, Other, Target 1, Cooling, T1 Cooling Package: target flow (FGTGT) sensor noise issues 1.PNG2.PNG
Between 1:00 pm and 6:00 pm on July 17, 2023, the T1 target cooling water flow rate sensor exhibited some noise which resulted in it dropping below the
warning/trip limit. The control room requested that the threshold values be lowered - permission was granted. The thresholds were set to 2.3 gpm for both
warn and trip levels. See attached screenshot from EPICS sensor data. The occasional spikes and dips continued throughout the night fairly consistently.
Entry  Tuesday, June 06, 2023, 15:42, Albert Kong, Standard Operation, Target 1, Cooling, T1 Heat Exchanger Low Flow Diagnostics Picture1.pngPicture2.png
On May 31, the low active water in BL1A was turned off briefly and upon re-starting, the flow to the T1 heat exchanger was very close to the reported
warn limit (~6 gpm). 
 
Entry  Thursday, May 11, 2023, 11:28, Adam Newsome, Repair, Target 1, Target, T1-MK1 - broken target ladder motor coupler repaired 
See Cyclotron Fault 15787. The target ladder motor failed to move to the commanded position during a test. The T1 area was uncovered and the motor assembly
was inspected by M. Dalla Valle, A. Newsome, and A. Kong. It was determined that the rubber coupler which connects the motor shaft to the drive assembly
had degraded and snapped. This is similar to an incident which recently occurred on T2. The coupler was replaced with an all-metal version. The system
Entry  Wednesday, May 03, 2023, 10:06, Adam Newsome, Maintenance, Other, Hot Cell, Meson Hall Hot Cell - Nuclear Ventilation HEPA Filter Changed, Operational 
The HEPA filter in the nuclear ventilation system for the Meson Hall Hot Cell was changed and tested by mechanical services under work permit C2023-04-25-14.

 
Entry  Thursday, April 06, 2023, 13:35, Albert Kong, Maintenance, Target 1, Controls, T1 Motor Controller Hearbeat Trip (+T2 Heartbeat Trip) MotorControllerHB.pngScreenshot_2023-04-11_145420.png0367549f-9672-4009-be34-df7abacf4a32.jpgScreenshot_2023-05-16_091027.png
The T1 motor controller hearbeat tripped (noticed this morning). 
This does not seem prevent beam delivery or target ladder actuation (see screenshot, target still ready for beam).
An improperly functioning hearbeat led on a controller may indicate that the controller is beginning to fail.
Entry  Thursday, March 30, 2023, 13:17, Albert Kong, Maintenance, Other, Target, Air Amplifier Testing: M9 BB (AKA T2 blocker), M20 BB, T2 MK1 prof. monitor, T1 MK1 prof. monitor actuation T1_Mar30_2023_Vacuum.pngT2_Mar30_2023_Vacuum.pngIMG_1907.JPEG
We tested the air amplifiers by actuating the beam blockers and profile monitors on the T1 and T2 target stations. 
The blockers and profile monitors were each actuated (brought up/out and down/in fully) > 5 times and vacuum remained stable throughout (see
attached).
Entry  Wednesday, March 15, 2023, 15:56, Albert Kong, Maintenance, Target 2, Controls, T2 - M9 and M20 beam blocker actuation and vacuum test 6x
 We tested the actuation of the M9/M20 beam blockers on the T2 monolith (3-4pm).
Vacuum levels remained steady throughout so the M20 o-ring replacement that was performed this shutdown was successful (see strip of 1ACG4 - vacuum
gauge for T2 systems interlock).
Entry  Monday, March 06, 2023, 16:58, Albert Kong, Repair, Target 2, Cooling, M20 O-Ring Replacement and Valve Replacement Leak Check T1_Mar06_2023.pngT2_Mar06_2023.png
 We replaced tha O-ring on M20 at T2 and brought the target station down to vacuum, which allowed the target water pump to be turned on. 
After turning the pump on, we inspected the replaced valves for any leaks and found none - the flow on the demineralizing line was adjusted to
1.2GPM (also done at T1) by turning the needle valve.
Entry  Friday, March 03, 2023, 16:00, Albert Kong, Maintenance, Target 2, Other, M20 Return to T2 Monolith + Vaccum Leak / T1-T2 Valve Re-inspection IMG_1755.JPEGIMG_1657.JPEGIMG_1763.jpegScreenshot_2023-03-30_124716.png
 We moved M20 back to the T2 monolith and re did the connections for air + limit switches + T2 profile monitor air.
 
Note: T2 profile monitor electronics sparked when we moved M20 out initially. (Update: Shengli Liu from probes group performed a test on the T2
Entry  Thursday, March 02, 2023, 07:04, maicodallavalle, Maintenance, Target 2, Cooling, Refilled Expasion Tank 
I have filled the water package on T2 with DI water. The expansion tank is at 38.1cm. This may change when the pump is turned on.
Entry  Thursday, March 02, 2023, 06:59, maicodallavalle, Maintenance, Target 1, Cooling, Refilled Expasion Tank 
I have refilled the water package on T1 with DI water. The Expansion Tank is at 37cm. This may change when pump is turned on.
Entry  Wednesday, March 01, 2023, 13:10, Albert Kong, Maintenance, Other, Cooling, T1/T2 Water Cooling Package Heat Exchanger Ball Valve Replacement IMG_1452.JPEGIMG_1431.JPEGIMG_1438.JPEGIMG_1455.JPEG
3x 3/4" swagelok ball valves (2x at T2 and 1x at T1) were replaced after the water cooling line was shut off at the BL1A tunnels late yesterday. 
We were able to relieve pressure from the T2 water cooler + M8 colA/B (they are the same line) at the BL1A tunnel through a drain port but no such
port exists for the T1 heat exchanger line in BL1A.
Entry  Tuesday, February 21, 2023, 16:56, Albert Kong, Maintenance, Target 2, Other, M20 BB moved to meson hall hot cell roof IMG_1255.JPEG
The M20 beam blocker was moved from the T2 monolith to the meson hall hot cell with the remote handling flask (completed ~4pm).
This operation was performed in preparation for M20 maintenance (main shaft o-ring replacement + air cylinder re-lubrication).
RPG surveyors measured 20,000 CPM from swiping the surface of the beam blocker shaft, and measured 25 mSv/hr on contact with the beam blocker.
Entry  Friday, February 17, 2023, 14:36, Albert Kong, Repair, Other, Water Leak, T1/T2 Water Cooling Package Ball Valve Replacement fdb0d111-3348-483d-a78f-98eabbc45507.jpg
5 and 3 Swagelok ball valves were replaced from the T1 and T2 cooling packages respectively.
These are compression fit valves, 1/2" or 3/4" size.
1 valve in T2 was replaced previously, bringing the total # of replaced valves in T2 to 4.
Entry  Thursday, February 02, 2023, 15:14, Albert Kong, Maintenance, Target 1, Cooling, T1 Cooling Package: Leaked Valve Inspection CompiledPictures.pdf
A 0.75" SwageLok ball valve that was taken out from the T1 cooling package was inspected (SS-45S12).
All valves in the T1/T2 cooling packages likely leaked due to damage to plastic/rubber sealing components. 
 
Entry  Thursday, February 02, 2023, 10:35, Albert Kong, Maintenance, Target 1, Cooling, T1 Cooling Package Draining (Prep for Valve Replacement) 
Water reservoir in T1 started draining at ~7.30 am, will leave till tomorrow or overnight to fully drain. 
(Preparation to replace all leaky valves). 
Drained water samples collected for RPG. 
Entry  Wednesday, February 01, 2023, 14:23, Albert Kong, Maintenance, Target 1, Cooling, T1 Cooling Package: flow test after resin exchange / valve leak check / faulty(?) dial pressure gauge  IMG_1038.JPEG
Maico/Eric/Albert:
The expansion tank in T1 was filled to ~36cm in the morning.
 
Entry  Tuesday, January 17, 2023, 13:49, Adam Newsome, Repair, Other, Active Sump, Active Sump - Valve V6 Leaking 
It was noticed today (2023-01-17) that the valve V6, used in draining the BL1A Holding Tank to the Active Sump, was leaky. This valve should be replaced
as soon as possible. It has been added to the MS
Planner maintenance tasks list. 
Entry  Tuesday, January 17, 2023, 13:46, Adam Newsome, Maintenance, Other, Active Sump, Filter Change: RH Active Sump and BL1A Holding Tank Drain Output PXL_20230117_195113855.MP.jpgPXL_20230117_195649596.jpg
The CUNO filters were changed 2023-01-17 for:

    BL1A Holding Tank drain output, adjacent to the pump
    RH Active Sump, adjacent to the V2 valve

Both of
these filters are in-line with the drainage lines from the BL1A holding tank to the active sump. It was suspected that they have not been changed in many
Entry  Monday, January 16, 2023, 15:06, Adam Newsome, Repair, Other, Active Sump, RH Active Sump - draining flow rate sensor repair 
The flow rate sensor used to monitor the drain rate from BL1A holding tank to active sump, located in the active sump area, was repaired. The paddle
wheel, o-ring, and shaft were replaced. This part was significantly worn prior to replacement.
 
Entry  Monday, January 16, 2023, 15:04, Adam Newsome, Maintenance, Target 2, Cooling, T2 Cooling Package MRO - 2023 Shutdown T2_FGSEC_old_vs_new_paddle.jpgT2_2023-03-07.PNG
T2 Cooling Package MRO began Jan. 16, 2023.
 
The following maintenance tasks have been completed for T2 (this list will be updated as work progresses):
Entry  Monday, January 16, 2023, 15:01, Adam Newsome, Maintenance, Target 1, Cooling, T1 Cooling Package MRO - 2023 Shutdown T1_2023-03-06.PNG
T1 Cooling Package MRO began Jan. 16, 2023.
 
The following maintenance tasks have been completed for T1 (this list will be updated as work progresses):
Entry  Monday, January 16, 2023, 09:54, Adam Newsome, Standard Operation, Other, Cooling, T1 and T2 - Cooling Package Drained 
On Jan. 13, the T1 and T2 cooling package water reservoirs were drained to the BL1A holding tank. Water samples were obtained for each system and provided
to RPG for analysis. 
Prior to starting draining, the BL1A holding tank water level was approximately 330L. After draining, the water level was approximately 550L (checked
Entry  Thursday, January 12, 2023, 10:36, Adam Newsome, Maintenance, Target 1, Water Leak, T1 and T2 - Cooling Package Water Leaks - Ball Valves PXL_20230111_204027523.jpg
Upon uncovering the T1 and T2 areas to prepare for regular cooling package maintenance, it was discovered that multiple ball valves were leaking. Primarily
the Swagelok SS-45S12 parts, but some SS-45S8 parts have failed as well. There were small puddles of water underneath many of the valves. It appears that
the leak is due to a compromised seal. It is suspected that these parts failed from radiation exposure. They have PTFE packing material which is highly
Entry  Wednesday, January 11, 2023, 15:22, Adam Newsome, Repair, Target 2, Target, T2 Target Ladder Motor - Coupling Failure PXL_20230111_214957143.jpgPXL_20230111_215006211.jpgNew_Coupler_-_T2_Target_Ladder_Motor.PNG
It was reported on Dec. 20, 2022 that when Operations attempted to run the target ladder motor, it was unresponsive. A fault report was created: 15477.
During winter shutdown 2023, the T2 area was uncovered and the motor was inspected on 2023-01-11 by Adam Newsome and Maico Dalla Valle. The connectors
and cabling appeared OK.
Entry  Tuesday, January 03, 2023, 07:42, Adam Newsome, Other, Other, Active Sump, Active Sump - Level Check 2022-12-31.jpg
The sump level was checked by Robin Swanson on Dec. 31, 2022. It was essentially empty - see attached photo.
Entry  Tuesday, October 11, 2022, 11:27, Adam Newsome, Maintenance, Target 1, Cooling, T1 inlet pressure transducer replacement T1_inlet_pressure.png
A fault was reported June 21, 2022 (Fault
15033) regarding T1 inlet pressure warnings... the pressure reading slowly dropped over time as seen in the attached strip tool screenshot (B1A:T1CS:PGIN).
The pressure reading issue is attributed to a fault pressure transducer. The transducer was replaced on Oct. 11, 2022 my M. Dalla Valle. It is currently
Entry  Tuesday, October 04, 2022, 09:59, Adam Newsome, Maintenance, Target 2, Cooling, T2 cooling package maintenance - mini-shutdown 2022 
The following maintenance tasks were performed during mini-shutdown of 2022 with the goal of resolving the Fault 14966 (target water flow rate low).

    Replace the o-ring, paddle wheel, and shaft on the following flow rate sensors:
    
        Q1 (FGTGT)
        Q2

       Q4
    
    
    Replace the demineralizing flow metering valve with a new needle valve (the old one was flaky and appeared
Entry  Friday, September 23, 2022, 10:51, Matthew Gareau, Standard Operation, Target 2, Target, Target T2-MK2 moved to storage pit Storage_location_state_as_of_Sept_23_2022_(after_target_moves).jpg
The T2-MK2 target was transported from the east hot cell to the storage pit at position 3.
As was noted in the past, position 3 is difficult to align. The flask alignment pins prevent the flask from positioning in the correct location,
and it is required to have the flask just above the pins to ensure that the pins did not restrict the flask movement.
Entry  Thursday, September 15, 2022, 14:34, Adam Newsome, Standard Operation, Target 2, Target, T2-MK2 target elevations measurement T2-MK2_-_Sept_2022.pdf
The target elevations measurement and beam spot checks were completed on Sept. 15, 2022. This was done after a July 2022 target exchange for target positions
3 and 5. 
 
Entry  Tuesday, August 30, 2022, 14:24, Adam Newsome, Maintenance, Other, Hot Cell, Nuclear Ventilation - Filter Change 
Mechanical Services Group changed the pre-filter in the ventilation system on Aug. 29, 2022 as per work permit C2022-08-29-2.
 
It is recommended that Mechanical Services change the HEPA filter as soon as possible. These filters are on order with approximately 7 month lead
Entry  Tuesday, August 23, 2022, 14:36, Adam Newsome, Standard Operation, Other, Other, BL1A Holding Tank - Level Check 
The water level inside the BL1A active water holding tank was checked today (Aug. 23, 2022). The tank is essentially empty at this time. 
Entry  Monday, August 22, 2022, 09:01, Adam Newsome, Standard Operation, Other, Active Sump, Active Sump Draining 
On Aug. 18, 2022, Operations informed RH group that an alarm activated for the full status of the MHESA B1 RCR1 Lab holding tank. Additionally another
alarm was reported in the RH control room regarding the RH sump full (Southwest Meson Hall Extension - Remote Handling area). However, there is an alarm
signal for the RH sump that was seen as OK at the MHESA Lab HMI.
Entry  Thursday, July 28, 2022, 12:51, Adam Newsome, Repair, Other, Hot Cell, Meson Hall Hot Cell - Nuclear Ventilation Issue 
It was reported today by Peter Bratt that the nuclear ventilation system for the hot cell is not functioning. At this time, the cause of the issue is
unknown. Remote Handling and Electrical Services are investigating. This e-log will be updated when the issue is resolved.
 
Entry  Wednesday, July 06, 2022, 12:52, Adam Newsome, Other, Other, Hot Cell, Potential hot cell window oil leak 
Some oil was noticed around the hot cell window, on the control panel, and on the ground below the control panel. A leak is suspected. 
 
Suggest tightening all bolts to specified torque along the window, and monitoring overflow oil level (position today was marked). If the problem
Entry  Wednesday, July 06, 2022, 12:49, Adam Newsome, Repair, Other, Hot Cell, Hot Cell - Helium wand tubing broken 
The tubing for the helium wand inside the hot cell is broken and needs to be replaced. More tubing has been ordered and the job will be completed in
the coming weeks.
Entry  Wednesday, July 06, 2022, 12:49, Matthew Gareau, Repair, Other, Other, Helium line damage, and hotcell window oil leaking 
Today myself and Adam Newsome started the leak detection steps for a target exchange and notice that the Helium line was not connected/broken from inside
the hotcell.
A new line will need to be installed and the line attached to the helium wand.
Entry  Wednesday, June 08, 2022, 08:59, Adam Newsome, Other, Target 2, Cooling, T2 flow rate sensor (BL1A:T2CS:FGTGT ) - warning and trip limits adjusted After_Adjustment.PNGSensor_data_around_June_6-8.PNG
See fault 14966: 





Normal
0




false
false
false
Entry  Wednesday, May 25, 2022, 10:16, Adam Newsome, Standard Operation, Target 2, Target, T2-MK2 moved: from storage location to hot cell 
Target T2-MK2 was moved from the storage location (formerly position 3) to the hot cell in preparation for replacement of end of life targets. 
Entry  Wednesday, May 25, 2022, 10:15, Adam Newsome, Standard Operation, Target 1, Target, T1-MK2 moved from hot cell to storage area 
The T1-MK2 target was moved from the hot cell to the storage area, in position 5. Note: manual nudging of the flask was required to get it to align with
guide pins properly. 
Entry  Thursday, May 05, 2022, 14:39, Adam Newsome, Standard Operation, Target 1, Target, T1-MK1 and T2-MK1 profile monitor actuation test 
The profile monitor actuation tests were completed for T1 and T2. No abnormalities were noticed in vacuum during either test. 
 
Note: an issue was observed with T2-MK1 - see e-log 290. The issue was resolved. 
Entry  Thursday, May 05, 2022, 14:38, Adam Newsome, Maintenance, Target 2, Controls, T2-MK1: profile monitor actuation check and repair to connector T2-MK1_prof_mon_connector_-_rear_-_after_fix.jpg
An attempt was made to actuation the T2 profile monitor, however it showed up in EPICS as being not present. Furthermore, the "Remote"
indicator light on the physical controller was not lit up despite the switch being in remote mode. The limit switch indicator light was working.
 
Entry  Wednesday, May 04, 2022, 11:27, Adam Newsome, Standard Operation, Target 2, M9, M9 and M20 Beam Blocker Actuation Test 
The beam blockers for M9 and M20 were actuated, and vacuum was monitored to ensure no disruptions. Both actuation tests were successful. Motion was observed
and no abnormalities noted. Cabling and air connections checked: OK.
 
Entry  Thursday, April 14, 2022, 14:38, Adam Newsome, Other, Target 2, Diagnostics, Issue with Protect Monitor SHV Cable PXL_20220414_210238000.jpgPXL_20220414_210053641.jpgPXL_20220414_210037717.jpg
Diagnostics group (Shengli Liu) noted a lack of connectivity between control panel and T2 Protect Monitor via the high voltage cable. Upon inspection
it was noted:

    The cable was very brittle due to radiation exposure and it was cracking in multiple places
    In the SHV connector, the
Entry  Wednesday, April 13, 2022, 12:33, Adam Newsome, Standard Operation, Target 2, Target, T2-MK1 moved: from storage area to target station 
The T2-MK1 target was moved from the storage area (formerly position 4) to the target station. Services were reconnected in order to prepare for normal
operation. 
Entry  Wednesday, April 13, 2022, 12:31, Adam Newsome, Standard Operation, Target 2, Target, T2-MK2 moved: from target station to storage 
The T2-MK2 target was moved from the target station to the storage area (position 3). Upon removal, it was measured with a pole monitor at 0.5 m to be
960 mSv/h. 
Entry  Wednesday, March 16, 2022, 14:16, Matthew Gareau, Standard Operation, Other, Cooling, T1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg
 The T1/T2 water packages were drained into the B1AAWHT (280L), the water was sampled and tested by RPG, results included in elog.
Once given the all clear myself and Maico released the water from the B1AAWHT (300L). 
It was discovered that the solenoid valve SV1 which is located in the RH lab beside the sump, is broken and will need replacing, picture included
Entry  Monday, March 14, 2022, 14:09, Adam Newsome, Maintenance, Target 2, Cooling, T2 cooling system: filled, tuned, leak-checked  
The T2 cooling system was refilled with water via the expansion tank until the tank level read approximately 38 cm. 
The system pump was restarted. All sensors displayed acceptable nominal values. Demin flow was tuned to 1.0 gpm.
No leaks or abnormalities observed - system running normally.
Entry  Monday, March 14, 2022, 14:08, Adam Newsome, Maintenance, Target 1, Cooling, T1 cooling system: filled, tuned, leak-checked 
The T1 cooling system was refilled with water via the expansion tank until the tank level read approximately 38 cm.
The system pump was restarted. All sensors displayed acceptable nominal values. Demin flow was tuned to 1.0 gpm.
 No leaks or abnormalities observed - system running normally.
Entry  Friday, March 11, 2022, 15:09, Adam Newsome, Maintenance, Target 2, Cooling, Filters replaced: T2 cooling system 
All filters were replaced for the T2 cooling system: demineralizing resin circuit and target water system. 
Entry  Friday, March 11, 2022, 15:08, Adam Newsome, Maintenance, Target 1, Cooling, Filters replaced: T1 cooling system 
All filters were replaced for the T1 cooling system: demineralizing resin circuit, target water system, and M15. 
Entry  Friday, March 11, 2022, 15:06, Adam Newsome, Maintenance, Target 2, Cooling, O-rings on T2 cooling package water reservoir changed 
The four o-rings on top of the T2 cooling package water reservoir were  changed as per the recommended 5 year replacement schedule.
Entry  Friday, March 11, 2022, 15:05, Adam Newsome, Maintenance, Target 1, Cooling, O-rings on T1 cooling package water reservoir changed 
The four o-rings on top of the T1 cooling package water reservoir were changed as per the recommended 5 year replacement schedule.
Entry  Thursday, March 10, 2022, 13:57, Adam Newsome, Maintenance, Target 1, Cooling, Changed paddle wheel, o-ring, and shaft in flow sensors at T1 cooling package 
The paddle wheels, o-rings, and shafts were changed at the T1 cooling package for the following sensors:

    B1A:T1:FGCOLA
    T1CS:FGTGT
    T1CS:FGDEM
    T1CS:FGSEC
    T1:FGCOLB

No
major issues were noted. Some residue was observed upon cleaning  the sensors. No leaks observed when turning water isolation valves back  on.
Entry  Thursday, March 10, 2022, 11:18, Adam Newsome, Maintenance, Target 2, Cooling, Changed paddle wheel, o-ring, and shaft in flow sensors at T2 cooling package PXL_20220310_173802512.jpgPXL_20220310_173759444.jpg
The paddle wheels, o-rings, and shafts were changed at the T2 cooling package for the following sensors:

    B1A:T2:FGCOLA
    T2CS:FGTGT
    T2CS:FGDEM
    T2CS:FGSEC
    T2:FGCOLB

No
major issues were noted. Some residue was observed upon cleaning the sensors. No leaks observed when turning water isolation valves back on.
Entry  Thursday, February 17, 2022, 13:03, Matthew Gareau, Maintenance, Target 1, Target, T1 MK2 wire scanner and protect monitor test removal and reattachment with pin straightening IMG_20211207_140443.jpgIMG_20211207_140508.jpgIMG_20211207_140735.jpgIMG_20211207_122631.jpgIMG_20211207_142836.jpg
 this Work was done on 09 Dec 2021.
Since Isaac Earle was leaving Triumf he was giving us (maico, chad, adam, and myself) a demonstration of how to remove targets, protect monitor,
and wire scanner. During the removal it was noticed that one of the pins for the wire scanner was bent and it would not be possible to reattach without
Entry  Wednesday, April 14, 2021, 14:30, Isaac Earle, Standard Operation, Other, Active Sump, RH Lab Active Sump pumped out 
 The RH Lab Active Sump reached the high level sensor at some point overnight before the April 8th work day.  Maico Dalla Valle noticed the
alarm in the morning and notified RPG and myself.  I also received a notification by e-mail from Vicky Hannemayer who had been contacted by Ops because
of the RCR alarm.
Entry  Friday, April 09, 2021, 12:42, Matthew Gareau, Maintenance, Target 2, Cooling, Changed the paddle wheel, o ring, and shaft in the Collimator A flow meter at the T2 package 
With the assistance of Maico we changed the paddle wheel, o ring, and shaft in the Collimator A flow meter (Q4) at the T2 package.
Flow meter was wiped clean to ensure o ring surface was clean.
Everything was changed without incident, and ops confirmed that the flow rate is now normal.
Entry  Wednesday, March 31, 2021, 16:15, Matthew Gareau, Standard Operation, Target 1, Target, T1-MK1 target exchange IMG_20210330_140744.jpgIMG_20210330_141059.jpgIMG_20210330_141455.jpgT1-MK1_-_2021.pdf
 March 29 Monday
- moved T1-MK1 target from beamline to hotcell  (field from target 15mSv/hr @ 0.5m)
- flushed water through position 4
Entry  Wednesday, February 17, 2021, 10:39, Isaac Earle, Development, Other, UCN, UCN Target Cask Testing 8x
A trial run of remote removal of the UCN target was performed using the shielded target cask (TTA0335) developed in 2020.  The work took place between
Feb 9 - 17 under work permit C2021-02-09-1.
The procedure in work instruction Document-187117 R1 was followed. Draining and purging of the water system as well as venting of helium from the
Entry  Tuesday, November 24, 2020, 15:10, Isaac Earle, Standard Operation, Target 2, Target, Additional targets added to T2-MK1 ladder 
 The following work on the T2-MK1 target was completed sporadically over the last few months:
 
Sept 22:
Entry  Tuesday, October 27, 2020, 14:01, Isaac Earle, Repair, Target 2, Cooling, T2 Collimator flow meter paddle wheel replaced 
The T2 Collimator A flow meter signal (B1A:T2:FGCOLA) began fluctuating and occasionally reading 0gpm on Sunday Oct 25 causing BL1A trips and machine
down time.
On the maintenance day today (Tues Oct 27), the T2 package was uncovered and the T2 Col. A flow meter was opened.  No unusual deposits were
Entry  Wednesday, August 19, 2020, 12:57, Isaac Earle, Maintenance, Target 1, Cooling, T1/T2 MRO summary for 2020 shutdown 
The following work was completed during the 2020 shutdown period for BL1A (Jan-Aug 2020):

    T1 and T2 EPICS data checked for anomalies.  None found, all sensors behaving as expected
    T1 and T2 cooling package
water drained to storage tank, sampled, and released
    All cuno filters changed (3 for T1, 2 for T2)
    All T1 and T2 proteus paddle
Entry  Thursday, July 09, 2020, 06:44, Isaac Earle, Development, Other, M9, Alignment of M9 Q1Q2 magnets complete 
 Mike Vogel reported that alignment of the Q1Q2 assembly w.r.t. the T2 and B1 flanges was completed on July 7.  This was performed in the test
stand with the flange positions set to the measurements taken in the 2019 shutdown.  Alignment to the theoretical location was achieved within 0.1mm.
The axis of the Q1 and Q2 magnets were aligned to each other previously within similar accuracy.
Entry  Tuesday, July 07, 2020, 15:13, Isaac Earle, Development, Other, M9, M9 Q1Q2 service stand Lemo connector wiring Lemo_pin_wiring.PNG
The diagram below shows the wiring for the two connectors on the service stand (the wires running from the stand to the power supplies.  (see TB23400
for details)
 
Entry  Tuesday, July 07, 2020, 13:22, Isaac Earle, Development, Other, M9, M9 Q1Q2 8.jpg1.jpg4.jpg6.jpg
 The M9 Q1Q2 magnet assembly lift beam has been installed according to drawing TB23401.  The side-to-side as well as beam-axis direction adjustment
features were tuned so that the assembly is level when lifted.
 
Entry  Friday, June 12, 2020, 13:54, Isaac Earle, Development, Other, M9, M9 Q1Q2 water header installed 2.jpg1.jpg
The Q1Q2 water header (TB23481) was mounted this morning as per installation drawing TB23400.
Heat shrink tubing was applied to the B1 power cables (two positive, two negative) over the length of cable in the highest field which was showing
some signs of radiation damage on the insulation.  The tubing used was McMaster-Carr PN 75665K932 (Clear PTFE, 4:1 shrink ratio, 1.0" ID before
Entry  Wednesday, June 10, 2020, 08:58, Isaac Earle, Development, Other, M9, T2-M9 and M9-B1 flange scan data 2017-03-28_meson_hall_t2_with_import_of_2015_data.xit642019-25-01_meson_hall_t2_data.xit64
 Laser tracker scan data from 2017 and 2019 attached as a backup.  Original files from Beamlines Group who also keep copies on \\trwindata\experimental
support\alignment\T2-M9_data
Entry  Tuesday, June 09, 2020, 17:01, Isaac Earle, Development, Other, M9, Cables and helium leak check line installed to M9 service stand 
 The 10-pin thermal switch wire, 2-pin steering wire for Q2, and a 1/4" copper tube for remote helium leak check were installed through the
service chase with the power cables and connected to the M9 service stand.  Approximately 10m of extra cable (2-pin and 10-pin) was coiled and left
in the cooler section of the service chase after the first sharp bend.  The cables and the tubing are currently run as far as the vertical cable tray
Entry  Monday, April 06, 2020, 15:02, Isaac Earle, Standard Operation, Target 2, M9, M9 beam blocker returned to beamline 
The M9 beam blocker was returned to the beamline today using the RH shielded transport flask.  The top flange o-ring was replaced before installation.
After installation the "Lift T" assembly was removed, and electrical cable and air supply connected.  Correct functionality of the
limit switches was confirmed with the control room.  Actuation of the beam blocker could not be tested at this time because control takes place through
Entry  Monday, March 23, 2020, 16:13, Isaac Earle, Maintenance, Other, Other, M9 beam blocker MRO completed 
M9 beam blocker MRO work was completed in the hot cell today.  This included replacement of the main shaft seals and replacement of the air cylinders. 
Actuation was tested after replacement and the blocker moved smoothly through the full length of travel with approximately 45psi air pressure.  It
is ready for transport back to the beamline.
Entry  Wednesday, March 11, 2020, 10:29, Isaac Earle, Development, Other, M9, M9 Q1Q2 service stand foot plate installed 
 The M9 Q1Q2 "foot" plate (TB23363) has been installed over the floor plate.  A nominal gap between the plates of 1/2" was set
before lowering the plate, it was then leveled using the three adjustment bolts resulting in a larger gap.  After leveling, the plate was lifted to
remove the spirit levels and lock the position of the leveling bolts.  The plate was then re-lowered and the tiedown bolt assemblies (TB23383) were
Entry  Wednesday, March 04, 2020, 13:42, Ron Kuramoto, Repair, Other, Other, B/L 1A vacuum air leak repair 1AT1_Vacuum_Leak_Repair-Feb2020.pdf
 A 4” Marmon aluminum blank-off flange and o-ring were replaced on the south port of the T1 target monolith vacuum vessel. This port
was accessed from the 1A Service Tunnel were the repair took place.
Entry  Friday, February 28, 2020, 09:06, Isaac Earle, Development, Other, M9, M9 Q1Q2 service stand floor plate installed M9_service_stand_floor_plate_TB23351.png
 The M9 service stand floor plate (TB23351) was installed in the M9 pit yesterday.  Prior to installation all 5 threaded inserts were tested
using a 1/2"-13 stud tool on an RH pole.  The west most hole (shown in red below) had damaged threads and the stud could only be threaded in
2 turns.  All other locations (shown in green) had usable threads with 6-8 full turns possible with the stud tool.  The plate was installed using
Entry  Monday, February 10, 2020, 14:51, Isaac Earle, Maintenance, Other, Other, T1-MK2 target and M9BB moved 
 The T1-MK2 target was moved from the hot cell to Hole #5 in the storage pit.  The M9 beam blocker was then moved from the beamline to the
hot cell for MRO work.  A field of 14.4mSv/hr was measured at 0.5m from the beam blocker during removal.
Entry  Wednesday, February 05, 2020, 14:53, Isaac Earle, Maintenance, Target 1, Cooling, T1 & T2 cooling package MRO work completed 
 Annual MRO work on the T1 and T2 cooling packages is now complete.  The following tasks were performed:

    Water from both packages drained to the South TNF holding tank (samples taken)
    All Proteus paddle wheels, shafts, and
o-rings replaced (5 each at T1 and T2)
    All Cuno filters changed
    Archived data for all sensor readbacks inspected.  Only
Entry  Thursday, January 30, 2020, 17:55, Isaac Earle, Repair, Target 1, Target, T1-MK2 target assembly repair completed in hot cell T1-MK2_-_2020.pdfRHB_8901_Position_1_Entrance_Window.jpgDSC_0047_Position_1_Exit_Window.jpgRHB_8904_Position_4_Entrance_Window.jpgDSC_0022_Position_4_Exit_Window.jpg
The following work was done to the T1-MK2 target in the hotcell between the dates of May 24, 2019 - Jan 30, 2020 (See E-Log #251 for further information):

    May 24: Flushed position 2 with water, purged all positions with air.  Left air running through position 0 over the weekend

   May 27: Switched to position 5, left air running to dry out bellows
    May 28: Started pump out with cold-trap;  Reached "fine
Entry  Monday, January 20, 2020, 16:07, Isaac Earle, Other, Other, Other, Second 55-gal drum moved to cyclotron east vault tunnel RWC-55-02-2019_(after_move_to_cyc_vault_tunnel).pdf
 The second (and final) 55 gallon drum containing active items from the Meson Hall East Hot Cell was transported today from the Warm Cell to the
Cyclotron East Vault Tunnel.   The updated form is attached.
Entry  Tuesday, December 17, 2019, 12:39, Isaac Earle, Standard Operation, Other, Other, 55 gallon drum and old M9 service stand moved to Rad Waste Pit RWC-55-01-2019.pdfpit_-_before_move.jpgdrum_being_lifted.jpgpit_-_after_move_-_showing_drum.jpgpit_-_after_move_-_showing_service_stand_(bottom_right_with_green_sling).jpg
The following items were moved today from the Warm Cell to the Rad Waste Pit for long term storage:
1. A 55 gallon drum containing various active components from the East Hot Cell.  The drum was labelled on the body and lid with the identification
number RWC-55-01-2019.
Entry  Monday, June 24, 2019, 14:29, Isaac Earle, Development, Target 1, Target, T1 and T2 target alignment frames overhauled 8x
The following work was completed on both the T1 and T2 target alignment frames

    One of the short taper pins on the top of the frame was swapped for a longer version to simplify flask alignment to the frame (now one
pin can be aligned at a time instead of both concurrently)
    Three permanently mounted cameras installed to view east/west alignment, north/south
Entry  Wednesday, May 22, 2019, 14:25, Isaac Earle, Repair, Target 1, Target, T1-MK2 target moved to HC; T1-MK1 target moved to BL T1-MK1_target_info_sheet_-_Installed_May_21_2019.pdf
After extensive testing over the last 2 weeks it was determined that the protect monitor
on the T1-MK2 target had an issue with intermittent shorting between the high voltage line and ground (movement of the target ladder was causing the short
to come and go).
Entry  Tuesday, April 16, 2019, 15:35, Keith C Ng, Repair, Other, M9, M9 project post shutdown summary 
 Completed work at m9 beam line:
- Removed existing service stand and associated cable and water services. Legacy b1 water services still need to be removed for future magnet installation.
Old service stand is currently in warm cell waiting for disposal.
Entry  Tuesday, February 26, 2019, 10:55, Isaac Earle, Maintenance, Target 1, Cooling, T1 and T2 MRO work and solenoid valve change summary 
The following work was completed between Jan 16 - Feb 19, 2019:

    T1 and T2 cooling packages drained to South TNF holding tank, water sampled and tested, released after approval from RPG
    T1
resin can swapped
    All Cuno filters changed at T1 (3 total)
    T1 inlet (T1CSPGIN) and outlet (T1CSPGOUT) pressure gauges replaced
Entry  Friday, January 25, 2019, 10:53, maicodallavalle, Repair, Other, Cyclotron electrical, Cyclotron Elevating system Motor electrical wire repairs 
2018 Cyclotron lid up problem. Station #9 was  found to  have the motor wires along the beam plain had damaged wire insulation. There were
bare wires in the conduit resulting in the wires shorting out. The wires were repaired with a quick short replacement. Lid went up for in tank work. After
lid down the problem was investigated. We checked the radiation levels   at all  of the stations to come up with a plan to determine witch of
Entry  Thursday, January 10, 2019, 13:51, Isaac Earle, Maintenance, Target 1, Cooling, T1 and T2 cooling packages inspected 
The T1 and T2 cooling packages were inspected today while running.  No water leaks were observed at either package including the high-active loops
and copper active. 
The T1 pump was fairly noisy (video was taken to record the sound).  This is the new pump installed in August 2018 (see E-Log #242). 
Entry  Thursday, November 01, 2018, 13:57, Keith C Ng, Other, Other, Other, nuclear venillation in hot cells not working 
Randomly checked on the nuclear ventilation for the Meson Hall Hotcells and discovered they were not running again (both magnahelic gauges displayed
zero). Attempted to restart the fan manually and the control box seems to not be working. Matt McClean has been contacted and they will look into the problem.

The nuclear ventilation is currently not running in the RHMH hot cells.
Entry  Thursday, October 25, 2018, 08:58, Keith C Ng, Repair, Other, Other, T1 collimator valve solenoid coil replaced again 
On 23rd October we restarted the T1 and T2 water packages after the mini shutdown and after the site power outage.
The rotary collimator was reporting no water flow and it was assumed the valve coil (
Entry  Thursday, September 06, 2018, 13:49, Isaac Earle, Repair, Target 1, Cooling, T1 cooling package secondary side solenoid failed 
 On Friday Aug 31 at approximately 3am T1CS:FGSEC dropped to 0gpm flow.  This was confirmed to be a real reading when T1CS temperatures continued
to rise steadily.  Beam was turned off, and T1CS later turned off by operators (temps continued to rise due to heat from pump).  The cooling
package was uncovered in the morning, and the T1CS:SVSEC solenoid was replaced by Doug Preddy and Keith Ng.  This solved the problem and the package
Entry  Tuesday, August 28, 2018, 11:16, Isaac Earle, Standard Operation, Other, Other, South TNF Holding Tank water released 
 The water in the South TNF Holding Tank was released today under work permit #C2018-08-28-3.  The tank contained approximately 100L from the
T1 cooling package (drained Aug 16, 2018) and 350L from the 500MeV system (drained April 23, 2018 by Steve Sapriken).
Entry  Thursday, August 23, 2018, 11:52, Isaac Earle, Repair, Target 1, Cooling, T1 cooling package pump failure and replacement TUS1801057_Triumf.pdf
On Wednesday August 15th the T1 cooling package tripped off, and could not be restarted.  On the EPICS screen the pump device went into an immediate
time-out each time we attempted to turn it on.  An electrician was involved in the debugging, and issues were found with the 480V supply.  The
breaker switch in the 480V supply panel was found to be damaged, and was replaced.  The relay in the contactor box for the pump motor thermal protection
Entry  Monday, July 23, 2018, 09:39, Isaac Earle, Repair, Target 1, Cooling, T1 collimator solenoid valve failed - Solenoid replaced 
On Saturday July 21st the T1 Collimator solenoid valve would not re-open after tripping closed due to a (planned) loss of vacuum.  Shielding was
removed and the valve solenoid was replaced which fixed the problem.  The original valve body was left in place.
This is the second time the solenoid at this location failed (See E-Log #239), and the latest of several failures of these new 24VDC solenoids
Entry  Tuesday, July 03, 2018, 11:09, Isaac Earle, Repair, Target 1, Cooling, T1 cooling package outlet water pressure sensor replaced 
 The T1 cooling package outlet water pressure sensor (B1A:T1CS:PGOUT) was replaced this morning with a new unit.  Over the last few months
the sensor readout had been steadily decreasing (from around 20psi to 4psi) with no corresponding decrease in inlet pressure, and no change in the circuit
flowrate (this is how these pressure sensors typically fail).
Entry  Friday, June 01, 2018, 17:50, Isaac Earle, Repair, Target 1, Cooling, T1 collimator solenoid valve coil replaced 
Flow stopped through the T1 collimator cooling loop around the same time as a power bump this afternoon.  The problem was narrowed down to failed
solenoid valve B1A:T1:SVCOL by comparing coil resistance to other units without issue (~1.0ohm vs 3.6ohm for working units), measured at the T1/T2 PLC
cabinet.  Shielding above the T1 package was removed and the solenoid coil was replaced with a new unit.  After replacement the valve works as
Entry  Thursday, May 10, 2018, 15:23, Isaac Earle, Repair, Target 1, Target, T1-MK2 protect monitor and profile monitor replaced 
During first injection of beam down 1A problems were encountered with the T1 protect monitor.  Testing was done by Probes Group from the mezzanine
leading to the following investigation and repair work.
 
Entry  Friday, April 13, 2018, 14:21, Isaac Earle, Maintenance, Other, Other, M20 beam blocker MRO and T1/T2 final checks 
The M20 beam blocker main shaft seals were replaced as per the T1/T2 target device maintenance schedule.  Both air cylinders were found to be leaking
past the seals, and the blocker would not actuate in the hot cell even with 100psi (max site air) so they were also replaced.  With the new cylinders
the blocker actuated smoothly at about 45psi.  It is recommended that the air cylinders be replaced every second service (once per 10 years). 
Entry  Tuesday, April 10, 2018, 11:20, Isaac Earle, Maintenance, Other, Cooling, T1 and T2 cooling package shutdown MRO work 
 The following work was performed on the T1 and T2 cooling packages during the 2018 shutdown:
- T1 and T2 cooling packages both sampled and drained to South TNF holding tank
- Water released after testing and approval from RPG
Entry  Friday, April 06, 2018, 15:05, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 target MRO 
The following is a summary of MRO work done on the T2-MK2 target during the 2018 shutdown:

 
Jan 8:
Entry  Wednesday, March 28, 2018, 10:12, Isaac Earle, Standard Operation, Other, Other, Five waste pails moved to East Vault Tunnel for storage 
 Five 5 gallon metal pails with active waste were moved from the Warm Cell to the Cyclotron East Vault Tunnel today for long term storage. 
The pails were labeled with radioactive item tags and storage item numbers (1442 through 1446).  The pails contain used resin from T1, T2, and STF,
as well as one pail with active metal parts.
Entry  Thursday, March 22, 2018, 17:24, Isaac Earle, Standard Operation, Other, Active Sump, RH Lab active sump released 
 The RH Lab active sump level reached the high limit yesterday due to an overflow of the ultrasonic cleaner in the Rad Waste Area.  The sump
was sampled by RPG, and after analysis the water was approved for release.  The water was pumped out today.  Local and MCR alarms functioned
as expected.
Entry  Wednesday, January 10, 2018, 17:45, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 beam spot photos, M20BB moved to storage pit T2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018.jpgT2-MK2_Position_4_beam_spot_photo_-_12mm_Be_-_Jan_10_2018_s.jpg
 The T2-MK2 target was moved from the beamline to the hot cell on January 8th.  The field at 0.5m was 130mSv/hr.  Photographs of the beam
spot of the Position 4 target are attached below.  This is a 12mm beryllium target (ID: "JUL.06#4).  This is the only target on the T2 ladder
that has seen beam since it was installed on October 10, 2017.  A shielding plug was installed on the T2 flange.  A new 5cm target will be installed
Entry  Thursday, December 07, 2017, 13:54, Isaac Earle, Development, Other, Other, Waste pails transferred from warm cell storage bunker to rad waste pit IMG_0102.JPGIMG_6285.JPGIMG_0102.JPGIMG_6285.JPG
Six 5 gallon pails were transferred this morning from a temporary storage bunker in the Warm Cell to the Rad Waste Pit for long term storage.  The
pails contain various BL1A active waste from the East Hot Cell including dozens of irradiated beryllium and graphite targets.  The field from the
pails ranged from 0.1 to 9mSv/hr at 0.5m.  The work was performed according to the clean-out procedure (Document-142965). 
Entry  Thursday, October 26, 2017, 16:12, Isaac Earle, Repair, Target 1, Cooling, T1 collimator solenoid valve replaced 
 Around 10pm on Sunday Oct 22 beam was tripped multiple times due to low flow for the T1 collimator cooling circuit (B1A:T1:FGCOL).  Temperature
of the collimator (TC7COL, TC8COL) was monitored with reduced beam current and no increase was observed leading to the conclusion that flow was OK and
the flow gauge was faulty.  Normal operation continued until around 1:30am on Oct 26 when the collimator thermocouples both rose quickly, causing
Entry  Tuesday, October 10, 2017, 12:09, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 position 4 target changed 20171005_t2target_0010.jpg20171005_t2target_0015.jpg20171005_t2target_0016.jpg
The following work was performed on the T2-MK2 target assembly during the 2017 fall shutdown:
 
Oct 4, 2017:
Entry  Tuesday, August 29, 2017, 12:17, Isaac Earle, Maintenance, Target 1, Target, T1-MK1 and T2-MK1 Hansen water fittings replaced 
 The #6 male Hansen fittings for the T1-MK1 and T2-MK1 targets (both currently stored in the target storage pit) were replaced today with new units.
 Some of the target assembly Hansen fittings had shown signs of leaking and the internal seals are not easily replaced.
"120V" warning labels were put on the micro-switch IN and OUT limit sensors for the profile monitors on both targets.  These are
Entry  Thursday, July 27, 2017, 09:34, Keith C Ng, Development, Other, Other, test 2 
test 2
Entry  Thursday, July 27, 2017, 08:57, Isaac Earle, Other, Target 2, Cooling, Failed T2CS:SVSEC valves investigation 
 The three failed T2 cooling system secondary side solenoid valves were tested yesterday to try to determine the problem.  The test steps are
detailed below:

    New spare valve (NSV) produced audible "click" and valve was seen to physically open when 24V DC driving voltage was applied
Entry  Tuesday, July 25, 2017, 19:23, Isaac Earle, Repair, Target 2, Cooling, T2 Heat Exchanger Secondary Side Solenoid Valve Failure (again) 
 At approximately 13:50 today the T2 cooling system secondary side solenoid valve (T2CS:SVSEC) failed to a closed position.  This was the same
location where the valve failed on July 10th (E-Log #224), and also in Nov 2016 (E-Log #211).  This repeated failure does not seem like a coincidence,
so instead of replacing the valve with a new unit, it was bypassed temporarily until we can determine the cause of the failures.  A 3/4" FNPT
Entry  Monday, July 10, 2017, 16:20, Keith C Ng, Repair, Target 2, Target, T2 Heat Exchanger Secondary Side Solenoid Valve Failure  20170710_t2_water_package_repair.pdf
The T2 heat exchanger secondary side solenoid failed on July 9 at approximately 19:30 (EPICS ID: B1A:T2CS:SVSEC).  The valve was replaced with a
spare and the cooling package is now running normally.
The valve at this location also failed in November 2016:  https://elog.triumf.ca/TIS/RH-Meson+Hall/211 
Entry  Monday, May 15, 2017, 16:55, Isaac Earle, Other, Target 2, Target, T2 profile monitor actuation issue 
 On Thursday May 11th operators attempted to move the T2 profile monitor (T2-MK2) to the IN position but were unsuccessful.  The monitor would
leave the OUT limit, but would not reach the IN limit.  This was repeated 2 times. The air amplifier was inspected and nothing out of the ordinary
was noted.  The T1 profile monitor was tested and was working properly.  At the time it was suspected that the monitor cassette had become dislodged
Entry  Tuesday, May 09, 2017, 16:35, Isaac Earle, Repair, Target 2, Cooling, T2 target water flow gauge paddle wheel changed T2CS_FGTGT_strip.jpg
 During the target move on Thursday May 4th the paddle wheel and paddle wheel shaft for the T2CS:FGTGT sensor were changed to address transient
spikes of approximately +/-1.0 gpm which were causing nuisance trips.  There have been no transient spikes recorded since the change, and the nominal
flow value dropped from 4.9gpm to 3.6gpm.  Fault report #9836 has been returned, and the warning and trip levels, which were set higher to avoid nuisance
Entry  Friday, May 05, 2017, 15:09, Isaac Earle, Development, Target 2, Target, T2-MK2 beam spot check in hot cell T2MK2_Position_1_and_2_Exit.JPGT2MK2_Position_2_Entrance.JPGT2MK2_Position_2_Exit.JPGT2-MK2_profile_monitor_dislodged.JPG
 On May 5th the T2-MK2 target was moved to the hot cell for the purpose of checking the beam spot on the Position 2 beryllium target to confirm
the results of the T2 area realignment detailed in E-logs #218 and #220.  In preparation beam was put on this target overnight for approximately 1.5hrs
at 10uA and 4 hours at 50uA (previously had not seen beam).  Also, there had been issues with the T2 profile monitor over the last couple days, so
Entry  Tuesday, April 11, 2017, 17:31, Isaac Earle, Development, Target 2, Target, T2-MK2 target MRO and alignment of T2 devices T2-MK2_-_2017.pdf
The following work was performed on the T2-MK2 target assembly and the T2 Protect assembly for maintenance purposes and to implement the alignment
strategy detailed in E-Log #218:
 
Entry  Tuesday, April 11, 2017, 17:02, Isaac Earle, Maintenance, Target 2, Cooling, T2 Cooling System MRO 
 The following work has been completed on the T2 cooling package:
- T2 system drained to South TNF holding tank (completed in Jan 2017, water already released)
- Target water and demin. circuit Cuno filters changed
Entry  Wednesday, April 05, 2017, 17:55, Isaac Earle, Development, Other, Target, T2 area devices alignment strategy Re__T2_target_and_protect_adjustment.pdf
A strategy for alignment of the T2 protect monitor, T2 target, and T2 Collimator A was discussed today and decided upon by Yuri Bylinski, Isaac Earle,
Yi-Nong Rao, and Roman Ruegg.  The purpose of the adjustment is to try to reduce the amount of beam lost as it passes through the T2 area (presumably
being blocked by the collimator because it is not possible to steer the beam through all three devices in their current configuration).  Keeping in
Entry  Thursday, March 30, 2017, 09:48, Isaac Earle, Development, Other, Controls, T1/T2 control system de-glitching & target ID changes 
 The following changes were made to the T1/T2 PLC control system:
- De-glitching system investigated and Tony discovered that it was programmed incorrectly:  the de-glitch time was observed only when a PV
changed from bad state to good, not the opposite (meaning there was actually no de-glitching in place since system start-up in 2016!).  This was reversed
Entry  Monday, March 27, 2017, 16:15, Isaac Earle, Repair, Target 1, Cooling, T1 Cooling System Target Water Return Hose Damaged IMG_8077.JPGIMG_8076.JPG
The 18' shielding block which lies west of the T1 cooling package was removed on Friday Mar 24 so that vacuum equipment could be craned into the 1A tunnel.
 During replacement, the flexible SS hose for T1 target return water got caught under the block and was ripped apart.  Workers in the area did
not realize this had occurred.  The cooling package tripped off when the hose ripped (likely due to low water flow or low supply pressure).  In
Entry  Wednesday, March 15, 2017, 16:13, Isaac Earle, Standard Operation, Other, Active Sump, Meson Hall Hot Cell Lab Active Sump Water Released 
 On March 13th in the morning the Meson Hall Hot Cell Lab active sump reached the high level sensor.  The system responded as expected:  high
level panel warning light illuminated, siren sounded, and MCR notified via "B1 RCR1 RM6 WARN".  A 1L sample was delivered to RPG for analysis.
 After approval, the sump was pumped out over the following two days.  The procedure in Document #64834 was followed for sampling and pump-out.
Entry  Thursday, January 19, 2017, 08:55, Isaac Earle, Standard Operation, Target 1, Cooling, T1 MRO work complete 
The following work was completed on the T1 cooling package:
- water drained to BL1A holding tank
- all resevoir o-rings changed
Entry  Thursday, January 12, 2017, 09:21, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Position 1 Beam Spot T2-MK2_Posn_1_Beam_Spot_-_Jan_11_2017.jpgT2-MK2_Position_1_Beam_Spot_Measurements_-_Jan_11_2017.pdf
 The beam spot on the 10cm beryllium target in Position 1 on T2-MK2 (Target ID: "OCT.06#3") was measured and photographed yesterday.  A
fairly well centered spot was measured to be approximately 4.6mm wide x 5.2mm tall on the entrance window and 5.7mm wide x 7.6mm tall on the exit window
using the Nikon micrometer level.  This target first saw beam on June 16, 2016.
Entry  Monday, January 09, 2017, 15:07, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target Moved from BL to HC 
 The T2-MK2 target assembly was moved from the beam line to the hot cell today.  A maximum field of 203mSv/hr was measured at approximately
0.5m
A steel shielding plug has been installed in the T2 hole to reduce shine and allow the T2 volume to be pumped down.
Entry  Thursday, November 17, 2016, 17:58, Isaac Earle, Repair, Target 2, Cooling, T2 Heat Exchanger Secondary Side Solenoid Valve Failure 
 At approximately 11am today the T2 cooling package heat exchanger secondary side water flow suddenly dropped from ~11gpm to 0.  This was confirmed
to be a real reading by observing that with no secondary cooling both the inlet and outlet target water temperatures rose steadily with beam on the target.
 While standing on the blocks in the T2 area and having a controls expert (wither "superuser" access mode) actuate the secondary side solenoid
Entry  Thursday, October 06, 2016, 12:16, Isaac Earle, Development, Target 1, Controls, Expansion Tank High Level Warning Added 
 An expansion tank high level warning has been added to the T1/T2 control system under Work Request #4011.  The purpose for this new warning
is to alert staff of an unexpected water increase in the unlikely scenario that a leak develops in the heat exchanger between the two fluids and CuALCW
on the secondary side enters the target water system.  The new thresholds for high level warn, low level warn, and low level trip have been set at
Entry  Friday, September 30, 2016, 16:59, Isaac Earle, Repair, Target 1, Cooling, T1 Cooling System Inlet Pressure Transducer Replaced 
 The T1 cooling system inlet pressure transducer (EPICS ID: B1A:T1CS:PGIN,  Omega part # PX315-100GI) began failing in August (exhibited gradual
decline in pressure with no corresponding change to flow rate or outlet pressure).  A new transducer was installed on Sept 30 2016 which fixed the
problem.  Cyclotron Fault Report #9238 was returned and the temporary bypass on the warning level was removed.
Entry  Friday, September 30, 2016, 16:54, Isaac Earle, Repair, Target 1, Target, T1-MK2 - New Beryllium Targets Installed T1-MK2_Posn_4_Entrance_Window_Beam_Spot_-_Sept_27_2016.JPGT1-MK2_Posn_4_Exit_Window_Beam_Spot_-_Sept_27_2016.JPGTarget_Info_Sheet_&_Elevations.pdf
 The following work was performed on the T1-MK2 target assembly during the September 2016 Mini-shutdown:
 
Monday Sept 26:
Entry  Thursday, September 08, 2016, 17:26, Isaac Earle, Development, Other, Active Sump, New Active Sump High Level Switch and Electronics Installed IMG_7381.JPGIMG_7386.JPGRH_HC_Lab_Active_Sump_High_Level_Sensor_-_Electrical_Schematic.pdf
To address the deficiencies identified in E-Logs #204 and #205 the old active sump high level switch was replaced with Omega LV164SS model (316SS stem
and float, 4' length, standard mount) using adaptor flange TRH1316 to mount to the top flange of the sump.  A new electrical box was also installed
(circuit diagram attached in PDF format).  The circuit was designed by Don Jackson and wired by Travis Cave.  Connection to the RCR Lab PLC was
Entry  Tuesday, August 30, 2016, 14:09, Isaac Earle, Development, Other, Controls, T1/T2 PLC Code Update 
 A new version of the T1/T2 PLC code has been uploaded to the PLC CPU.  The main change in the new version is a fix to a bug related to the
target MK# which may have caused the previous CPU crashes.  The EPICS interface now needs to be updated so that no target information is displayed
on the EPICS screens when there is no target installed, or jumpers for both MK1 and MK2 are detected.  This must be tested during the next maintenance
Entry  Wednesday, July 06, 2016, 13:31, Isaac Earle, Other, Other, Active Sump, Active Sump RCR Lab and MCR Alarms Not Working - Suspect Controls Issue 
Further tests were done on the active sump high level float switch today.  The switch was triggered 1 time by filling the sump, and approximately
8 times by tilting the sensor manually.  A local alarm sounded in the hot cell lab each time, but only one time in the RCR Lab and MCR (this occurred
on the final trial).  Fault report #9099 has been submitted to Controls Group.  Although the existing float sensor did cause a local alarm when
Entry  Tuesday, June 28, 2016, 16:28, Isaac Earle, Other, Other, Active Sump, RH MH Hot Cell Lab Active Sump High Level Sensor Test 
 The high level sensor for the Meson Hall Hot Cell Lab Active Sump was tested today and worked as expected.  When the sensor is tilted (as
occurs when the water level rises above it) an audible alarm sounds in the hot cell lab, and the Safety Panel in the MCR also alarms with "MHESA B1
RCR1 RM 6 WARN" displaying NOT OK.  This alarm sounds every 3 minutes in the MCR until the PLC outside of the RCR lab is reset.  When the
Entry  Tuesday, June 28, 2016, 08:32, Isaac Earle, Other, Other, Active Sump, RH MH Hot Cell Lab Active Sump Overflow 
 A call was received from the MCR at approximately 21:30 on Monday June 27th to report that active drains in the east end of the Meson Hall were
backing up and overflowing.  I came in and found the leak coming from a broken spray nozzle in a sink in the rad waste area.  The leak was stopped
at which point there were puddles between 1-2m diameter around the active sump top flange, the drain directly south of the warm cell water windows, and
Entry  Tuesday, June 21, 2016, 09:25, Isaac Earle, Development, Other, Controls, T1/T2 EPICS System With-Beam Testing T1T2_EPICS_Section_7_Commissioning_Results.pdf
 With-beam commissioning tests were completed today by Tony Tateyama and Isaac Earle.  The test results are attached in PDF format.  These
tests are described in Section 7 of the Commissioning Plan (Document-118467 Release #2).  These tests were not part of the official commissioning,
but intended as an additional check of system functionality with beam on, and to confirm that the CCS current protection system performs as expected.
Entry  Wednesday, June 15, 2016, 11:00, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target Moved to Position #1 
 Position #4 on the T2-MK2 target has now reached the maximum beam time.  The target was moved to Position #1 at the nominal elevation.  This
target should be used for the remainder of the 2016 running period.
Entry  Friday, May 13, 2016, 15:04, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Position 4 Adjusted to +1.5mm Offset 
The T2-MK2 target at Position 4 has been adjust to approximately +1.5mm offset.  This causes the ladder to be moved downwards, raising the beam
spot location on the target window.  The potentiometer ratio at this offset is approximately 0.810 (> 0.8059 nominal ratio for position 4, and
therefore closer to Position 5)
Entry  Friday, April 22, 2016, 14:45, Isaac Earle, Other, Other, Active Sump, RH MH Hot Cell Lab Active Sump Water Released 
The Remote Handling Hot Cell Lab Active Sump has been released to city sewer following the procedure in Document-64834.  The water was close to
the sump high limit switch (approximately 5800L).  Before release the water was sampled, tested, and approved for release by RPG.  The tritium
analysis form has been filled out and returned to RPG,.
Entry  Wednesday, April 20, 2016, 10:01, Isaac Earle, Standard Operation, Target 1, Target, T1/T2 Monitor Electrical Check Complete 
Mike Russell from Diagnostics Group has completed an electrical check on the T1 and T2 profile and protect monitors.  He reports that both profile
monitors look fine.  The T1 protect monitor looks fine except for a weak or missing signal from the halo monitor.  The T2 protect monitor looks
fine.
Entry  Friday, April 15, 2016, 14:54, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target Changes & Return to Beamline T2-MK2_Position_4_Entrance_Side_-_April_14_2016.JPGT2-MK2_Position_4_Exit_Side_-_April_14_2016.JPGIMG_7024.JPGIMG_7026.JPG
On April 11th the T2-MK2 target was flushed with water, then overnight with air at 5psi supply pressure.  The target ladder was in Position 0 for
this procedure.
On April 12th the target was pumped using a cold trap and the Varian leak detector for approximately 2 hours.
Entry  Monday, April 11, 2016, 13:54, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target Transported from BL to HC 
The T2-MK2 target was transported from the beam line to the hot cell using the transfer flask.  The target was measured to be 120mSv/hr at 0.5m.
 The steel shielding plug was installed in the T2 target hole to reduce upwards shine.
New beryllium target cassettes will be installed on the target ladder before it is returned to the beam line.
Entry  Monday, April 11, 2016, 13:51, Isaac Earle, Development, Other, Other, Target Transfer Flask Hoist Hook Lower Limit Adjusted 
 The lower limit of the flask hoist hook has been adjusted.  The travelling nut for the lower limit was rotated 3 notches closer to the upper
limit travelling nut which resulted in an additional 1-3/8" travel of the hook at the lower limit.  The door hinges and door cable pulleys were
lubricated with WD-40 and actuation of the doors was tested several times.
Entry  Thursday, April 07, 2016, 16:44, Isaac Earle, Development, Other, Controls, T1/T2 Controls "Assembly Tests" Completed 
The T1/T2 Control System "Assembly Tests"  (Document 118467 Release #1, Section 5) have been completed.  The expected result, as
written in the document, occurred for every test.  The T2 Shield Thermocouple #3  (B1A:T2:TC3SHLD:RDTEMP) showed slightly erratic behaviour when
viewing archived data.  It is uncertain at this point whether or not it will need to be bypassed in the B1A:T2:TGTRDY interlock.
Entry  Thursday, March 31, 2016, 11:48, Isaac Earle, Standard Operation, Target 1, Target, T1 & T2 Beryllium Target Manufacturing Complete T1_T2_Be_Target_Documentation_(2016_Batch).xlsx
Manufacturing of a new batch of T1 and T2 beryllium targets has been completed.
The job was completed under Machine Shop Work Order #41527.  Eleven 12mm T1 targets (TBP1683) and seven 10cm T2 targets (TBP1691) were completed
(exhausting all stock of the leftover EDM'd target housings).  The target window profiles (TBP1695) were laser cut at an outside shop for greater
Entry  Thursday, March 24, 2016, 15:38, Isaac Earle, Development, Target 1, Target, T1/T2 Beryllium Target Test Jig Fabrication Complete IMG_6904.JPG
Fabrication of the T1/T2 beryllium target testing jig (TBP1721) was completed today by Dan MacDonald.  With a target installed across the test ports,
the inside volume pressurized with air to 103psi, and both ball valves closed, there was no noticeable drop in pressure over a 16 hour period.  This
result was deemed satisfactory for use of the jig for hydrostatic testing of new targets.
Entry  Thursday, March 24, 2016, 14:46, Isaac Earle, Other, Other, Other, TNF / 500MeV Resin Cans Removed from Storage Pit #1 
Three used TNF / 500MeV system cooling system resin cans were removed from the Meson Hall target storage pit (two from Hole #1, one which was stored
below block #1).
Two new active cans will be returned to Hole #1 after the TNF resin is changed in a few weeks time.
Entry  Wednesday, March 16, 2016, 16:50, Isaac Earle, Development, Target 2, Controls, Preliminary Testing of T2 Control System Complete T2_Testing_Checklist_-_Complete_-_March_16_2016.pdf
Preliminary testing of the new PLC control system and EPICS interface was completed today for
the T2 target, T2 cooling package, T2 collimators, and T1 thermocouples.  All systems behaved as specified.
Review of the commissioning plan is currently underway.
Entry  Monday, March 07, 2016, 18:22, Isaac Earle, Development, Target 1, Controls, Preliminary Testing of T1 Control System Complete T1_Testing_Checklist_-_Complete_-_March_7_2016.pdf
 Preliminary testing of the new PLC control system and EPICS interface was completed today for the T1 target, T1 cooling package, and T1 collimator.
 All systems behaved as specified.  This test did not include testing of any T1 thermocouples which will be included as part of the T2 test program
to follow.  This is not considered system commissioning, which will follow after all preliminary testing is complete and the commissioning plan document
Entry  Wednesday, February 24, 2016, 13:03, Isaac Earle, Repair, Other, Other, Target Flask 2-Ton Hoist Chain Twist Corrected 
 A 1/2 turn twist in the target flask hoist chain has been corrected to address a deficiency observed by inspectors by Gordon Crane.  This
was accomplished by first holding the flask door yoke at the top position using rope slings, then lowering the hook block spider approximately 6",
then lifting the stationary end of the hoist chain approximately 2" using the Meson Hall main crane to make the top of the chain slack.
Entry  Wednesday, February 03, 2016, 17:35, Isaac Earle, Standard Operation, Target 2, Cooling, T2 MRO Work 
The following work was performed at the T2 cooling package and target between Jan 25 - Feb 3, 2016:
- Cuno water filters removed (2), and new filters installed
- Target water solenoid, H.E. secondary side solenoid, Collimator A solenoid, and Collimator B solenoids removed and replaced with new 24V DC versions
Entry  Monday, January 25, 2016, 16:54, Isaac Earle, Maintenance, Target 1, Cooling, T1 MRO Work 
The following work was performed at the T1 cooling package and target between January 18-21, 2016:
- Cuno water filters removed (3), and new filters installed
- Target water solenoid, H.E. secondary side solenoid, and Collimator A solenoids removed and replaced with new 24V DC versions
Entry  Monday, January 18, 2016, 17:19, Isaac Earle, Standard Operation, Target 1, Cooling, T1 & T2 Packages Drained; BL1A Holding Tank Released 
 The T1 and T2 cooling packages were drained to the BL1A holding tank on Jan 8 2016.  The volumes were 100L and 80L respectively.  Before
starting there was 350L of water in the holding tank from the 500MeV system which Steve Sapriken drained in September 2015.  The T1 and T2 systems
were sampled and delivered to RPG.  After receiving permission from RPG to release all 3 portions of water it was pumped into the city sewer on Jan
Entry  Thursday, December 17, 2015, 13:31, Grant Minor, Development, Other, Target, T1/T2 Target Cassette - window / end cap manufacturing change (WO 41527) Left_new_right_old_ref_TBP1683_16Dec2015.JPGTBP1690_left_new_right_old_16Dec2015.JPGTBP1683_forming_tool_16Dec2015.JPGNew_Frame_Ref_TBP1696_16Dec2015.pdf
Isaac Earle has recently been managing the fabrication of some new Be  target cassettes for the T1 / T2 Meson Hall target ladders (WO 41527). 

The machine shop has outsourced the cassette tubes to an external shop  for wire EDM cutting, as it produces a much more repeatable and  consistent
Entry  Thursday, November 05, 2015, 17:07, Isaac Earle, Repair, Target 2, Target, T2-MK1 Profile Monitor Repair and Pos'n 3 Target Removal 8x
The following work was performed on the T2-MK1 target.  The profile monitor and monitor cage on this target were damaged in January 2013, See E-Log
#68
Oct 23:
Entry  Tuesday, October 13, 2015, 10:52, Isaac Earle, Standard Operation, Target 1, Target, T1 & T2 Target Ladder Moves 
 The T1 and T2 targets were both moved from Position 0 to Position 4 at approximately 2:30am on Saturday October 10th using the portable control
box.  Operations had tried to move the T1 target to position 4 using the old control system but for unknown reasons it would move to any position
except position 4 and the portable control box had to be used.  The portable control box should continue to be used for T1 and T2 target moves until
Entry  Friday, October 09, 2015, 15:52, Isaac Earle, Repair, Target 1, Target, T1-MK2 Protect Monitor Replacement and Inspection 12x
When the damage to the T2 Protect Monitor was found to be caused by flying debris from a vacuum spike (see e-log #179), it was decided that the T1 Protect
Monitor should also be replaced.
Entry  Friday, October 09, 2015, 15:18, Isaac Earle, Repair, Target 2, Target, T2-MK2 Check at Hot Cell and Motor Drive Cable Replacement 7x
While the T2 monolith was uncovered for T2 Protect repair (see previous e-log), it was decided that the T2 target should be moved to the hot cell to
address issues discovered last week with target ladder movement (see e-log #175)
 
Entry  Friday, October 09, 2015, 14:56, Isaac Earle, Repair, Target 2, Other, T2 Protect Monitor Replacement 9x
On Monday Oct 5th a decision was made to uncover and remove the T2 Protect Monitor due to faulty readings.  The monitor had been behaving
strangely since the September shutdown, and had been getting worse over time.
- Blocks were removed over T2 starting Monday afternoon.  It is necessary to remove the narrow 12' block and two 6' blocks west of the T2
Entry  Tuesday, October 06, 2015, 14:04, Isaac Earle, Other, Other, Controls, Instructions for loading display screen for T1/T2  
 The following instructions were provided by Graham Waters:
 
From diag5pc bootup 
Entry  Monday, October 05, 2015, 15:25, Isaac Earle, Standard Operation, Other, Other, Old T2 Protect Monitor Cassette Update 
 The T2 protect monitor cassette removed in April 2015 (see E-log #154) was surveyed today.  It was approximately 3mSv/hr at 0.5m and 15mSv/hr
on contact.  It is unlikely that this monitor will ever be cool enough for hands-on elevation adjustment that it requires, therefore it has been bagged,
labeled, and transferred to the east hot cell for storage.  
Entry  Friday, October 02, 2015, 17:25, Ron Kuramoto, Standard Operation, Target 1, Target, Raise Target to lower Rad levels for 1AM7 repair 
Today the T1MK2 target was moved from Position 4 to Position 0 to lower the Rad fields for the 1AM7 repair in the 1A Tunnel. The Rad levels were still
to high only dropping by 1000uSv/Hr to 5000uSv/Hr, so the 1AM7 repair is planned for next Tuesday's maintenance day on Oct 6th.  1A will be off till
then giving a longer cool down. 
Entry  Thursday, October 01, 2015, 11:43, Isaac Earle, Repair, Target 2, Target, T2-MK2 Target Ladder Drive Motor Failure 
 The stepper motor that drives the target ladder on T2-MK2 has failed.  This is the cause of the difficulty moving the target ladder yesterday
afternoon (see previous e-log).  This was confirmed this morning by attempting to move the T1-MK1 target ladder in the storage pit using the portable
control box - the ladder moved with no issues.
Entry  Wednesday, September 30, 2015, 17:07, Isaac Earle, Standard Operation, Target 2, Target, Target Moves for Profile Check - Possible Motor or Control Box Failure 
The T1 and T2 targets were moved to position zero, then back to the target position today so that beam profile could be checked using the profile monitors.
 Movement for both targets was done with the portable control box.
The T1 target was moved from Position 4 to Position 0, then back to Position 4 (after checking the profile) with no issues.
Entry  Monday, September 28, 2015, 11:33, Isaac Earle, Repair, Other, Water Leak, Warm Cell Water Window Repair Complete 
The warm cell water window tanks were filled on September 17 after 2 weeks of curing time.  A water leak was found coming from the seals of a plastic
pipe joining the two tanks near the top.  This was repaired using rubber gaskets and quick cure caulking.  The tank was refilled on September
18 and no longer leaked from that location.  The sand filter was backflushed with the water exhausted to the grass area outside the hot cell lab until
Entry  Monday, September 28, 2015, 10:29, Isaac Earle, Standard Operation, Other, Active Sump, RH Hot Cell Lab Active Sump High Level Sensor Tested 
 The RH hot cell lab active sump high level sensor was tested as part of the yearly scheduled inspection.  High water level was simulated by
tilting the sensor sideways with a long pole sample scoop.  The Main Control Room and Hua Yang from Nuclear Medicine were notified before the test.
 The alarm sounded as expected, and a message was received in the main control room.  This is a latching signal, so a Control Room operator will
Entry  Thursday, August 27, 2015, 15:47, Isaac Earle, Repair, Other, Water Leak, Warm Cell Water Window Seal Replacement Update 
Since the previous E-Log the following tasks have been completed:
- Panel spacer rods installed at 4 locations in each tank (two top, two bottom at approximately 1/3 and 2/3 the way across)
- Spacer rods expanded only slightly to begin compressing the rubber window spacers while still leaving at least a 8mm gap between window and frame
Entry  Wednesday, August 19, 2015, 12:10, Isaac Earle, Repair, Other, Other, Warm Cell Water Window Seal Replacement Status 6x
The following tasks were completed over the past 2 weeks:
- Aquarium Technology Ltd. (UK) was contacted regarding best method for replacing window seal.  A detailed procedure was provided (attached
below)
Entry  Thursday, August 13, 2015, 09:47, Isaac Earle, Development, Other, Other, "Clamp A" disassembled and used to build clamp "TRH1257-#01" 
The 4" Marman flange clamp (IRH0001) labeled "Clamp A",  as used in the testing detailed in Document-114623 Release 1, has been disassembled.
 The parts were used to build a TRH1257 clamp which uses the new TRH1259 jaw with 0.480" jaw root width.  This new clamp has been labeled
"TRH1257-#01", and will be tested with Helicoflex H-303654 seals in the near future.
Entry  Friday, July 17, 2015, 10:14, Isaac Earle, Development, Target 1, Target, T1/T2 Be Target Failure History & Replacement Plan T1_and_T2_Be_Target_History_-_July_17_2015.pdf
T1 and T2 beryllium target failure history was investigated back to 2000 (as far as XSTRIP records were readily available).  For each target cassette
the following were noted: length of time the target was subject to direct beam, length of time the target was on the ladder w/o direct beam, and method
of failure.  The purpose of the study was to devise a target replacement strategy so that T1 and T2 beryllium targets are preemptively retired from
Entry  Wednesday, July 15, 2015, 10:33, Isaac Earle, Standard Operation, Target 1, Cooling, T1 & T2 Cooling System Check 
- All T1 and T2 values on XTPAGE were stripped back to April 1, 2015:  All systems appear to be functioning normally, nothing unusual observed
- Expansion tank levels checked visually:  T1 level at 1/2" above top sensor nut, T2 level at 1/4" below top sensor nut --> filled
to 1/2" above
Entry  Thursday, July 09, 2015, 13:51, Isaac Earle, Development, Other, Target, New T1 and T2 Beryllium Targets Ordered 
An order for new T1 and T2  beryllium targets was submitted to the TRIUMF machine shop today.  A total of seven T2 targets and twleve T1 targets
were ordered to match existing stock of wire EDM target shells.  All required materials were supplied.  Completion by October 30, 2015 was requested.
 
Entry  Wednesday, July 08, 2015, 16:21, Isaac Earle, Development, Target 1, Target, 0.003" 347 SS Sheet for T1/T2 Targets Received 347SS_Mill_Spec_Test_Report_-_July_8_2015.pdf
 A 5lb roll of 347SS sheet was received today.  This alloy is to be used for the target windows of the new T1 and T2 beryllium target cassettes
that will be manufactured in the near future.  The material was ordered from Alloys International (PO# TR206407).  A mill spec report was included
with the material, a scanned copy is attached in PDF format.  The roll will be stored in the meson hall RH hot cell lab office on the shelving above
Entry  Tuesday, June 23, 2015, 10:24, Isaac Earle, Standard Operation, Other, Other, BL1A Holding Tank Water Released 
 The water in the BL1A holding tank was released to the city sewer.  This water was sampled, tested, and approved for release by RPG two weeks
ago.  The total volume was 510L, a combination of water from the T2 and TNF systems.  The total time required to pump out the water with all
valves fully open was 1hr2m.  Paperwork for the water release was completed and returned to RPG.
Entry  Friday, June 19, 2015, 17:11, Isaac Earle, Development, Other, Controls, PLC Test of Ultrasonic Level Sensor Overnight_Level_Sensor_PLC_Test.jpg
The new T1/T2 level sensors (Omega LVCN414) were hooked up to the PLC and the test performed
on June 11 was repeated.
 The water level above the base of the bucket was measured using a tape measure, as well
Entry  Thursday, June 11, 2015, 16:59, Isaac Earle, Development, Other, Controls, Lab Test of New T1/T2 Level Sensors 
The new T1/T2 level sensors (Omega LVCN414) were tested in the RH HC lab today using the Omega software on a laptop and positioning the level sensor
flange above a bucket of water with similar height as the expansion tank.
The level sensors behaved as expected with varying water level.
Entry  Monday, May 25, 2015, 12:48, Isaac Earle, Repair, Target 1, Controls, T1/T2 Controls System Crash 
At 9:15am this morning BL1A tripped off due to loss of the watchdog signals for the T1/T2 control system.  Graham Waters investigated and the
problem was found to be a corrupted initialization file.  The error was corrected, and BL1A was started by 11:30am.
 
Entry  Tuesday, May 12, 2015, 21:20, Grant Minor, Standard Operation, Target 1, Target, T1 & T2 Targets moved from pos. 0 to pos. 4 
Grant moved the T1 and T2 targets from position 0 to position 4 this evening at around 9pm.
The position 4 selector button on the T1 rack was not working.  The manual control box had to be used with the adapter cable and military
connectors for both T1 and T2 to achieve position 4 on both targets.
Entry  Friday, May 08, 2015, 09:48, Isaac Earle, Standard Operation, Other, Other, BL1A Blocks Restored 1A_Shield_Blocks_Restored_for_1A_beam_2015_&_2014.pdf
Replacement of the BL1A blocks was completed yesterday (May 8, 2015) in preparation for first beam down 1A on May 12th.  The attached PDF shows
a photograph of the current arrangement, and also the block arrangement at the beginning of the 2014 running period for comparison.
Entry  Friday, May 01, 2015, 16:01, Isaac Earle, Repair, Target 1, Other, RH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak Check IMG_1510.JPGIMG_1511.JPGIMG_1512.JPG
The Meson Hall RH Lab Warm Cell was used by Beamlines Group for hydrostatic testing of the TNF heat exchanger.  The location was chosen because
of access to a water supply, active drain, and the heat exchanger has removable contamination.  The work took place on April 30th and May 1, 2015.
 New plastic sheet was placed over the 6 foot block in the center of the warm cell which was used as a work area.  The plastic was removed after
Entry  Tuesday, April 28, 2015, 15:55, Isaac Earle, Development, Target 1, Target, Target Version Jumper Wires Installed for T1-MK1 and T2-MK1 
 The T1-MK1 and T2-MK1 targets have been re-wired to allow version identification.  Work was performed in the target storage pit.  Approximate
field around the targets in the pit was 100microSv/hr.  Disposable coveralls were worn for the job and had 800cpm of contamination on completion.
 All nylon cable ties on the targets were replaced with PEEK cable ties.  Total dose received was 0.06mSv by Isaac Earle.  This modification
Entry  Friday, April 24, 2015, 11:53, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target Info Sheet & Elevations T2-MK2_-_2015_Elevations.pdf
T2-MK2 target information sheet, beam spot measurements, and elevations were updated and delivered to Operations. PDF copy attached.
No work was done to T1-MK2 (placed in storage pit for 2015 shutdown duration to lower fields), so the sheets will not be updated.
Entry  Thursday, April 23, 2015, 16:29, Isaac Earle, Standard Operation, Target 1, Target, T1 & T2 Profile and Protect Monitors Electrical Check Completed 
An electrical check has been completed for the T1 & T2 Profile and Protect Monitors by Dave Cameron and Mike Russell.  They report that all
results look normal.
Entry  Thursday, April 23, 2015, 13:40, Isaac Earle, Development, Target 2, Other, T2 Protect Monitor Elevation Adjustment Old_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Entry_Side.jpgOld_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Exit_Side.jpg
- T2 Protect Monitor moved from the beam line to the hot cell on Monday April 20th
- Elevation of the plate center measured at 1839.0mm from the base of the vacuum flange
- Old monitor cassette photographed (attached).  Heat mark noticed on exit side approximately 10mm above and 5mm south of plate centers (cause
Entry  Wednesday, April 22, 2015, 15:17, Isaac Earle, Development, Target 1, Target, T1-MK2 wired for version identification 
 The T1-MK2 target was wired for automatic target version detection by the new PLC control system (A to C jumper  in POT/CAM MS connector).
 T1-MK1 and T2-MK1 targets still need to be wired which can take place after the shutdown without moving them from the storage pit.
Entry  Wednesday, April 22, 2015, 15:15, Isaac Earle, Standard Operation, Target 1, Cooling, T1 and T2 Cooling Packages Ready 
Both cooling packages are running steadily with the targets in Position 0.  
The demin flow (Q2) for both was tuned to approximately 1.5USgpm.  
A defeat was applied to T2Q1 flow to prevent high level nuisance trips.  This will remain in effect for the 2015 running period.
Entry  Wednesday, April 22, 2015, 09:46, Isaac Earle, Development, Target 1, Target, Water Sensors Installed on T1 Monolith T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG
 Four water sensors have been installed on top of the T1 monolith.  These water sensors were wired and brought to the area during the 2014
shutdown, but installation was delayed so that the top of the monolith could be painted first.  The sensor labels (attached to the sensor cable) are:
T1, T2, T6, and T8.  The location of each sensor is documented on the diagram below.  Two photos of the top of the monolith are also attached.
Entry  Tuesday, April 21, 2015, 13:38, Isaac Earle, Standard Operation, Target 1, Target, Air Amplifier Started. T1 & T2 Profile Monitor Actuation Checked 
 The lower air amplifier has been started, and air supplied to the T1 and T2 areas by opening the appropriate ball valves beneath the amplifier.
 The amplifier is cycling normally and the barrels are cool to the touch (indicating no significant air leaks).
Actuation of both profile monitors was checked from the control room.  Both reach the in and out limits as expected, with no change in vacuum
Entry  Tuesday, April 21, 2015, 12:59, Isaac Earle, Standard Operation, Target 1, Target, T1-MK2 target moved from storage pit to beam line 
 The T1-MK2 target was transported from the storage pit to the beamline.  The target measured approximately 10mSv/hr at 0.5m.  All target
services were hooked up and the cooling package was started (no change in T1 vacuum).
Entry  Monday, April 20, 2015, 11:42, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Target & T2 Protect Moved 
 The T2-MK2 target was moved from the hot cell to the beam line. The T2 Protect Monitor was moved from the beam line to the hot cell.  The
T2-MK2 assembly measured 136mSv/hr at 0.5m, and the protect monitor was 8mSv/hr.  Total dose incurred by Isaac Earle:  0.18mSv.  No dose
to other workers
Entry  Thursday, April 09, 2015, 13:56, Isaac Earle, Development, Target 2, Target, T2-MK2 target wired for version identification, cable ties replaced, ready for use 
The "POT/CAM" MS connector on the T2-MK2 has been wired to allow automatic target version number identification by the new T1/T2 control system.
 Pin A was jumpered to Pin C.  (MK1 targets will use Pin A to Pin B jumper).
The nylon cable ties on the target assembly were found to be very brittle and fragile, they have been replaced with PEEK cable ties.
Entry  Tuesday, March 31, 2015, 17:40, Isaac Earle, Repair, Target 2, Cooling, T2 Thermistors Replaced 
The Inlet (T1), Outlet (T2), Col.A (T6), and Col. B (T7) thermistors at the T2 cooling package all gave intermittent faulty readings at various times
between Oct - Dec 2014.  It is suspected that this was caused by a water leak in the area causing the terminals to get wet.  Inspection of the
sensors revealed that they are in poor shape and that the readouts sometimes fluctuate when the probe or connectors are handled.  All four thermistor
Entry  Thursday, March 12, 2015, 10:51, Isaac Earle, Standard Operation, Target 2, Target, T2-MK2 Pos'n 4 Elevation Measurements 
Elevation measurements of the T2-MK2 target were taken in the hot cell to confirm previous records in preparation for the T2 Protect Monitor adjustment
that will take place later this shutdown.  Potentiometer readings were also checked for ladder position 2mm above and below nominal in case we decide
to run the target in an offset position again.
Entry  Wednesday, March 04, 2015, 18:08, Isaac Earle, Repair, Target 2, Cooling, T2 Cooling Package MRO Update 
The following work was done today at the T2 cooling package:
- Remainder of #4 Hansen o-rings replaced  (see E-log from Jan 30, 2015)
- Installed the following ball valves which have been rebuilt & tested with 100psi air: target outlet 3/4" (x2), resin can outlet filter
Entry  Friday, February 27, 2015, 18:06, Isaac Earle, Development, Target 1, Target, T1 Rotary Collimator Water and Air Line Investigation 
 Ron Kuramoto, Keith Ng, John McKinnon, and myself spent some time today investigating water and air lines related to the T1 Rotary Collimator (Col.
A).  We discovered the following:
- There is a panel on the back (south) side of the T1 cooling package with 3 air lines for Col. A actuation, Col A cooling water supply & return,
Entry  Friday, February 20, 2015, 13:55, Isaac Earle, Standard Operation, Target 2, Target, T1 & T2 Target Moves 
- The T1-MK1 target was moved from the hot cell to storage pit hole #3 (ready as T1 spare)
- The T2-MK2 target was moved from the beam line to the hot cell for inspection and in preparation for T2/M9 work this shutdown
- The target measured up to 90mSv/hr at approximately 1m while being lifted
Entry  Wednesday, February 18, 2015, 14:49, Isaac Earle, Repair, Target 1, Target, T1-MK1 Repair Complete IMG_4638.JPGIMG_4646.JPGIMG_4647.JPG
This is a continuation of work detailed in E-Log #129 and #140.
- Static water test performed on the target cooling lines:
     - Test setup assembled and leak checked by pressurising with house air, submerging in water and checking for bubbles (see photos)
Entry  Friday, February 06, 2015, 12:39, Isaac Earle, Repair, Target 1, Target, T1-MK1 Repair Status (Pos'n 1 Plug Leak) IMG_4603.JPG
 The T1-MK1 target is currently in the hot cell for repair of a leak at position 1.  See E-Log #129 for details on previous work.
- Pos'n 1 right nut removed (a little stiff, but no excessive force required)
- Exterior threads cleaned w/ Scotchbrite disc on Dremel tool
Entry  Monday, February 02, 2015, 16:06, Isaac Earle, Maintenance, Target 2, Cooling, T2 MRO Status 
- T2-MK2 target (currently in the T2 monolith) purged with air

- All cooling package reservoir o-rings changed
Entry  Tuesday, January 27, 2015, 17:38, Isaac Earle, Repair, Target 1, Cooling, T1 Cooling Package 3/4" Valves Rebuilt - T1 MRO Complete 
- Both 3/4" ball valves on the T1 cooling package target water circuit were rebuilt, leak tested with house air pressure, and reinstalled
- The 3/4" ball valve on the T1 heat exchanger secondary side was replaced with a new unit
- The 3/4" needle valve on the T1 heat exchanger secondary side was rebuilt, leak tested with house air pressure, and reinstalled
Entry  Friday, January 23, 2015, 13:28, Isaac Earle, Repair, Target 2, Cooling, T2 Cooling Package Thermistor Defeats 
Both defeats applied to T2 cooling package thermistors were removed today (Col. B interlock was jumpered, and the target water inlet and outlet signals
had been swapped).  It was confirmed that all thermistors are now wired correctly.  The readback of both target water thermistors is currently
unstable.  Inspection of the Lemo connectors showed that the internal plastic parts of all connectors were damaged or missing.  If the T1/T2
Entry  Wednesday, January 14, 2015, 15:06, Isaac Earle, Standard Operation, Target 1, Other, Active Item Stored in East Hot Cell 
The active item discovered on January 9, 2015 outside the BL1A bootbox has been moved to the Meson Hall east hot cell for storage.  The item was
analyzed by RPG and the radiation was found to be coming from activated metal contained by dried paint in the bottom of a plastic container.  The
solidified paint puck was removed from the container which is not active.  The item is approximately 20microSv/hr at 0.5m, and 1.3mSv/hr on contact.
Entry  Wednesday, January 14, 2015, 13:32, Isaac Earle, Standard Operation, Target 1, Target, T1-MK2 Moved from B/L to Storage Pit 
The T1-MK2 target was transferred from the beam line to the storage pit in hole #5 using the transfer flask.  A maximum field of 7.2mSv/hr was measured
at 0.5 meters from the target.  A video was taken while the target was lifted from the monolith and can be found on Isaac's PC (too large to upload).
The blocks to the west and east side of the T1 monolith (level with the monolith) were swiped by Danka Krsmanovic and no contamination was found.
Entry  Monday, January 12, 2015, 16:35, Isaac Earle, Standard Operation, Target 1, Cooling, T1 & T2 MRO Status 
The following tasks have been performed at T1:
- T1 monolith painted using grey two part epoxy paint
- Video inspection taken while package running. Small leak from both valves on H.E. secondary side (video on Isaac's PC, too large to upload)
Entry  Wednesday, January 07, 2015, 17:27, Isaac Earle, Repair, Target 2, Water Leak, Water Leaks at T2 Cooling Package 
The T2 cooling package was visually inspected today after blocks were removed.  With the cooling package off the following leaks were observed:
- Collimator A return line ball valve: ~ 2 drops / second
- Collimator B return line ball valve: ~ 1 drop / 3 seconds
Entry  Monday, January 05, 2015, 15:08, Isaac Earle, Standard Operation, Target 2, Water Leak, Cooling Packages Re-Started; Suspect External Water Leak at T2 Package 
Pumping was restored to 1A today by Vacuum Group and the beam line returned to normal vacuum levels.  Both cooling packages were started with no
change in vacuum (no water leaks inside the vacuum volume).  The T2 package was left on for approximately 1 minute, and then the expansion tank level
was checked.  Approximately 1cm of water was lost.  The T2 package was turned off, and will remain off until the package can be inspected later
Entry  Monday, December 22, 2014, 14:31, Isaac Earle, Maintenance, Target 2, Water Leak, Drop in T2 water level 
This morning at 5:30am the T2 cooling package expansion tank switched to WARNING LEVEL NOT OK.  There was no change in BL1A vacuum at this time.
 The change in level was confirmed by inspecting the water level visually.  Operators suggested it may have happened because the cyclotron was
shut off and the temperature of all water systems dropped, however T1 did not experience a noticeable change in level, so I do not think this is the cause.
Entry  Friday, December 19, 2014, 14:35, Isaac Earle, Standard Operation, Target 2, Other, Amplified Air Shut Off 
The BL1A amplified air system has been shut off, and will remain off until required for BL1A start-up in Spring 2015 (the lower of the two units was
in use, with the upper unit on standby as a spare).
Entry  Tuesday, December 09, 2014, 14:45, Isaac Earle, Repair, Target 1, Target, T1-MK1 Repair Status (Pos'n 1 Plug Leak) 
 Between Nov 14 ~ Dec 9 the following activities took place:
- The leaky 10mm Be target at pos'n 3 was removed and plugged
- The loose protect monitor electrical conduit was secured in place using an aluminum shim
Entry  Tuesday, November 18, 2014, 10:52, Isaac Earle, Standard Operation, Target 1, Active Sump, RH Hot Cell Lab Active Sump Released 
Release of the Remote Handling Hot Cell Lab active sump water was completed today by
Hua Yang.  During the procedure fields of up to 0.50 micro Sv/hr were measured around the newly installed filter housing.  After completion the filter was removed and replaced.  The filter measured 450cpm on the
Entry  Monday, November 17, 2014, 10:25, Isaac Earle, Repair, Target 1, Other, Amplified Air Leak In T1 Area Repaired IMG_4263.JPG
While the 1A blocks over the T1 area were removed last week the opportunity was used to investigate an air leak on the amplified air system discovered
on August 11, 2014.
The leak was found to be coming from a device related to the septum polarity switch located behind (south of) the septum power supply on the 1A
Entry  Monday, November 17, 2014, 10:14, Isaac Earle, Development, Target 1, Active Sump, Filter Installed Downstream of RH HC Lab Active Sump IMG_4273.JPG
A filter housing and filter were installed by Dan McDonald on November 14 in the piping section between the Remote Handling Hot Cell Lab active sump
and the city sewer drain as shown in the attached picture.  The purpose of the new filter is to prevent pieces of active material from being released
to the drain when the sump is pumped out.  If small pieces of active material enter the sump they may sink to the bottom, and not be captured in a
Entry  Friday, November 14, 2014, 17:30, Isaac Earle, Repair, Target 1, Target, T1-MK1 Target Failure / T1 Target Swap T1MK2_Nov_14_2014.pdf
 - On Nov 13 at ~1am the BL1A vacuum went bad.  The T1 and T2 volumes were isolated and pumped
on separately, the results indicated a water leak from the T1 target.  The level of the expansion tank was slightly below normal at this time, but
not enough to be conclusive.  The leak was confirmed at ~9am by starting the T1 cooling package which caused a dramatic vacuum spike.  Approximately
Entry  Thursday, November 06, 2014, 17:22, Ron Kuramoto, Repair, Target 2, Cooling, 1AT2, faulty Thermister water out temperture 


    
        
            
            Summary: 
Entry  Thursday, November 06, 2014, 17:18, Ron Kuramoto, Repair, Target 2, Cooling, 1AT2 Collimator B, faulty Thermister water out temperature  
On 14Oct2014, the 1AT2 Collimator B water outlet temperature rose to 100o C. 
Troubleshooting the T2 Collimator B water out temperature (T7) by swapping it's analog
signal in PIE box #2 with T2 Collimator A water out temperature (T6) to see if problem follows. See if unplugging T7 signal causes Safety Page SV7 1A Collimators
Entry  Thursday, October 16, 2014, 17:44, Ron Kuramoto, Repair, Target 2, Water Leak, 1A Tunnel T2 Cu-ALCW water leak repair 6x
 
On Oct 7th,
during the Mini Shutdown, the T2 cooling package was uncovered to investigate the Cu-ALCW water leak dripping into the 1A Tunnel. 
Entry  Thursday, September 11, 2014, 15:36, Ron Kuramoto, Repair, Target 2, Water Leak, 1A Tunnel T2 Cu-ALCW water leak IMG_1007sm.JPGIMG_1009sm.JPG
On Sep. 3rd during the 6 hr maintenance day, Doug Preddy
& I went into the 1A tunnel under “controlled access” to investigate a water leak that triggered the Water Detection Sensors.  It was also noticed that the Cu-ALCW tank level was losing water.
Entry  Wednesday, August 13, 2014, 16:34, Isaac Earle, Repair, Target 1, Other, Amplified Air Leak Narrowed Down to T1 Area 
 During the maintenance day today, amplified air to the T1 area was valved off in an attempt to pin point the location of the air leak.  The
air amplifier cycle rate returned to normal with the T1 line valved off, indicating the leak is somewhere on the T1 profile monitor air cylinders, the
T1 septum polarity switch, or on the supply lines to these devices.  Because these devices will not be used in the near future, the line will be left
Entry  Monday, August 11, 2014, 16:57, Isaac Earle, Repair, Target 2, Other, Air Amplifier Increased Cycle Rate 
On Friday August 8th Ron Kuramoto observed that the Meson Hall air amplifier cycle speed had increased.  Cycle time measurements were taken on Monday
August 11th.  The lower amplifier was found to be cycling 17 times per minute, and the upper air amplifier 16 times per minute (approximately 4s cycle
period).  The cycle period for both amplifiers was measured in June 2012 and found to be approximately 25s.  Note that a cycle is defined as
Entry  Wednesday, July 02, 2014, 16:56, Isaac Earle, Repair, Target 1, Cooling, T1-P2 and T2-P1 pressure transducers replaced. 
The T1-P2 (outlet) pressure transducer was replaced to address an erroneous signal.  The XTPAGE value now reads as expected.
The T2-P1 (inlet) transducer was also replaced to address a noisy (and worsening) signal.  Replacing the transducer seems to have had no effect
on the XTPAGE values.  A possible controls issue is suspected and Jamie Cessford will be notified so that the matter is directed to the appropriate
Entry  Tuesday, June 03, 2014, 22:56, Isaac Earle, Standard Operation, Target 2, Target, T2 Target Position Moves (Development Shift) 
The T2 target was moved from Position 4 to Position 0 at 11:15am so the profile monitor could be used during the development shift.
The T2 cooling package tripped regularly throughout the day on high flow while in position 0.
At 10:45pm the T2 target was returned to the previous running position: approximately 2mm above the nominal position 4 elevation (pot ratio fluctuating
Entry  Wednesday, May 14, 2014, 20:36, Grant Minor, Development, Target 2, Target, Target exercised to position 0, then back to 2.0 mm above position 4 
The T2 target was exercised to position 0 around 6:15pm so that the T2 profile monitor could be used by operations.  The T2 water package was re-enabled
when the target was in position 0, however this resulted in some trips of the cooling package.
Operations called around 7:45 to request return of the target to about 2mm above position 4.
Entry  Monday, May 05, 2014, 15:46, Isaac Earle, Repair, Target 2, Target, T2 Protect Returned to B/L 
The T2 protect monitor was returned to the beam line using the shielded flask.  The alignment pin did not align with the hole in the vacuum flange,
but could be aligned by hand by rotating the monitor assembly while it was hanging from the flange.  The protect monitor vacuum flange was bolted
down and all services connected.  The T2 protect and profile monitors were checked by Dave Cameron (both OK).  Vacuum was pumped down and the
Entry  Friday, May 02, 2014, 15:49, Isaac Earle, Repair, Target 2, Target, T2 Protect Monitor Elevation Correction RHB_6851.JPGRHB_6850.JPG
When beam was started in mid-April, it was observed by Operations Group that with the beam centered vertically within the protect monitor, the profile
monitor showed the beam spot to be approximately 6mm high.  The protect monitor was changed during the shut-down due to a failure in November 2013,
so it was suspected that the new protect monitor was not aligned properly.  The beam spot appeared to be dangerously close to the top weld of the
Entry  Monday, April 14, 2014, 15:30, Isaac Earle, Standard Operation, Target 2, Target, T2 Target Moved to Position 4 
The T2-MK2 target (currently installed in the beamline) was moved from position 0 to position 4 (10cm Be) using the portable control box.
The T2 cooling package was started after moving the ladder.
There was no change in the BL1A vacuum.  The T2 expansion tank water level dropped slightly, as expected (around 1/16"), and was refilled
Entry  Thursday, April 03, 2014, 16:35, Isaac Earle, Standard Operation, Target 1, Cooling, T1 Cooling Package Started 
 The T1 cooling package was started around 2pm today.  There was no change to the T1 volume vacuum during startup.
The package was inspected for water leaks: None found.
The demin loop flow (Q2) was adjusted to ~1.5gpm.
Entry  Thursday, April 03, 2014, 13:43, Isaac Earle, Standard Operation, Target 2, Target, T2 Profile Monitor OK 
T2 Profile Monitor actuation was tested today from the control room and all is working properly.  The position (IN / OUT) also displays correctly.
To my knowledge nobody has looked at this system, so it is a mystery why it suddenly started working.  This e-log will be updated if any explanation
is found.
Entry  Thursday, April 03, 2014, 10:19, Isaac Earle, Standard Operation, Target 2, Cooling, T2 Cooling Package Resin Can Replaced T2_Conductivity.jpg
The resin can was removed from the T2 cooling package and transported to the warm cell.  A replacement can with fresh resin was then installed.
A 12' sling and the standard four bridle was used to prevent the crane hook block from hitting the mezzanine railing on the south side.
The T2 package was started and inspected for leaks - none found.
Entry  Tuesday, April 01, 2014, 10:17, Isaac Earle, Repair, Target 2, Target, T2 Profile Monitor Actuation - Fault Report 
The T2 profile monitor cannot be actuated from the control room.  When the solenoid valve that supplies air to the air cylinders is powered directly,
the monitor moves in normally, therefore a controls issues is suspected.
Additionally the monitor position shows neither IN nor OUT.  This does not change when the monitor is at either limit.  Proper actuation
Entry  Friday, March 28, 2014, 13:59, Isaac Earle, Maintenance, Target 2, Cooling, T2 P1 Transducer and T2 Q1 Flow Meter Replaced 
The T2 P1 pressure transducer (Omega PX315-100GI) and T2 Q1 Proteus flow meter (0150SSTF3) have been replaced with new units to address issues with noisy
signals.
Entry  Tuesday, March 25, 2014, 18:24, Isaac Earle, Development, Target 2, Water Leak, Water Detecting Sensor Install at T1 & T2 9x
Water detecting strips were installed around the T1 and T2 areas today with Doug Preddy and contractors from SMT Research.  Four sensors were installed
at various locations on each cooling package.  Four sensors were installed on the top surface of the T2 monolith.  In addition, four sensors
were routed for future installation at the T1 monolith (it is currently covered by blocks and requires cleaning and painting before sensor installation).
Entry  Monday, March 24, 2014, 18:14, Isaac Earle, Standard Operation, Target 2, Cooling, T2 Cooling Package & Air Amplifier Started 
Bill Rawnsley completed an electrical check of the T2 profile monitor today from the Meson Hall mezzanine - All OK.  
The T2 cooling package was refilled and started.  There was no change to the T2 vacuum when starting the package.  While running, the
package was visually inspected for water leaks - no leaks found.  
Entry  Tuesday, March 11, 2014, 13:50, Isaac Earle, Repair, Target 2, Target, T2 Protect Monitor Returned to Beam Line 
After the monitor assembly was moved to the hot cell, electrical checks were performed by Bill Rawnsley which showed the same results as when tested
in the beam line.  A new monitor was installed (supplied by Probes Group), the tests were repeated, with all results appearing normal.  The monitor
assembly was transported to the beam line this morning and installed at the T2 monolith.  All cables were attached and the flange was bolted down.
Entry  Monday, March 03, 2014, 11:55, Isaac Earle, Repair, Target 2, Target, T2 Protect Monitor Moved to HC IMG_1934.JPGIMG_1939.JPGIMG_1973.JPG
 The T2 Protect Monitor was transported from the beam line to the hot cell this morning using the transport flask.  The move went smoothly.
 The only difficulty was locating the yellow flask alignment frame to the T2 monolith as the T2 protect holes on the yellow frame are tighter than
for other devices.  It was necessary to remove four screws that secure the top flange of the T2 protect monitor assembly to the flange on the monolith.
Entry  Thursday, February 13, 2014, 14:27, Isaac Earle, Standard Operation, Target 2, Target, T2 Target Moves 
The T2-MK1 target was moved from the beam line to the target storage pit in position 4.  The target was measured to be 30mSv/hr at 0.5m.  The
move went smoothly.
The T2-MK2 target was then moved from the hot cell to the beam line.  The target was 151mSv/hr at 0.5m.  For reasons unknown the target
Entry  Thursday, February 06, 2014, 17:05, Isaac Earle, Standard Operation, Target 1, Cooling, T1 & T2 Cooling Package Filters Changed 
Water was drained from the T1 and T2 cooling packages, samples taken, and delivered to RPG.
All filters on the T1 and T2 cooling packages were changed except for the T1 demin. line filter which is hard to access and could not be properly
drained.  This filter will be changed next shutdown when the area is more accessible while the resin cans are being changed.
Entry  Wednesday, January 22, 2014, 15:41, Isaac Earle, Standard Operation, Target 2, Water Leak, Water Drained From Suck Tube Released 
 After approval from RPG, the water drained from the suck tube, which was stored in a bucket in the RH lab active sink area, was released to the
active drain.  Even after rinsing, the bucket still had a slight field from the base, so it has been labelled and will be kept in the active sink
area.
Entry  Monday, January 20, 2014, 11:51, Isaac Earle, Repair, Target 2, Water Leak, Water Leak from Meson Hall Mezzanine Near T2 
 A water leak developed this morning from a city water supply line at a hose connection near the T2 expansion tank.  Water was observed to
be dripping off the mezzanine onto the plastic sheet covering the T2 cooling package.  The leak has been stopped and the leaky fitting is being repaired
by Carston Frasden.
Entry  Friday, January 17, 2014, 15:41, Isaac Earle, Standard Operation, Target 1, Target, Water Purged from T1 & T2 Targets 
Water was purged from the T1 and T2 targets using compressed air.  The water is stored in a labeled bucket on the BL1A blocks near the T2 cooling
package.  The bucket is approximately 100µSv/hr on contact and 10µSv/hr at 0.5m.  Isaac's coveralls had 500cpm on them after this job and were dropped off at active
Entry  Friday, January 17, 2014, 10:10, Isaac Earle, Standard Operation, Target 1, Cooling, T1/T2 Cooling Packages & Air Amplifier Shut Off 
 In preparation for Edi to vent the BL1A vacuum volume, the T1 and T2 cooling packages were both shut off.  They will remain off until vacuum
is restored in BL1A in a few weeks time.  This afternoon, water will be purged from the T1 and T2 targets using compressed air so that stagnant water
is not sitting in the targets for an extended period of time.
Entry  Wednesday, January 15, 2014, 15:38, Isaac Earle, Standard Operation, Target 2, Water Leak, Suck Tube Drained and Rinsed IMG_1276.JPGIMG_1291.JPGIMG_1295.JPGIMG_1296.JPGIMG_1297.JPG
The suck tube vessel was drained, rinsed, and transported to the active sink area in the Meson Hall Hot Cell Lab.  There are no longer high fields
from the suck tube and it is ready for future use.  The filter, tubing, and flange used for filtering the active water were removed and bagged and
are currently stored in the south-east corner of the warm cell.  This bag measured up to 12mSv/hr on contact.  There are small black particles
Entry  Thursday, January 09, 2014, 15:21, Isaac Earle, Repair, Target 2, Target, T2-MK2 Electrical Check 
 An electrical check was performed on the T2-MK2 profile monitor by Bill Rawnsley.  All signals produced the expected response, and Bill approved
the monitor for use.  Bill has saved screenshots of the signal profile.
The target ladder position micro-switches and profile monitor in/out limit switches were also tested: all OK.
Entry  Monday, January 06, 2014, 15:55, Isaac Earle, Repair, Target 2, Target, T2-MK2 Repair DSC_6622.JPGDSC_6623.JPGDSC_6626.JPGIMG_1809.JPG
 The leaking 10cm Be target was removed from position 3 on the T2-MK2 target ladder and the water ports were blanked-off with 3/8" Swagelok
plugs.  A 10cm Be target remains in position 4.  The target was pumped down using the cold trap and a helium leak check was performed.  All
target locations on the ladder were found to be leak tight.  The delta seal locations and fittings above the vacuum flange were also leak tight, however
Entry  Tuesday, November 26, 2013, 10:33, Isaac Earle, Repair, Target 2, Target, T2-MK2 Water Flush 
 The T2-MK2 target in the hot cell was flushed with water and then purged with air so that stagnant water is not left sitting in the target.  Replacement
of the failed 10cm Be cassette will take place in January 2014.
Entry  Saturday, November 23, 2013, 18:37, Isaac Earle, Repair, Target 2, Target, T2-MK1 Installation 
- T2-MK1 target transported from the storage area by Isaac and Grant and installed at the T2 monolith.  All services were connected.  Storage
pit covered.
- Edi began pumping approximately 10am, and was not able to pump below ~20 Torr.  Dimo came in to assist.
Entry  Friday, November 22, 2013, 20:26, Grant Minor, Repair, Target 2, Water Leak, T2 Water Leak - Target Assembly Removed and Water Sucked Out of B/L T2_tgt_water_leak_22Nov2013-006-before-suck.JPGT2_tgt_water_leak_22Nov2013-013-after-suck.JPGT2_tgt_water_leak_22Nov2013-016.JPGT2_tgt_water_leak_22Nov2013-017.JPG
T2 target water leak was identified earlier this morning.
Isaac Earle, Ron Kuramoto and Keith Ng co-ordinated Meson Hall blocks removal and target flask transport.
Target assembly was removed from B/L approximately 5pm.
Entry  Tuesday, November 12, 2013, 11:49, Isaac Earle, Repair, Target 1, Target, MH Hot Cell Lab Manipulator Overhaul 
 Complete overhaul of all manipulators in the Remote Handling Hot Cell Lab in the Meson Hall was performed by Peter Dudley from Central Research
Laboratories between October 28 - November 8th.  Overhaul included replacing all tapes and cables, disassembling, cleaning, lubricating, and rebuilding
the master and slave wrist assemblies, adjusting motion locks, and other repairs/maintenance as required.  All 6 manipulator arms in the lab are now
Entry  Wednesday, October 23, 2013, 15:30, Isaac Earle, Development, Target 1, Cooling, T1 & T2 High Temp Safety Switch Tested 
 An end-to-end test was performed on the new T1 and T2 high temperature safety switches yesterday during the maintenance day.  The switch set
points were lowered below the current temperature and it was confirmed that all warning messages and XTPAGE status changes occurred as expected.
Entry  Wednesday, September 25, 2013, 14:05, Isaac Earle, Standard Operation, Target 1, Active Sump, RH Lab Active Sump Level Sensor Inspected 
A notification was received that the RH lab active sump level sensor is due for annual inspection.  The sensor was tested and is working properly.
The water level was observed to be only a few inches below the sensor level.  Ken Buckley was notified and someone from his group will sample
and drain the tank according to the procedure in Document-64834
Entry  Wednesday, September 11, 2013, 16:13, Isaac Earle, Repair, Target 2, Cooling, T2 Cooling Package Water Leak Repair 
 The T2 cooling package was uncovered this morning and a leak was found coming from the Swagelok ball valve on the 3/4" target water outlet
line.  The water was coming from the stem of the valve, indicating that water was leaking through the valve packing, rather than at the fittings for
the valve.  The leak rate was approximately 1 drop every 5 seconds and a small puddle was visible on the top of the water reservoir.  The water
Entry  Monday, September 09, 2013, 16:22, Isaac Earle, Repair, Target 1, Cooling, T1 P1 Transducer Replaced 
 The BL1A tunnel was accessed today to assess a faulty reading from the T1 cooling package inlet pressure transducer (T1P1).  The line was
first bled to remove gas bubbles which did not change the reading.  The transducer was replaced with a new unit (OMEGA PX315-100GI).  The pressure
reading returned to the usual value of approximately 74psi (faulty reading had been steadily decreasing over the last few months and was at approximately
Entry  Monday, September 09, 2013, 16:13, Isaac Earle, Repair, Target 2, Cooling, Drop in T2 Cooling Package Water Level 
 On September 9th in the morning Ron Kuramoto noticed that the T2 cooling package expansion tank level was reading NOT OK for the warning level.
 Looking at XSTRIP showed that the warning level tripped at approximately 1:50am on September 8th.  The tank was refilled at 4pm on September
9th to the usual level (1/2" above the nut on the trip level float).  The expansion tank level will be checked tomorrow and periodically throughout
Entry  Friday, August 23, 2013, 10:39, Isaac Earle, Repair, Target 1, Cooling, T1 Cooling Package Inlet Pressure (P1) Sensor T1_P1_plot_(may-aug).jpgT1_P1_plot.jpg
 The T1 cooling package inlet pressure (P1) has been dropping since approximately May 5, 2013 from the regular operating pressure of approximately
75psi to the present value of 47psi.  An increase in the rate of decrease started around August 5th as well as increased noise in the signal.  Plots
attached below.  No corresponding change in the outlet pressure, and no change in the water flow rate (also no change in inlet and oulet temperatures)
Entry  Tuesday, June 04, 2013, 13:42, Isaac Earle, Repair, Target 1, Target, T1 and T2 Power Supply Fans Replaced 
 Replacement of the power supply fans for the T1 Power Supply, T2 Power Supply, as well as an additional power supply in rack 1A was completed this
morning.  The boxes were blown out with air to remove dirt and dust.  The inside of all boxes were inspected and no evidence of melting or burning
was found. 
Entry  Friday, May 31, 2013, 16:07, Isaac Earle, Repair, Target 1, Target, Power Supply Fan Failure IMG_1440.JPGIMG_1441.JPGIMG_1442.JPG
 Today (May 31, 2013) I was contacted regarding a burning smell and high temperatures around the T1/T2 controls racks.  Erwin Klassen, Bill
Rawnsley, Graham Waters and myself investigated and found that the cooling fans for two power supplies on the T1/T2 control racks had failed and both units
were warm to the touch.  The power supplies are labeled "T1 Power Supply" and "T2 Power Supply" in racks 1-F and 1-A respectively.
Entry  Tuesday, May 14, 2013, 13:26, Isaac Earle, Development, Target 1, Target, T1 & T2 Profile Scan 
The T1 and T2 profile monitors were used during today's development shift.  Target ladder movement for T1 was done at the panel on the mezzanine,
for T2 the portable control box was used.  Both monitors actuated properly and the scans did not show any "missing" wires.  The profiles
at both targets were found to be too broad and were adjusted to span 2 wires horizontally and 6-7 wires vertically (Yi-Nong Rao).
Entry  Friday, April 19, 2013, 09:55, Isaac Earle, Development, Target 1, Cooling, T1&T2 cooling package safety/standards compliance upgrade complete (SASP0120) 
Yesterday (April 18th) the T1 and T2 cooling package PRV outlet lines were routed to the active drain in the 1A tunnel.  All items for the safety
and standards compliance upgrade for T1 and T2 as specified in Document-68861 are
now complete.
Entry  Wednesday, April 17, 2013, 16:45, Isaac Earle, Standard Operation, Target 1, Target, T1-MK1 Target Leak Checked 
 The T1-MK1 target was leak checked on April 15th at the T1 monolith by Ron Kuramoto and Edi Dalla Valle.  No leaks were found.
Entry  Wednesday, April 17, 2013, 16:43, Isaac Earle, Standard Operation, Target 2, Target, T2 target installed; Vacuum leak-tight; Monitors OK; T2 ready for beam 
The T2-MK2 target was transferred from the storage pit to the beam line yesterday (April 16th).  The field was measured to be approximately 165mSv/hr
at 0.5m from the target ladder (after approximately 5 months of cool down time).  Vacuum was started this morning and has pumped down normally (1ACG4
at 11mTorr after ~5 hours) indicating that the target is leak tight.  
Entry  Friday, April 12, 2013, 17:33, Isaac Earle, Development, Target 1, Cooling, T1 & T2 high-temp limit switch installation, wiring, and commissioning complete 
Installation, wiring, and commissioning of the high temperature limit switches for the T1 and T2 cooling packages was completed today as part of SAS
project SASP0120.  The relay output from the switches was wired in series with the Central Safety System signals for T1 and T2 (cable number 13250
and 12250 respectively) in break-out panel #2 on the Meson Hall south mezzanine.  There were already 3 other circuits wired in series with each signal
Entry  Friday, April 12, 2013, 13:28, Isaac Earle, Standard Operation, Target 1, Cooling, Cooling Packages Leak Tight 
 The T1 and T2 expansion tanks were filled on Monday April 8th.  There was no change in the level when inspected today (April 12th).  Visual
inspection of the packages also found no leaks.
Entry  Tuesday, April 09, 2013, 17:06, Isaac Earle, Repair, Target 1, Target, T1 Target Electronics Check 
The T1-MK1 target protect and profile monitor electronics were 'blip' tested by Bill Rawnsley on April 5, 2013.  The response from the profile monitor
appeared normal, however the protect monitor response was very weak.  After various debugging it was found that the 9 pin connector on the target
on the vacuum side of the vacuum flange had become disconnected from the vacuum flange feed-through.  It is suspected that this happened while changing
Entry  Tuesday, March 26, 2013, 10:55, Isaac Earle, Maintenance, Target 1, Target, T1-MK1 Re-wiring and MRO Complete T1-MK1_Tgt_leak_check.PDF
 The following work was performed on the T1-MK1 target:
- Unused proximity sensor removed
- Lift flange removed, painted, relabeled
Entry  Monday, March 18, 2013, 15:17, Isaac Earle, Maintenance, Target 2, Target, T2-MK2 Target Maintenance and Re-Wiring IMG_1189.JPGIMG_1194.JPGIMG_1197.JPGIMG_1207.JPGT2-MK2_Tgt_leak_check.PDF
- T2-MK2 target moved from beamline to hot cell (Feb 4th)
- Steel target support shield installed as well as ~3 layers of lead blankets.  Even with this extra shielding fields in the working area were
as high as 800µSv/hr.
Entry  Wednesday, March 06, 2013, 12:13, Isaac Earle, Maintenance, Target 2, Cooling, T2 Heat Exchanger MRO 7x
- The new tube array was picked up from Kaltech on Feb 8th (observed vessel holding 60psi on hydro test at their shop)
- Vacuum leak checked at TRIUMF: would not pump down
- Applied 20psi air, and found leaks on both tube sheets using Snoop
Entry  Tuesday, February 05, 2013, 09:50, Isaac Earle, Maintenance, Target 2, Target, T2-MK2 target moved from beam line to hot cell IMG_0868.JPG
The T2-MK2 target was transported from the beam line to the RH hot cell.  The profile monitor was secured in the 'in' position before lifting the
target, as it is better protected in this configuration.  This procedure will be used for all future target moves to reduce the risk of damage to
the monitor.
Entry  Tuesday, January 29, 2013, 15:55, Isaac Earle, Maintenance, Target 2, Cooling, T2 H.E. Transported to Warm Cell IMG_0860.JPGIMG_0864.JPG
Friday Jan 25:
- Both sides of heat exchanger drained, disconnected, and capped
- Heat exchanger transported to warm cell (field from H.E. approximately 15
Entry  Monday, January 21, 2013, 16:18, Isaac Earle, Standard Operation, Target 2, Target, T2 Cooling Package Water Released 
The T2 cooling package water was drained to the BL1A active sump, refilled, cycled, and drained again.  Samples of T2 cooling package active water
was given to RPG, tested, and approved for release.
On January 21 at approximately 4pm the full volume of the sump (280L) was released to the city sewer.
Entry  Monday, January 21, 2013, 11:57, Isaac Earle, Repair, Target 2, Target, Flask Repair IMG_0818.JPGIMG_0824.JPGIMG_0836.JPGIMG_0838.JPG
 On January 15th, when attempting to move the T2 target from the beam line to the hot cell, the latch mechanism on the flask did not actuate and
the target could not be lifted from the beam line.  
On January 16th the flask was placed on blocks (IMG_0818) (while remaining attached to the crane) in the RH hot cell lab for inspection.  The
Entry  Monday, January 14, 2013, 16:55, Isaac Earle, Standard Operation, Target 2, Target, Target Move & Damaged Profile Monitor 
The T2-MK1 target (spare T2 target) was transported from the hot cell to the storage pit today.  
While the flask was being aligned to the storage pit locating pins, the base of the flask bumped the top of one of the alignment pins.  This
was caused by a slight misalignment between the flask locating hole and the alignment pin at the moment when the flask was lowered.  This caused the
Entry  Friday, January 11, 2013, 15:48, Isaac Earle, Standard Operation, Target 1, Target, BL1A Tunnel Accessed IMG_0801.JPGIMG_0802.JPG
 The BL1A tunnel was accessed to drain and sample T2 cooling package water.  A puddle of water was noticed in the South TNF area around the
drain by the boot-box.  No water was found in the BL1A tunnel.  Photos attached.
Entry  Tuesday, January 08, 2013, 10:52, Isaac Earle, Maintenance, Target 2, Target, T2-MK1 Target Maintenance 
- T2-MK1 target transported from storage pit to hot cell
- Proximity sensor removed
- Target lift "T" removed, painted, relabeled
Entry  Tuesday, January 08, 2013, 09:27, Isaac Earle, Standard Operation, Target 2, Target, BL1A Air Amplifier turned off for duration of shutdown. 
 The BL1A air amplifier has been shut down by closing the air supply valve on the device. The
air amplifier supplies high pressure air (110psi) to the following devices: M9BB, M20BB, T1 Profile Monitor, T2 Profile Monitor, T2 Collimator, Septum
Polarity Switch
Entry  Monday, December 10, 2012, 15:42, Isaac Earle, Maintenance, Target 1, Target, T1-MK2 Target Maintenance 
- T1-MK2 target moved from storage pit to hot cell
- Removed unused proximity sensor and associated wiring (stored in tool-port boot box cabinet)
- Tested profile monitor actuation: seems stiff, but moves ok;  start travel @ 30psi, fully in position @ 50psi
Entry  Thursday, November 22, 2012, 17:22, Isaac Earle, Standard Operation, Target 1, Active Sump, RH Lab Active Sump Released 
 On Wednesday November 21 at approximately 9am the level of the Remote Handling active sump was inspected and found to be at approximately the 7000L
level.  The high level alarm sounds at approximately 5800L.  The high level alarm had been silenced by somebody, and RH staff had not been notified.
 It is unknown when the high level alarm was reached.  The total sump volume is 7200L (which if exceeded will cause active water to spill on
Entry  Tuesday, November 13, 2012, 16:26, Isaac Earle, Repair, Target 1, Target, Manipulator Repair Complete 
 Repair of the west side manipulator in the west hot cell was completed today.  Part of the repair was done by entering the hot cell using
double tank suits and supplied air.  The repair was then completed on the master side of the manipulator.  The manipulator is now operating smoothly.
Two sales representatives from Central Research Labs visited TRIUMF today as they were already in Vancouver on other business.  I showed them
Entry  Wednesday, October 24, 2012, 17:38, Isaac Earle, Repair, Target 2, Target, T1 & T2 Target Ladder Control System Status 
 During the recent shutdown for the T2/M9 joint repair Graham Waters replaced the corrupted application code on the controller RAM disk.  The
T1 target position control is now functioning properly.  T2 target position control is still not operational due to an electronics problem within
the motor driver.   The T2 ladder position may still be moved using the portable control box.  The T2 target ladder was moved to position 3 (10cm
Entry  Wednesday, October 24, 2012, 17:34, Isaac Earle, Repair, Target 1, Target, T1-MK2 Target Repair Complete 
The target ladder was detached, old delta seals removed, sealing surfaces cleaned using scotchbrite pad and a dremel tool, and delta seals were installed
on the lower face of the upper slide plate.  The target was leak checked and found to have no significant leaks (no response from 2s helium spray
at previous leak location on upper slide plate).
Entry  Friday, September 28, 2012, 15:19, Isaac Earle, Repair, Target 1, Target, T1-MK2 Delta Seal Leak 
  After removal of the leaky target cassette at position 3, plugs were installed on the target ladder and a leak check was performed.  With
the target pumped down to approximately 10 mTorr, and helium detector gauge baseline of 9 on the 10X scale, a response of up to 25 on the 500X scale was
observed when leak checking the right side delta seal on the lower face of the upper slide plate using a standard 1s spray of helium at 3 psi.  The
Entry  Tuesday, September 25, 2012, 16:31, Isaac Earle, Repair, Target 1, Target, T1/T2 Controls 
 - The target control software was modified to reference the correct pot. look-up table for the target at T1 (T1-MK1)
 - The target position buttons on the T1 & T2 panels were not working properly and Graham Waters was contacted to investigate
 - Graham power cycled the microprocessor and the TG1 crate which seemed to make things worse (the control software would not even boot up)
Entry  Thursday, September 13, 2012, 18:09, Isaac Earle, Maintenance, Target 1, Cooling, September Shutdown T1 & T2 MRO IMG_0624.JPGIMG_0658.JPG
 The following tasks were performed during the 2012 September Shutdown:
- Both targets moved to position 0 in preparation for testing of profile monitors (portable ladder control box was used for controlling ladder
motors)
Entry  Friday, September 07, 2012, 16:39, Isaac Earle, Repair, Target 1, Target, RH Lab Crane Repaired 
 The "west" button on the crane pendant was broken, and the crane would occasionally continue moving west when the button was released.
 The button was replaced by a Gordon Crane technician, who also did a crane inspection.  The hoist in the target flask is also due for an inspection,
but it was not possible to do it this visit.  Neil Wong will try to have it done next time a crane technician is in.
Entry  Friday, September 07, 2012, 16:35, Isaac Earle, Repair, Target 2, Target, T2-MK1 Target Repair Completed 
 - Profile monitor wiring harness checked by Bill Rawnsley using resistor pack --> OK
 - New profile monitor (0.005" gold coated molybdenum wires) installed & blip tested --> OK
 - Potentiometer checked --> OK
Entry  Wednesday, August 08, 2012, 14:40, Isaac Earle, Repair, Target 1, Target, T1-MK1 Target Repair Complete 
- Re-wired profile monitor was received from Probes Group and installed on the target
- Protect and profile monitors were 'blip' tested, both OK
- Profile monitor actuation and limit switches tested, all OK (monitor starts to travel @ 20psi,
Entry  Friday, July 27, 2012, 14:48, Isaac Earle, Repair, Target 1, Target, T1-MK1 Target Repair Update 
- T1MK1 target transferred from storage pit to hot cell (max field: 4700 μSv/hr
@ 0.5m)
Entry  Monday, July 23, 2012, 16:01, Isaac Earle, Development, Target 1, Target, Target Flask Seismic Restraint Clamps Installed IMG_0427.JPGIMG_0428.JPGIMG_0429.JPG
 Installation of the seismic restraint clamps has been completed for the MK1 and MK2 target flasks in the Remote Handling lab (photos attached).
 Two clamps on the MK1 flask required 3/8" shims due to warpage of the flask baseplate (see photo IMG_0429).
Dragan Mitrovic has been notified so that he can inspect the installation and close the work request.
Entry  Tuesday, July 17, 2012, 15:30, Isaac Earle, Development, Target 1, Cooling, T1 & T2 Expansion Tank Level Warnings Added 
 Mike Mouat and Juan Pon have modified the control system so that the control room will receive a message when the warning or trip level sensors
for the T1 & T2 expansion tanks read "NOT OK".  The message also displays the current water height in the tank.  This will help
with earlier detection of water leaks from the cooling package or from the target ladder in the vacuum volume when the vacuum interlock has been defeated.
Entry  Wednesday, July 11, 2012, 17:51, Isaac Earle, Repair, Target 1, Target, T1 Target Swap 
 BL1A was started yesterday and brought up to 10μA.  A problem was noticed with the T1 protect monitor (the right and bottom plates were not showing any response when the beam was swept
across the monitor).  The protect monitor is new and was installed on the target assembly in February 2012, so this is the first time it has seen
Entry  Monday, July 09, 2012, 17:17, Isaac Earle, Standard Operation, Target 1, Target, BL1A Start-Up Prep 
 - T1 & T2 targets switched to "remote" control
 - Both target ladders were moved to Position 3 (12mm Be)
 - T2 Q1 flow interlock defeat was removed (only required when target ladder is in position zero)
Entry  Friday, July 06, 2012, 16:03, Isaac Earle, Repair, Target 1, Target, T1-MK2 Target Repair Complete T1MK2_-_July_2012.pdf
 Target elevation measurements and beam spot plots were completed on the T1-MK2 target and the target is now fully repaired and ready for use.  It
will be returned to the storage pit when cranes are available.
A copy of the elevations measurements and beam spot plots is attached.
Entry  Tuesday, July 03, 2012, 13:23, Isaac Earle, Standard Operation, Target 2, Target, T2 Plug Block Replaced & Beam Blockers Tested 
The T2 plug block was replaced and the M9 and M20 beam blockers were tested.  The plug block did not interfere with the travel of the beam blockers.
 There was no change in the T2 vacuum during BB actuation.
Initially there was some confusion about how to actuate the beam blockers.  The following was learned:
Entry  Friday, June 29, 2012, 14:18, Isaac Earle, Repair, Target 1, Target, Manipulator Repair Complete 
 Repair of the west side hot cell manipulator was completed and the manipulator was re-installed into the cell.  The z-motion slave tapes,
upper counterweight tapes, and lower counterweight tapes were replaced on both sides.
100cpm contamination was found on the slave arm from a wet wipe.  No contamination was found in the lab.
Entry  Tuesday, June 26, 2012, 09:05, Isaac Earle, Maintenance, Target 1, Cooling, T1 & T2 Target Water Flow Transducers Serviced T1_&_T2_water_flow.jpg
 The target water outlet flow transducers on the T1 and T2 cooling packages were serviced (new shaft, paddle wheel, & o-ring) to address a noisy
signal.  The service corrected the noisy signal.  Additionally, it appears the worn parts were causing the transducers to read high, as both
dropped approximately 1 gallon/minute after the service.  Both transducers would occasionally trip the high flow warning (8.5gpm), and should now
Entry  Friday, June 22, 2012, 13:54, Isaac Earle, Maintenance, Target 2, Target, Air Amplifier Rebuild Complete 
A full rebuild of the upper air amplifier was completed.  New anodized aluminum barrels were installed (replacing the old brass design), as well
as new pilot valves, piston seals, bearings, and o-rings.  
The amplifier is operating smoothly with a cycle period of 25.6 seconds, compared to 14.8s before rebuild (based on 8 cycle measurents at 110psi
Entry  Friday, June 22, 2012, 13:48, Isaac Earle, Development, Target 1, Cooling, T1 & T2 Expansion Tank Level Sensor Recording Enabled 
Mike Mouat enabled recording for T1 and T2 expansion tank warning and trip level sensors on XTPAGE/XSTRIP.
XSTRIP output is in discreet integers as follows:
2 = Both sensors OK
Entry  Thursday, June 21, 2012, 13:38, Isaac Earle, Standard Operation, Target 2, Cooling, T2 Water Package Started 
 The T2 water package was reconnected to the target and started after being shut-off since April 12, 2012.  The M9 and M20 groups do not anticipate
having to vent the T2 volume, so the package will be left running in preparation for BL1A start-up in early July.  There was no change in T2 vacuum
levels during start-up, and therefore no water leaks into the vacuum volume.
Entry  Monday, June 18, 2012, 16:27, Isaac Earle, Repair, Target 1, Target, T1-MK2 Profile and Protect Monitor Electronics Check 
 Bill Rawnsley and Mike Russell performed a 'blip' test on the T1-MK2 profile monitor and protect monitors today.  A possible bad wire at  #9
location in the vertical array on the profile monitor was found (this is two wires above center).  Bill did not think this was a serious concern and
beam tuning can be (and has been done in the past) with wires missing.  Otherwise the responses were normal for both monitors and the scope readings
Entry  Friday, June 08, 2012, 17:01, Isaac Earle, Repair, Target 1, Target, T1-MK2 Leak Repair Update 
 A leak check was performed on the T1-MK2 target in the hot cell today and confirmed successful leak-free installation of the new water supply tubes,
delta seal retaining rings, and delta seals on the upper slide plate.  The remaining tasks are to install delta seals on the lower slide plate and
have the protect monitor and profile monitor electronics checked by diagnostics group.
Entry  Friday, June 08, 2012, 16:52, Isaac Earle, Repair, Target 1, Target, Broken Manipulator Tape Update 
 The broken tape on the west side hot cell manipulator was found to be one of two "Z motion slave tapes".  The manipulator can still
function normally with only one, however the remaining tape will see twice the load as usual.  It was decided that repair of the manipulator may be
delayed until after the T1-MK2 target repair job is complete.  Lifting of heavy objects using the west side manipulator will be avoided until after
Entry  Thursday, June 07, 2012, 18:08, Isaac Earle, Repair, Target 1, Target, Hot Cell Manipulator Broken Tape 
 A tape snapped on the west side manipulator today while working on the T1-MK2 target repair.  The tape travels through to the slave end, so
unfortunately the manipulator will need to be removed from the hot cell for repair.  This is the same manipulator that was just out for a broken cable
repair, and I suspect that the tape was accidentally kinked or dislodged from a pulley when the manipulator was disassembled.
Entry  Wednesday, June 06, 2012, 08:58, Isaac Earle, Maintenance, Target 2, Target, T2 Monolith Leak Check 
 While leak checking components in the M20 front end on May 25th, the top of the T2 monolith was also checked by flooding the top of the monolith
with helium while it was covered with plastic sheeting.  There was no response on the Varian leak detector indicating no significant leaks from the
flange seals, shaft seals, and seals for upper services on the T2 target, T2 protect monitor, M9BB, M20BB, and M8BB/Col.A
Entry  Wednesday, June 06, 2012, 08:48, Isaac Earle, Repair, Target 1, Target, Manipulator Repair Complete 
 Repair of the west side hot cell manipulator was completed and the manipulator was re-installed into the hot cell.  No contamination was found
in the lab, on the manipulator support frame, or on any tools.  A 'y' motion lock was also installed on the east manipulator and all accessible pulleys
and rollers were lubricated.
Entry  Wednesday, May 30, 2012, 15:39, Isaac Earle, Repair, Target 1, Target, West Side Manipulator Removed from Hot Cell IMG_0227.JPGIMG_0231.JPGIMG_0238.JPGIMG_0241.JPG
 The west side manipulator was removed from the hot cell using the new manipulator removal frame.  The operation went smoothly and required
about one hour with two operators after everything had been prepared.  No contamination was found on the manipulator thru-tube or slave arm.  Only
50cpm were measured on the wrist assembly of the slave end.
Entry  Monday, May 28, 2012, 17:17, Isaac Earle, Repair, Target 2, Cooling, T2 Water Loss Update 
 The T2 cooling package, the top of the T2 monolith, and the Hansen water connections which connect the package to the target were inspected and
no evidence of a water leak was found.  Kim wipes had been stuffed inside the female Hansen fittings after they were disconnected on April 12th, and
these were also completely dry.  I checked with control room and there are no log entries regarding anyone starting the cooling package during the
Entry  Thursday, May 24, 2012, 18:26, Isaac Earle, Repair, Target 2, Cooling, Water Leak From T2 Cooling Package (Disconnected from Target) 
 Today I noticed a "NOT OK" signal from T2 water expansion tank warning level sensor.  I checked the water level in the tank and
confirmed that the water level in the tank had indeed dropped.  The water package is currently not connected to the target so it is not possible for
this water to enter the beam line.  
Entry  Monday, April 23, 2012, 09:55, Isaac Earle, Repair, Target 1, Target, Hot Cell Manipulator Broken Cable 
 While working on the leak repair of the T1-MK2 target in the hot cell on Friday April 20th, a cable snapped on the slave end of the right side
manipulator.  It is suspected to be the 'Y' shaped cable assembly that actuates the grippers when the lever is pulled on the master end.
The target repair job cannot continue until the manipulator is repaired.  The repair job may take up to a full week, and will require space
Entry  Thursday, April 12, 2012, 15:19, Isaac Earle, Maintenance, Target 2, Target, T2 Target Water Drained 
 In preparation for extended periods of the T2 volume being vented during the M20 repair, the T2 water package was shut-off, the water lines were
disconnected from the target, and the cooling water was removed from the target using compressed air.
Entry  Wednesday, April 11, 2012, 17:02, Isaac Earle, Repair, Target 2, Target, T2 Vacuum Interlock & Expansion Tank Level Sensor 
 The problem with the T2 vacuum interlock was fixed by restarting the "Crate TG1" control panel microprocessor.  The T1 and T2 vacuum
interlocks were retested several times and are functioning properly.  Fault report #5907 was returned.
 
Entry  Thursday, April 05, 2012, 15:22, Isaac Earle, Maintenance, Target 1, Target, T1 & T2 Profile and Protect "Blip" Test 
 Diagnostics group completed their "blip" signal response tests on the T1 and T2 profile and protect monitors.  A small amount of
leakage was observed on the T2 profile monitor, but was not thought to be a significant concern.  All other results were normal.
Entry  Thursday, April 05, 2012, 12:14, Isaac Earle, Repair, Target 1, Target, T1 & T2 Profile Monitors 
Controls Group replaced the wiring and wire harness for the profile monitor limit switches on T2.  The monitor was actuated remotely and functioned
properly.
The T1 profile monitor was also tested and actuated properly.  The T1 monolith is now ready to be covered so that blocks may be removed from
Entry  Wednesday, April 04, 2012, 15:51, Isaac Earle, Repair, Target 2, Target, BL1A Update 
Vacuum interlock defeat jumpers were removed for T1 and T2.  The interlock was tested by venting the T1 and T2 volumes.  Both packages registered
a vacuum trip, however only the T1 package shut off.  A fault report has been filed to investigate this.
 
Entry  Tuesday, April 03, 2012, 15:55, Isaac Earle, Maintenance, Target 1, Target, T1 Ladder Position Look-up Tables Updated 
 Graham Waters has activated the appropriate target ladder position look-up tables for the T1-MK1 target which was installed in the beam line yesterday.
Entry  Monday, April 02, 2012, 15:18, Isaac Earle, Repair, Target 1, Target, T1-MK1 Installed in Beam Line 
 The T1-MK1 target was transferred from the storage pit to the beam line.  Services were hooked up and the cooling package was started (operating
normally).
Target ladder documentation and elevation values for the new target were delivered to operations.
Entry  Tuesday, March 27, 2012, 13:14, Isaac Earle, Repair, Target 1, Target, Water removal from T1 monolith downstream.jpgsouth.jpgupstream.jpgM13.jpg
All water was removed from the base of the target hole in the T1 monolith using a suction tube device and wypalls.  Video inspection was performed
and revealed standing water in the unused 4" beam line pipe facing south as well as on the bellows on the M13 beam line.  (Photos attached)
Vacuum group is currently pumping down on the T1 volume to remove the remainder of the water.
Entry  Friday, March 23, 2012, 14:50, Isaac Earle, Repair, Target 1, Target, T1 Target Leak - Update 
The T1-MK2 target was transferred from the beam line to the hot cell.  Water was seen in the bottom of the target pipe confirming that the leak
is from the target.  The lower cone of the target assembly was submerged in the water and came up dripping wet.  The profile monitor, protect
monitor, and two of the target cassettes were also wet.  As it is not possible for those to be submerged, water was likely spraying from either the
Entry  Thursday, March 22, 2012, 13:58, Isaac Earle, Repair, Target 1, Cooling, T1 Package Water Leak - Update 
 Vacuum group pumped down on the T1 & T2 volumes (because there is no cold trap on the T1 pump) for approximately 1 hour this morning.  A
significant amount of water was found in the base of the cold trap which confirms our suspicions of a water leak on the T1 target.
Tomorrow we will transfer the T1 target from the beam line to the hot cell for inspection, leak checking, and repair.
Entry  Wednesday, March 21, 2012, 17:28, Isaac Earle, Repair, Target 1, Cooling, T1 Package Water Leak - Update 
 The water level in the T1 cooling package expansion tank was checked again today approximately 24 hours after it was refilled.  The level
had dropped about 5cm, equating to roughly 3.5L of water lost.
The T1 package was inspected thoroughly and no water was found.  A leak on the target in the beamline is suspected.  The T1 package has
Entry  Tuesday, March 20, 2012, 10:31, Isaac Earle, Repair, Target 1, Cooling, T1 Cooling Package - Potential Water Leak 
The T1 expansion tank warning level sensor had tripped and the level was approximately 1cm from the base of the tank.  No trip warning was observed
when Tom Lyth checked the panels last week.  The T1 cooling package and target monolith were inspected and no water was observed.  Two puddles
of water were found in the BL1A tunnel around the T1 package area: one directly below the 1AQ9 Cable Interlock Tray, and another approximately 1.5m to
Entry  Tuesday, March 06, 2012, 15:27, Isaac Earle, Repair, Target 1, Target, Quick Connect Fittings on T1 Target 
 The air hoses for the profile monitor supply line were inspected and no cracking was found (was found on T2).  The quick connect fittings
for the bottom air assembly were sticky/corroded and not actuating properly.  Replaced fittings with new parts.
Entry  Tuesday, February 21, 2012, 09:56, Isaac Earle, Repair, Target 2, Target, Air Supply Check Valve & Q4 Flow Transducer T2_Q4_Flow_Transducer.JPG
 The faulty air pressure supply check valve for M9BB, M20BB, and T2 Profile Monitor was replaced.
The rotor, shaft, and o-ring were replaced on the Q4 flow transducer to address erroneous readout that began last week.
The attached plot shows the flow readout before failure, during the failed state, and after repair.
Entry  Thursday, February 09, 2012, 17:19, Isaac Earle, Repair, Target 1, Cooling, T1 & T2 General MRO 
 The following work was performed on the T1 cooling package:
- New filter housing installed for Col. A filter.  The new housing has a drain valve to prevent water spills during future filter changes.
- Ball valve installed upstream of Col. A filter to allow proper isolation of filter during filter changes.
Entry  Thursday, February 02, 2012, 16:54, Isaac Earle, Repair, Target 2, Cooling, T2 Device Air Line Issue 
While checking operation of the M9 and M20 beam blockers earlier this week, a strange noise was noticed coming from the T2 cooling package area.  It
is a squealing sound that starts when M9BB, M20BB, or T2 profile monitor are actuated and continues for approximately 30 seconds, then stops.  The
source was eventually narrowed down to somewhere on the air supply line coming from the air amplifiers on the south mezanine.  When the air amplifiers
Entry  Monday, January 30, 2012, 16:44, Isaac Earle, Maintenance, Target 1, Cooling, Completed T1 Cooling Package MRO 
Replaced all o-rings and filters on the T1 cooling package.  Replaced resin can.  Refilled package
and restarted. 
Can inlet resistivity at 9.8M
Entry  Wednesday, January 25, 2012, 13:26, Isaac Earle, Maintenance, Target 2, Target, M9BB Returned to Beam Line 
M9 beam blocker returned to beam line.
T2 target disconnected, picked up using flask, and returned to beam line as training exercise.
Field @ 50cm from T2 target during removal:  ~90,000μSv/hr
Entry  Monday, January 23, 2012, 15:27, Isaac Earle, Repair, Target 2, Target, M20BB returned to beam line. M9BB moved to hot cell. 
M20 beam blocker was transferred from the hot cell to the beam line.
M9 beam blocker was transferred from the beam line to the hot cell.
Field at 50cm from M9 beam blocker during removal: 5000μSv/hr
Entry  Friday, January 20, 2012, 10:23, Isaac Earle, Repair, Target 2, Target, M20 BB Shaft Bearing Replaced P1010788.JPGP1010808.JPG
The replacement shaft bearing was machined by Maico Dalla Valle and installed in the beam blocker.  Smooth operation of the beam blocker air cylinders
was confirmed, and the beam blocker is scheduled to be re-installed in the T2 monolith on Monday morning (Jan 23).
Entry  Wednesday, January 18, 2012, 12:01, Isaac Earle, Repair, Target 2, Target, Broken M20BB Bearing Removed, New Design Complete P1010779.JPGP1010778.JPGP1010781.JPGM20BB_Split_Flange_Shaft_Bearing.PDF
 The broken M20 beam blocker plastic shaft bearing was removed.  Measurements of the bearing as well as the shielding disc (for which drawings
can't be found) were taken inside the hot cell and a brass replacement bearing has been designed based on these measurements.
Photos of the removed bearing, measured dimensions of bearing and shielding disc, and a PDF drawing of the new design are attached.
Entry  Friday, January 13, 2012, 17:04, Isaac Earle, Repair, Target 2, Target, Broken Part found on M20 Beam Blocker P1010769.JPGP1010772.JPG
 While wrapping up vacuum seal bearing replacement on the M20 beam blocker I found a piece of hard black material approximately 3x1x1cm on top of
the hot cell turntable.   Checked for contamination and found 480,000cpm on the Ludlum 44-2 probe, and off scale on the pancake monitor.  This
piece fell from the transport flask when it was opened above the hot cell after picking up the M20 beam blocker.  Upon further inspection, more pieces
Entry  Thursday, January 12, 2012, 11:34, Isaac Earle, Maintenance, Target 2, Target, Replaced M20 Beam Blocker Vacuum Seal O-Rings 
 Replaced M20 beam blocker vacuum seal o-rings.  Old o-rings were noticeably harder, but not brittle or cracked.  Applied "Haskel
Dry Air Seal" lubricant to air cylinder shafts and "Apiezon M Grease" to vacuum seal o-rings and main shaft.  Took approximately 1
full days work.  Total dose: 0.08mSv.
Entry  Friday, January 06, 2012, 15:37, Isaac Earle, Maintenance, Target 2, Target, Transferred M20 beam blocker to hot cell 
Uncovered T2 monolith and transferred M20BB to hot cell using flask.
  
Field at 0.5m from beam blocker while being lifted with flask: 21,700
Entry  Thursday, January 05, 2012, 10:21, Isaac Earle, Maintenance, Target 1, Cooling, Defeated T1 and T2 cooling package vacuum interlocks. 
 Defeated T1 and T2 cooling package vacuum interlocks at 1-C panel on South mezzanine in Meson Hall to allow cooling packages to continue running
after beamlines are vented.
Notified operations.
Entry  Thursday, January 05, 2012, 10:18, Isaac Earle, Maintenance, Target 2, Cooling, Swapped Resin in T2 Cooling Package 
Drained T2 cooling package water, collected sample and delivered to RPG.  Swapped resin can, refilled, and restarted cooling package.
After 6 hours can inlet at 10.3MΩ *cm,
can outlet at 10.5MΩ*cm electrical resistivity.
Entry  Thursday, December 22, 2011, 15:27, Isaac Earle, Maintenance, Target 1, Target, T1-MK1 Transferred to Storage Pit 
 T1-MK1 target transferred from hot cell to storage pit position #3 to free up the hot cell in preparation for shut-down activities.
Current device locations in storage pit:
Pos 1: TNF Resin Can
Entry  Tuesday, December 20, 2011, 09:54, Isaac Earle, Maintenance, Target 1, Target, Replaced T1-MK1 Target Ladder 
Replaced T1-MK1 target ladder with the new ladder design which has an integrated upper slide plate (2 less sealing locations) and no c-seal grooves.
 C-seals replaced with aliuminum delta seals.Transfered all target cassettes to new ladder in the same positions.  Performed helium leak check
at interface with bellows flanges and all cassette locations.  No leaks detected.
Entry  Friday, November 04, 2011, 13:36, Isaac Earle, Maintenance, Target 2, Target, Kaon Target (Training) 
  Moved Kaon Target from storage pit to remote handling hot cell using flask as training exercise.  Safety surveyor scanned storage pit
area (wide flanges: clean,  pit floor: 50cpm).  Returned flask to hot cell lab floor and covered storage pit.
Entry  Thursday, June 30, 2011, 16:47, John Wong, Development, Target 1, Target, Testing Elog 