Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, all entries  Not logged in ELOG logo
  ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  44   Monday, November 14, 2011, 11:56 Peter Kunz UC238634-10LP-SISDoneUCx03: Conditioning up to 175AEvaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid
 0--0009.jpg0--0011.jpg 
  58   Monday, September 03, 2012, 02:56 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Organic/volatile burnoff complete at TGHT
= 190A. Rampdown initiated.
  
  59   Tuesday, September 04, 2012, 17:26 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Organic gunk cleaned out. Beginning 2nd phase
of conditioning.
  
  60   Friday, September 07, 2012, 17:21 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr.
Cool down sequence initiated.
  
  61   Monday, September 10, 2012, 11:00 Peter Kunz UC239165-5LP-SISIn progressConditioning UCx05Plot of conditioning run: IEVAP:IG1, TGHT  UC2_05_conditioning.png 
  70   Tuesday, July 02, 2013, 11:13 Peter Kunz UO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013) 
1. stage - burning off organics complete
2. stage - carbonization began 1-8
 UO2-C-01.png 
  175   Thursday, November 23, 2017, 13:39 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#3 Thursday, November 23, 2017, 13:34
Circles from cast 1 were used,
 171124_1e-1.jpg 
  176   Wednesday, January 10, 2018, 14:44 Marla CervantesUO2/C40282-1TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#4 Wednesday, January 10, 2018, 14:44
Circles from cast 1 were used,
  
  178   Wednesday, January 17, 2018, 13:47 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#5 Monday, January 15, 2018, 13:37
35 circles of 14 mm diameter
 Carbonization-Batch5-180118.docx 
  179   Thursday, January 18, 2018, 11:56 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container TP1-off_#4

    

       
            
 Carbonization-Batch4-110118-TP_off.docx 
  180   Friday, January 19, 2018, 12:32 Marla CervantesUO2/C40282-2 TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6 Friday, January 19, 2018, 12:29
Circles from cast 1 were used,
  
  181   Monday, January 22, 2018, 15:51 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6

    

       
            
  
  182   Monday, January 22, 2018, 16:20 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6

    

       
            
 180122-1e-1.jpg 
  183   Tuesday, January 23, 2018, 12:49 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#6

    

       
            
 Carbonization-Batch6-220118.docx 
  184   Monday, January 29, 2018, 09:28 Marla CervantesUO2/C40282-2 TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7 Monday, January 29, 2018, 09:26
35 circles of 14 mm diameter
  
  185   Monday, January 29, 2018, 11:07 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7

    

       
            
  
  186   Monday, January 29, 2018, 14:25 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7

    

       
            
  
  187   Tuesday, January 30, 2018, 16:07 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#7

    

       
            
 Carbonization-Batch7-300118.docx 
  188   Thursday, February 01, 2018, 13:15 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#8 Thursday, February 01, 2018, 12:59
35 circles of 14 mm diameter
 Carbonization-Batch8-020218.docx 
  189   Monday, February 05, 2018, 17:26 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#9Monday,
February 05, 2018, 17:24
 Carbonization-Batch9-060218.docx 
  190   Thursday, February 08, 2018, 14:51 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14
  
  191   Friday, February 09, 2018, 16:57 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10

    

       
            
  
  192   Friday, February 09, 2018, 17:04 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10

    

       
            
 20180209_153539.jpg20180209_153728.jpg20180209_153817.jpgCarbonization-current_trippoff.JPGCarbonization-Batch10-090218.docx 
  193   Tuesday, February 13, 2018, 11:44 Marla CervantesUO2/C40282-1TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#11 Tuesday, February 13, 2018, 11:39
35 circles of 14 mm diameter
 Carbonization-current_trippoff2.JPGTa-Boat.jpgC-Container.jpg 
  195   Friday, March 02, 2018, 16:35 Marla CervantesUO2/C40282-1TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#11

    

       
            
  
  196   Friday, March 02, 2018, 16:35 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#11

    

       
            
  
  197   Monday, March 12, 2018, 11:14 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#12 Monday, March 12, 2018, 9:13
35 circles from cast#2 of 14
  
  204   Friday, May 11, 2018, 12:36 Marla CervantesUC241369-2LP-SISDoneUCx Fully loaded graphite insert thermal test - FL#1 Thursday, May 10, 2018, 16:00 
Graphite insert fully loaded
 180511-FL1_520A.png 
  205   Friday, May 18, 2018, 18:38 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container #13 Friday, May 18, 2018, 18:32
35 circles of 14 mm diameter
 180519-B13-Current_trip_off.JPG 
  206   Friday, May 25, 2018, 15:38 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing full length 1-step UCx target #2Friday,
May 25, 2018, 15:34 
  
  207   Monday, June 04, 2018, 11:29 Marla CervantesUC240282-1TARGET BOATDoneConditioning B13 and 2sc Friday, June 01, 2018, 11:20
Target boat was previously coated
  
  208   Wednesday, June 13, 2018, 10:20 Marla CervantesUO2/C40282-1TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14 Tuesday, June 12, 2018, 18:20
35 circles of 14 mm
  
  209   Wednesday, June 13, 2018, 11:09 Marla CervantesUO2/C40282-1TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14

    

       
            
  
  210   Wednesday, June 13, 2018, 12:25 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container #14

    

       
            
  
  211   Tuesday, June 19, 2018, 15:39 Marla CervantesUO2/C40282-1TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container #15 Friday, June 15, 2018, 16:39
35 circles of 14 mm
  
  216   Friday, August 17, 2018, 11:23 Marla CervantesUC2NA DoneUCx 1-step casting -Oxidation test Friday, August 17, 2018, 11:17
Four discs of UCx produced with the
1-step casting method were placed in a glass
  
  217   Tuesday, September 04, 2018, 10:18 Marla CervantesUC241369-2 In progressUCx Fully loaded graphite insert thermal test - FL#1.2 Monday, September 03, 2018, 10:17
Graphite insert fully loaded
 180904-UCxFL1-T2-2.png 
  222   Monday, October 22, 2018, 17:58 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22Monday, October 22, 2018, 17:55 
UO2/C green was prepared , September
 current-trip-1.jpgcurrent-trip-2.jpg 
  223   Tuesday, October 23, 2018, 10:24 Marla CervantesUC2 LP-SISProblemsConditioning UCx#25

    

       
            
  
  224   Tuesday, October 23, 2018, 10:49 Marla CervantesUC2 LP-SISProblems resolvedConditioning UCx#25

    

       
            
  
  225   Tuesday, October 23, 2018, 10:55 Marla CervantesUC2 LP-SISDoneConditioning UCx#25

    

       
            
 OrangeCoat.jpgIonizerTube.jpgClosedSide.jpg 
  226   Wednesday, October 24, 2018, 20:01 Marla CervantesUO2/C27252-1TARGET BOATProblemsProcessing UC2Flk_22

    

       
            
 PowerSupply-TempLog.xlsxCT-2.jpg 
  227   Thursday, October 25, 2018, 09:10 Marla CervantesUO2/C27252-1TARGET BOATDoneProcessing UC2Flk_22

    

       
            
  
  228   Tuesday, October 30, 2018, 10:17 Marla CervantesUC243044-7 LP-SISIn progressUCx Fully loaded graphite insert thermal test - FL#1 Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) 
 Heat_test.JPG 
  229   Wednesday, October 31, 2018, 10:30 Marla CervantesUC243044-7 LP-SISProblemsUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 current-trip_off.JPGepics.JPG 
  230   Wednesday, October 31, 2018, 15:23 Marla CervantesUC243044-7 LP-SISDoneUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 Ta-container.png 
  231   Thursday, November 22, 2018, 17:32 Marla CervantesUO2/C40202-1TARGET BOATProblemsUCx Fully loaded graphite insert - UCx26 Thursday, November 22, 2018, 17:25
D-shaped discs were cut from
 Nov23-CurrenTrip1.jpgNov23-CurrenTrip2.jpg 
  232   Monday, November 26, 2018, 17:06 Marla CervantesUO2/C40202-1TARGET BOATDoneUCx Fully loaded graphite insert - UCx26

    

       
            
 CR-UCx26.png 
  235   Wednesday, March 27, 2019, 08:56 Marla Cervantes 43630-6 DoneGraphite insert test 4 Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days
  
  236   Friday, April 05, 2019, 10:08 Marla Cervantes 43630-3 DoneTaC coating/sintering for graphite insert test Friday, April 05, 2019, 10:04
A tantalum tube was coated
 EVAP1-TaC_Coating.JPG 
  237   Wednesday, April 10, 2019, 13:38 Marla Cervantes 43630-3  DoneGraphite insert test #6 Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to
a graphite insert (see picture caps)
 caps.jpgCurren-voltage-plot.JPG 
  238   Friday, May 24, 2019, 15:25 Marla Cervantes 43943-1 DoneGraphite insert test - FOILS Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded
with graphite foils was transferred to EVAP1
  
  239   Monday, June 17, 2019, 08:58 Marla CervantesUO2/C TARGET BOATDoneUCx#27 Carbothermal reductionFriday, June 14, 2019, 17:10
A 14 mm die was used to cut
  
  240   Tuesday, July 30, 2019, 10:27 Marla CervantesUO2/C TARGET BOATDoneUCx#28 Carbothermal reductionFriday,
June 26, 2019, 17:10
 UCx28.JPG 
  241   Wednesday, September 18, 2019, 09:57 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #1Wednesday, September 18, 2019, 07:48
A TaC coated target container 
was loaded with a graphite cartridge with
  
  242   Tuesday, September 24, 2019, 06:53 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #2 Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously
  
  243   Wednesday, September 25, 2019, 14:00 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #3Wednesday, September 25, 2019, 14:00 
The target UCx28 that
  
  244   Friday, September 27, 2019, 18:04 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #4Friday, September 27, 2019, 18:03
The target UCx28 that
 IMG_1393.JPG 
  245   Wednesday, October 02, 2019, 11:07 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #5Monday, September 30, 2019, 10:54 
After being exposed to air for 1.5
hours,
  
  246   Wednesday, October 02, 2019, 11:10 Marla CervantesUO2/C TARGET BOATDoneUCx#29 Carbothermal reduction Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields
 CarbothermalReduction-UCx29.JPG 
  247   Tuesday, October 08, 2019, 09:53 Marla CervantesUC244062-6LP-SISDoneUCx29 ConditioningMonday, October 07, 2019, 09:51 
A TaC coated target
  
  248   Monday, October 28, 2019, 11:23 Marla CervantesUO2/C TARGET BOATIn progressUCx#30 Carbothermal ReductionMonday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum
 UCx30-CarbothramlReduction.JPGUCx30-CurrentDrop.JPG 
  249   Thursday, October 31, 2019, 13:59 Marla CervantesUO2/C TARGET BOATProblemsUCx#30 Carbothermal Reduction

    

       
            
  
  251   Wednesday, November 06, 2019, 11:48 Marla CervantesUC244062-3 LP-SISDoneUCx#30 Conditioning Tuesday, November 05, 2019, 16:43
A TaC coated target container 
  
  252   Wednesday, January 22, 2020, 18:10 Marla CervantesEmptyP2N-02  DoneP2N test#1The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The
 6x 
  253   Wednesday, January 29, 2020, 10:11 Marla CervantesEmptyP2N-02 DoneP2N test#2The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The
 P2N-test2_final_voltage.JPGP2N-test2.JPG 
  254   Thursday, January 30, 2020, 09:37 Marla CervantesUO2/CP2N-02 In progressP2N target material carbothermal reductionWednesday, January 29 2020, 05:55  
A P2N container  with
  
  255   Thursday, January 30, 2020, 10:15 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
  
  256   Thursday, January 30, 2020, 11:53 Marla CervantesUO2/CP2N-02 Problems resolvedP2N target material carbothermal reduction

    

       
            
  
  257   Thursday, January 30, 2020, 13:11 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
 voltage-rising.JPG 
  258   Friday, January 31, 2020, 15:36 Marla CervantesUO2/CP2N-02 DoneP2N target material carbothermal reduction

    

       
            
 P2N-Carbothermal_reduction.JPG 
  263   Thursday, August 13, 2020, 14:37 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
 200815-Vacuum_P2N.PNG 
  265   Tuesday, August 18, 2020, 20:45 Marla CervantesUO2/CP2N-02 Problems resolvedP2N target material carbothermal reduction

    

       
            
  
  266   Wednesday, August 19, 2020, 07:49 Marla CervantesUO2/CP2N-02 DoneP2N carbothermal reduction (#2)Wednesday,
August 19, 2020, 07:47 
 P2N.PNG 
  267   Tuesday, September 08, 2020, 20:45 Marla CervantesUO2/CP2N-02 DoneP2N-2 carbothermal reduction Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields,
 P2N-2-CR-1.PNG 
  268   Thursday, September 10, 2020, 14:07 Marla CervantesUO2/CP2N-02 DoneP2N-2 Conditioning Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced
but at the maximum current, the power supply
  
  269   Tuesday, March 30, 2021, 16:04 Marla CervantesUO2/CP2N-02 DoneP2N-3 carbothermal reductionGreen
target material characteristics  (elog 
  
  270   Thursday, April 15, 2021, 15:01 Marla Cervantes    IGP1 patchThursday, March 31, 2021, 14:42 
 
EVAP1's TGHT has
  
  271   Saturday, June 05, 2021, 09:14 Marla CervantesUC2 TARGET BOATIn progressUCx#33 Conditioning Saturday, June 05, 2021, 08:57
Target #33 was installed in
  
  274   Wednesday, September 15, 2021, 07:19 Marla CervantesUC2 TARGET BOATDoneConditioning 2sc samplesWednesday, September 14, 2021, 21:14
Boat is wrapped with 2 layers
  
  276   Friday, September 24, 2021, 15:40 Luca EgoritiTa LP-SISIn progressFull target release test 1 Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active
foils plus 4 active foils.  
  
  277   Friday, November 05, 2021, 13:38 Luca EgoritiTa LP-SISIn progressFull target release test 2 Friday, November 05, 2021, 13:23
Full target loaded with ~500
 Ta-ReleaseTest-2_low-current.JPG 
  278   Wednesday, November 24, 2021, 10:38 Luca EgoritiTa  In progressIPF release testsWednesday, November 24, 2021, 10:38
A first, short "FullTa1"
target was loaded into the evap1. It consists
  
  279   Wednesday, April 13, 2022, 10:55 Luca EgoritiUC2 P2N-SISDoneP2N carbothermal reduction P2Ncartridge-220323Wednesday, April 13, 2022, 10:50
P2NC-220323
Preparing the P2N-UCx for online
  
  280   Wednesday, May 04, 2022, 09:47 Luca EgoritiUC2 P2N-SISDoneP2N carbothermal reduction P2NC220408 Wednesday, May 04, 2022, 09:42
Yesterday, a second graphite cartridge
was installed in EVAP1, it consists of the
  
  66   Wednesday, June 05, 2013, 16:52 Laura LambertUC239165-6LP-SISDoneConditioning UCx#06

    

       
            
 UCx#6_conditioningstage1.PNG 
  68   Tuesday, June 25, 2013, 14:49 Laura LambertUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013) Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June
18, 2013 and let dry over the weekend.
  
  73   Friday, August 02, 2013, 11:06 Laura LambertUC238634-7LP-SISIn progressConditioning UCx # 07Thursday, August 01, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2.
  
  77   Tuesday, September 10, 2013, 12:20 Laura LambertUO2/CTarget Boat #2 DoneProcessing UC2 flaskes (batch#06 - 08222013

    

       
            
  
  78   Thursday, September 19, 2013, 15:41 Laura LambertUO2/CTarget Boat #2 In progressProcessing UC2 flakes (batch #07 - 09192013)Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17,
2013. The slurry was cast on a piece of glass
  
  85   Thursday, January 23, 2014, 16:29 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coatingThursday, January 23, 2014, 16:26 
 A new target boat was sprayed
with TaC coating and let dry, the coating
 IMG_20140123_143448877.jpgIMG_20140123_143507747.jpg 
  86   Friday, January 24, 2014, 14:45 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  87   Monday, January 27, 2014, 11:03 Laura LambertEmpty40282-1TARGET BOATDoneSintering Ta target boat with TaC coating

    

       
            
 IMG_20140128_113257662.jpg 
  88   Wednesday, February 05, 2014, 14:29 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_01 Wednesday, February 05, 2014, 14:13
1st attempt: 
UO2/C green was prepared on Feb 4,
 UO2_cast1.jpgUO2_cast2.jpgUO2_target_boat.jpgpre_auto-ramp.JPG 
  90   Wednesday, March 05, 2014, 10:30 Laura Lambert  TARGET BOATIn progressRe-sinterring end caps

    

       
            
  
  97   Wednesday, July 09, 2014, 13:57 Laura LambertThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils

    

       
            
 test_batch_full_sintering.JPGjul9_2014_(2).jpg 
  99   Tuesday, August 26, 2014, 15:27 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_03 Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20,
2014. The slurry was cast on a piece of glass
 carbonization.JPG 
  100   Tuesday, September 23, 2014, 15:00 Laura LambertUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_04 Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18,
2014. The slurry was cast on a piece of glass
  
  102   Friday, October 17, 2014, 11:55 Laura LambertUC240282-5LP-SISIn progressConditioning UCx #11 Friday, October 17, 2014, 11:47
Target container was previously coated
with TaC spray and sintered.
  
  104   Monday, November 10, 2014, 13:50 Laura LambertUC240282-5LP-SISDoneConditioning UCx #11

    

       
            
  
  105   Thursday, December 11, 2014, 10:17 Laura Lambert   Maintenancewater supply shut off for lab closure over holidays Thursday, December 11, 2014, 10:16
water valve shut off for lab closure
over the holidays.
  
  106   Friday, January 23, 2015, 15:02 Laura Lambert   Maintenancewater supply turned back on to EVAP1 and fume hoods Friday, January 23, 2015, 15:02
water supply turned back on to EVAP1
and fume hoods
  
  107   Monday, January 26, 2015, 11:28 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_05 Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20,
2015. The slurry was cast on a piece of glass
 flk5.jpgstriptool.JPG 
  108   Monday, March 09, 2015, 16:58 Laura LambertEmpty TARGET BOATMaintenanceTesting new software Monday, March 09, 2015, 16:55
After upgrading IOC for CXML program,
experienced some issues; therefore, switched
  
  109   Friday, March 20, 2015, 15:21 Laura LambertUC241177-2LP-SISDoneConditioning UCx #12Friday, March 20, 2015, 15:17 
Target container was previously
  
  110   Tuesday, April 21, 2015, 11:28 Laura Lambert   MaintenanceIon Gauge replaced March 23rd 2015    
  111   Monday, May 11, 2015, 11:49 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_06 Monday, May 11, 2015, 11:45
UO2/C green was prepared May
 IMG_20150508_143957199_HDR.jpgstriptool.JPGstriptool-zoom.JPG 
  112   Tuesday, June 30, 2015, 13:31 Laura LambertUC240860-1LP-IG-LISIn progressConditioning UCx #13 Tuesday, June 30, 2015, 13:28
Target container was previously
  
  114   Friday, July 03, 2015, 13:45 Laura LambertUC240860-1LP-IG-LISIn progressConditioning UCx #13

    

       
            
 evap1_trip_off_july_3rd.JPG 
  117   Tuesday, August 11, 2015, 10:23 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2_flk_07

    

       
            
  
  118   Wednesday, August 19, 2015, 11:44 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_08 Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug
 8x 
  122   Monday, October 26, 2015, 16:20 Laura LambertUC241077-5LP-SISDoneConditioning UCx#14

    

       
            
  
  123   Friday, December 04, 2015, 15:06 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round1 Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet
in the fume hood and let dry.
  
  124   Thursday, December 10, 2015, 10:59 Laura LambertUO2/C40282-1TARGET BOATDone1stepUCx project - round2 Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C
discs cast onto graphite.
 image.jpeg 
  125   Thursday, February 18, 2016, 15:42 Laura LambertUC241077-1LP-SISIn progressConditioning UCx#15 Thursday, February 18, 2016, 15:34
Target container was previously
  
  127   Monday, February 29, 2016, 16:16 Laura LambertUC241077-1LP-SISDoneConditioning UCx#15

    

       
            
 UCx_15.jpg 
  128   Tuesday, March 08, 2016, 11:19 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_10 Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March
 UCxFlk_10.jpgUCxFlk_10(2).jpgUCxFlk_10(3).jpgUCxFlk_10-first_time_using_new_set_up.jpgUCxFlk_10_carbonization.jpg 
  129   Tuesday, April 05, 2016, 11:12 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_11Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March
 UCxFlk_11.jpg 
  130   Tuesday, April 19, 2016, 10:48 Laura LambertUC2*** Done***ALL FUTURE UCx TARGETS*** Tuesday, April 19, 2016, 09:47
Temperature measurements have been
taken in evap2 on target containers. 
  
  131   Monday, May 16, 2016, 15:52 Laura Lambert    Full clean of EVAP1 Monday, May 16, 2016, 15:51
full clean of inside evap1 this afternoon.

 
  
  132   Wednesday, May 18, 2016, 15:15 Laura LambertUC240860-2LP-IG-LISDoneConditioning UCx#16 Wednesday, May 18, 2016, 15:05
Target container was previously
  
  133   Monday, July 11, 2016, 16:00 Laura LambertUC241790-3LP-SISDoneConditioning UCx#17Monday, July 11, 2016, 15:54
Target container was previously
 trip-off.JPGsnapshot_of_striptool.JPG 
  136   Tuesday, September 20, 2016, 10:49 Laura Lambert  TARGET BOATDoneRUSH. Sintering end-caps

    

       
            
 Evernote_Camera_Roll_20160919_154129.jpgEvernote_Camera_Roll_20160919_154130.jpgEvernote_Camera_Roll_20160919_154131.jpgEvernote_Camera_Roll_20160919_154132.jpg 
  137   Friday, September 23, 2016, 16:09 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_12Friday, September 23, 2016, 16:01
*Note: materials were scaled back
small amount since only 48.5g of UO2 was
  
  138   Wednesday, October 19, 2016, 16:52 Laura LambertUC241790-6LP-SISDoneConditioning UCx#18 Wednesday, October 19, 2016, 16:47
Target container was previously
  
  139   Monday, November 07, 2016, 13:34 Laura LambertUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_13 Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov
 UCxFlk_13[4].jpgUCxFlk_13[1].jpg 
  141   Wednesday, November 16, 2016, 16:41 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_13

    

       
            
 UCxFlk_10_carbonization.jpgUCxFlk_13_not_done_carbonization_at_520A-see_vacuum.jpgUCxflk_13.xlsx 
  142   Tuesday, November 29, 2016, 16:20 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_14 Tuesday, November 29, 2016, 16:13
UO2/C green was prepared Nov
 UCxFlk_14[1].jpgUC2flk_14_carbonized_in_new_boat.jpg 
  143   Tuesday, December 20, 2016, 15:03 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas break    
  144   Thursday, February 16, 2017, 15:09 Laura LambertUC242218-12LP-SISDoneConditioning UCx#19 Thursday, February 16, 2017, 15:04
Target container was previously
 IMG_1578.JPGIMG_1587.JPGIMG_1594.JPGIMG_1598.JPG 
  145   Friday, March 03, 2017, 15:51 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_15 Friday, March 03, 2017, 08:53
UO2/C green was prepared
 evap1_tripped_off_UCxFlk_15.jpg 
  146   Thursday, April 20, 2017, 11:41 Laura LambertUC242218-1LP-IG-LISDoneConditioning UCx#20 Thursday, April 20, 2017, 11:31
Target container was previously
 6x 
  147   Tuesday, May 23, 2017, 15:51 Laura LambertUO2/C40282-1TARGET BOATIn progressprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS Tuesday, May 23, 2017, 14:42
UO2/C green was prepared May
 UCxFlk_16_temp_readout.jpg 
  148   Wednesday, May 24, 2017, 09:34 Laura Lambert   MaintenanceVACUUM TRIP OFF SETPOINT CHANGED Wednesday, May 24, 2017, 09:31
Last week the vacuum trip off point
was changed to 8e-4 Torr when previously
  
  149   Friday, May 26, 2017, 15:23 Laura LambertUO2/C40282-1TARGET BOATProblemsprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
 6x 
  150   Friday, May 26, 2017, 16:09 Laura LambertUO2/C40282-1TARGET BOATIn progressprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
  
  151   Monday, May 29, 2017, 08:54 Laura LambertUO2/C40282-1TARGET BOATProblemsprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
 evap1_tripped_off_roud2_UCxFlk_16.jpgevap1_tripped_off_roud2_UCxFlk_16(2).jpg 
  152   Tuesday, May 30, 2017, 07:43 Laura LambertUO2/C40282-1TARGET BOATDoneprocessing UC2Flk_16 - 1ST TEST CHANGING VACUUM LIMITS

    

       
            
  
  154   Monday, June 12, 2017, 15:07 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_17 Monday, June 12, 2017, 11:41
UO2/C green was prepared June
 UC2Flk_17_entire_carbonization_process_using_new_vacuum_limits.JPGUC2Flk_17_vac_vs._cur.JPGUC2Flk_17_vac_vs._volt.JPG 
  155   Wednesday, July 12, 2017, 17:07 Laura LambertUC242218-15LP-SISIn progressConditioning UCx#21 Wednesday, July 12, 2017, 17:06
Target container was previously
  
  156   Thursday, July 13, 2017, 12:49 Laura Lambert   Problems*hot lab is HOT*Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! 
 Capture.JPG 
  157   Thursday, July 13, 2017, 14:50 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

    

       
            
  
  158   Wednesday, July 19, 2017, 14:15 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

    

       
            
  
  159   Wednesday, July 19, 2017, 14:17 Laura LambertUC242218-15LP-SISIn progressConditioning UCx#21

    

       
            
  
  160   Thursday, July 20, 2017, 15:00 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

    

       
            
 Capture.JPGCapture3.JPG 
  161   Thursday, July 20, 2017, 15:35 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

    

       
            
  
  162   Thursday, July 20, 2017, 15:57 Laura LambertUC242218-15LP-SISDoneConditioning UCx#21

    

       
            
 IMG_3249.JPGIMG_3251.JPGIMG_3257.JPGIMG_3258.JPGIMG_3260.JPG 
  163   Thursday, July 27, 2017, 09:08 Laura Lambert   Problems resolved*hot lab is HOT*

    

       
            
  
  164   Wednesday, August 23, 2017, 15:54 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#1 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast
 IMG_1768.JPGIMG_1774.JPG 
  167   Thursday, September 21, 2017, 11:35 Laura LambertEmpty  DoneTesting TBHT [1st run!], RP [new oil] and IG [new gauge] Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied.
  
  168   Wednesday, September 27, 2017, 12:05 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_18 Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept
  
  169   Tuesday, October 10, 2017, 14:16 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_19 Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct
  
  170   Tuesday, November 07, 2017, 11:57 Laura Lambert   MaintenanceInterlocks limits changed to 100mTorr Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray
  
  171   Tuesday, November 07, 2017, 12:04 Laura Lambert   MaintenanceNoise levels checked - ear protection not required. Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry.
  
  172   Tuesday, November 07, 2017, 14:38 Laura LambertEmpty LP-FEBIADDoneTBHT test with LP-FEBIAD Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for
 evap1_data.xlsx 
  173   Tuesday, November 14, 2017, 16:16 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#2 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used,
 striptool.JPG 
  174   Wednesday, November 22, 2017, 14:20 Laura Lambert   MaintenanceNew eye wash for hot lab! Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout.
  
  177   Friday, January 12, 2018, 07:46 Laura LambertUO2/C TARGET BOATIn progressCarbonizing UO2/C discs for 1stepUCx in graphite sample container_#4

    

       
            
  
  194   Wednesday, February 28, 2018, 15:21 Laura LambertEmpty TARGET BOATDoneTesting TGHT to induce trip Wednesday, February 28, 2018, 15:19
Last two rounds of materials in evap1
have tripped off the TGHT in epics within
  
  198   Tuesday, March 20, 2018, 14:52 Laura LambertUC242218-13LP-SISDoneConditioning UCx#22 Tuesday, March 20, 2018, 14:43
Target container was previously
  
  199   Wednesday, March 28, 2018, 11:46 Laura LambertUO2/C40282-2TARGET BOATIn progressCarbonizing first full length 1step UCx target Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from
  
  200   Monday, April 09, 2018, 16:51 Laura LambertUO2/C40282-2TARGET BOATProblemsCarbonizing first full length 1step UCx target

    

       
            
 evap1_trip.JPGevap1_trip_archive.JPG 
  201   Monday, April 09, 2018, 16:53 Laura LambertUO2/C40282-2TARGET BOATProblems resolvedCarbonizing first full length 1step UCx target

    

       
            
  
  202   Tuesday, April 10, 2018, 14:49 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing first full length 1step UCx target

    

       
            
  
  203   Tuesday, April 17, 2018, 12:45 Laura LambertUO2/C40282-2TARGET BOATDoneProcessing UC2Flk_20 Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April
  
  1   Wednesday, March 23, 2011, 18:23 John Wong    Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)March 23, 2011
12:30: Target oven is wrapped with
3 Ta-heat shields.  Pumping down evaporator
 grab.K18246.pnggrab.g20718.pnggrab.r27097.pnggrab.t30095.png 
  2   Friday, March 25, 2011, 17:22 John Wong    Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)

    
        
  
  4   Monday, March 28, 2011, 12:29 John WongEmpty38481-8HP-FEBIADDoneFins diffusion bonding March 28, 2011
12:28:  Target oven is wrapped
with 3 Ta-heat shields.  Pumping down
 grab.Kxr912.pnggrab.L10194.png 
  7   Tuesday, April 05, 2011, 10:37 John WongEmpty38481-6HP-FEBIADDoneFins diffusion bonding Tue Apr  5 10:36:53 2011:  Target
oven is wrapped with 3 Ta-heat shields. 
The evaporator is in the process of pumping
 pumping_down.jpgheatingup.jpgcooling_down.jpg 
  8   Wednesday, April 06, 2011, 17:07 John WongEmpty37978-1HP-FEBIADDoneFins diffusion bonding Wed Apr  6 17:06:56 2011: Target oven is
wrapped with 3 Ta-heat shields.  Pumping
down evaporator in progress.
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 
  9   Friday, April 08, 2011, 14:55 John WongEmpty38295-8HP-FEBIADDoneFins diffusion bonding Fri Apr  8 14:51:37 2011:  Target
is wrapped with 3 Ta-heat shields. 
The evaporator has been pumped down for over
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpg 
  10   Monday, April 11, 2011, 10:22 John WongEmpty38295-9HP-FEBIADDoneFins diffusion bonding Mon Apr 11 10:21:56 2011: Target is wrapped
with 3 Ta-heat shields.  Evaporator
is pumping down. 
 pumping_down.jpgAutoheating_parameter_setup.jpggrab.A29589.png 
  11   Tuesday, April 12, 2011, 10:30 John WongEmpty38481-5HP-FEBIADDoneFins diffusion bonding Tue Apr 12 10:29:38 2011:  Target
wrapped with 3 Ta-heat shields.  Evaporator
is currently being pumped down.
 grab.s31535.pnggrab.c31573.pngcooling_down.jpg 
  12   Wednesday, April 13, 2011, 10:37 John WongEmpty38481-7HP-FEBIADDoneDiffusion bonding of Ta Fins for FEBIAD-HPWed Apr 13 10:37:25 2011:  Target
is wrapped with 3 Ta-heat shields. 
Evaporator is currently being pumped down.
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpgwasher_on_target_leg.jpg 
  13   Thursday, April 14, 2011, 09:53 John WongEmpty37810-1HP-FEBIADDoneFins Diffusion bonding Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. 
 cooling_down.jpg 
  15   Thursday, April 14, 2011, 17:03 John WongEmpty38481-7HP-FEBIADProblems resolvedEvap. bolt/washer problems & solutions Thu Apr 14 14:03:17 2011: 
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7)
 6x 
  16   Monday, April 18, 2011, 18:14 John WongEmpty38295-8HP-FEBIADProblemsSintering target oven coated with TaCMon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb
 pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg 
  17   Wednesday, April 20, 2011, 16:42 John WongEmpty38481-8HP-FEBIADDoneSintering target oven coated with TaCWed Apr 20 16:39:46 2011:  Target
oven was coated with TaC early today. 
The target was allowed to dry and then wrapped
 overall_process.jpg 
  18   Monday, May 09, 2011, 16:10 John WongEmpty38817-1HP-SISDoneDiffusion bonding of Ta FinsMon May  9 16:09:35 2011:  Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down.
 TGHT_ramping_up.gifoverall_process.jpg 
  19   Tuesday, May 10, 2011, 14:58 John WongEmpty38817-2HP-SISDoneDiffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) Tue May 10 14:56:05 2011:  Target
is wrapped with 3 heat-shields.  The
evaporator is pumping down, vac @ 4.72e-6
 starting_process.jpgoverall_process.gif 
  20   Wednesday, May 11, 2011, 16:23 John WongSiC38481-8HP-FEBIADProblems Organics burnoff & Sintering Wed May 11 16:20:21 2011:  The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs).  The target is wrapped with
 9x 
  21   Tuesday, May 17, 2011, 16:43 John Wong   MaintenanceEvaporator Ion gauge replaced The evaporator ion gauge filament burnt
out on May 11, 2011.  A target was in
the evaporator at that time and was about
  
  22   Wednesday, May 18, 2011, 13:13 John WongSiC38295-8HP-FEBIADProblemsOrganics burnoff & Sintering Wed May 18 13:12:24 2011:  Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being
 6x 
  23   Wednesday, May 25, 2011, 14:42 John WongUO2/CUCx-heatboat#1LP-SISDoneBatch#1: UO2/C mixing & carbonizationBefore began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply.
 Screen_shot_2011-05-26_at_3.14.00_PM.pngauto_ramping.pngUCx_2011_A_carbonization.pngEvaporator_Ar_flow.pngUC2.png 
  24   Thursday, June 30, 2011, 12:42 John WongUO2/CUCx-heatboat#1LP-SISDoneBatch#2: UO2/C for carbonizationBefore began the
carbonization process, two cameras were setup
 startup_vac.jpgstartup_current.jpgparameter.jpgUCx_2011_b_3days.pnggrab.S13888.png 
  25   Monday, July 18, 2011, 15:55 John WongEmpty38634-3LP-SISDoneSintering TaC coating for UCx#2 Monday, July 18, 2011, 15:53:  Target
oven was coated with TaC and let dry over
the weekend.  The target is now installed
 striptool.jpg 
  26   Wednesday, July 27, 2011, 13:02 John WongUC238634-3LP-SISProblemsUCx#2 conditioning Wednesday, July 27, 2011, 12:58: 
Target length = 11.2cm
Total UC2/C foils = 245 discs
 striptool_july31.pngTarget_with_3_heat_shields.jpgstriptool_july31_600A.jpgUCx#2-conditioning.jpg 
  27   Wednesday, August 03, 2011, 17:16 John WongEmpty38634-8LP-SISDoneSintering TaC coating Wednesday, August 03, 2011, 20:27 :  Target
was wrapped with 3 new Ta-heat shields and
2 around the back block.  The tar from
 striptool.JPG 
  28   Thursday, August 04, 2011, 17:46 John WongUC238634-8LP-SISProblems resolvedRepacking UCx in new target ovenThursday, August 04, 2011, 17:44: 
All the UCx material from target oven  38634-3
was recovered and repacked in this new oven. 
 200A.jpgreconditioning.jpg 
  29   Monday, August 29, 2011, 11:21 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1 Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night.  The target oven is in the evaporator
 TaC_target_oven.JPG 
  31   Tuesday, August 30, 2011, 16:30 John WongEmptyTarget BoatLP-SISDoneSintering of End Caps


   
        
            
  
  32   Tuesday, September 06, 2011, 17:05 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1


   
        
            
 striptool.JPG 
  33   Wednesday, September 07, 2011, 13:33 John WongEmpty  MaintenanceChanged Evaporator#1 Backing Pump oil Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing
  
  34   Wednesday, September 07, 2011, 13:41 John WongTaC38634-6LP-SISDoneTaC#1: Sintering and Organics burn-off Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125
 TaC#1.jpgendcaps_after_sintering.pngTaC_aftersintering.jpg 
  36   Friday, September 09, 2011, 10:05 John WongEmpty HP-FEBIADDoneSintering TaC coatingFriday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields.  Chamber
 striptool.JPG 
  37   Monday, September 12, 2011, 13:08 John WongEmptyTarget Boat DoneSintering TaC coating on End CapsMonday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering.  Target
 striptool.JPG 
  38   Tuesday, September 13, 2011, 16:53 John WongSiC38295-9HP-FEBIADDoneReady Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. 
 9x 
  39   Wednesday, September 21, 2011, 13:23 John WongEmpty38634-10LP-SISDoneSintering TaC coating on target oven for UCx#3 Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. 
 archiver_TGHT0-580A.JPG 
  40   Thursday, September 22, 2011, 20:34 John WongEmpty38634-9LP-SISDoneSintering TaC coating for UCx#2 (spare) Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down.
  
  41   Thursday, September 29, 2011, 10:58 John WongUO2/CUCx-heatboat#2 DoneUCx#3: Batch#1 - UO2/C mixture of carbonization Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let
 6x 
  42   Thursday, October 06, 2011, 12:22 John WongUO2/CUCx-heatboat#2 DoneUCx#3: Batch#2 - UO2/C mixture of carbonization  Thursday, October 06, 2011, 12:19
 
 UCx#3_batch#2_tripped@40A.jpgUCx#3_batch#2_TGHT@317A.JPGUO2_C_batch#2_Archive_overall_process.JPG 
  43   Thursday, November 03, 2011, 09:24 John WongUC238634-10LP-SISDoneUCx#3: Final conditioning Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields,
 auto_heating_failed.jpgEvap1_TGHT_problem.jpgEvpr_org_burnout_01.jpgEvpr_org_burnout.jpgarchive_overall_process.JPG 
  45   Tuesday, February 14, 2012, 21:56 John WongUO238481-9LP-FEBIADDoneUO2/Nb sintering process Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process.  
 Screen_shot_2012-02-14_at_9.00.04_PM.pngUO2_Nb_1_striptool.jpg 
  46   Thursday, April 05, 2012, 16:47 John WongEmpty38817-3HP-SISDoneCoating target oven /w TaC & sinteringThursday, April 05, 2012, 16:43
Target oven is coated with TaC. 
The oven is wrapped with 3 Ta-heat shields.
 Targetoven_TaCsintered_archive.JPG 
  47   Tuesday, May 08, 2012, 07:42 John WongSiC38817-3HP-SISDoneSintering SiCTuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils.
 TGHT_0_270A.pngSiC#27_0-820A.JPG 
  48   Monday, May 14, 2012, 15:22 John Wong Target boat  Testing the new graphite foil from CeramaterialMonday, May 14, 2012, 15:04
Due to the differences in the use
of the graphite foils in past SiC targets
 parameter.JPGTGHT_0-820A.GIFgraphite_test_target_boat.pdfGraphite_Foil-Certifcate_of_Compliance-Triumf_Order-1-16-12.pdf 
  49   Wednesday, June 06, 2012, 16:58 John WongUO2/CUCx-heatboat#2 DoneUC2 flakes for UCx#4: batch#01-04062012Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June
04, 2012. 
 7x 
  50   Monday, June 11, 2012, 10:48 John WongUO2/CUCx-heatboat#2 ProblemsUC2 flakes - batch#01-04062012: broken seal & TGHT power supply

    

       
            
  
  51   Tuesday, June 12, 2012, 11:38 John WongUO2/CUCx-heatboat#2 Problems resolvedUC2 flakes - batch#01-04062012: broken seal & TGHT power supply

    

       
            
  
  52   Tuesday, June 12, 2012, 14:43 John Wong   MaintenanceChanging backing pump oil Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). 
  
  53   Sunday, June 24, 2012, 22:52 John WongUO2/CUCx-heatboat#2 ProblemsUC2 flakes - batch#01-04062012: IOC problems

    

       
            
 IOC_problem.png 
  54   Monday, June 25, 2012, 16:00 John WongUO2/CUCx-heatboat#2 Problems resolvedUC2 flakes - batch#01-04062012: Fiber converters failed

    

       
            
  
  55   Tuesday, July 10, 2012, 12:54 John WongUC238634-9LP-SISDoneUCx#4 final conditioning completedTuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). 
 TGHT_0-175_orgburnoff.GIFUCx#4_final_conditioning_0-520A.PNG 
  56   Thursday, July 19, 2012, 17:14 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes for UCx#5 - (batch#02-13062012)Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June
13, 2012. 
 TGHT_100A.pngUC2_flakes_0-520A.GIF 
  57   Friday, August 24, 2012, 16:44 John WongUC239165-5LP-SISIn progressConditioning UCx#5Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012),
  
  62   Thursday, October 25, 2012, 15:03 John WongBeOTa-target boat (old) In progressSintering BeO pellets #5 - testing Re foil as the protective under layerThursday, October 25, 2012, 14:50
Previous sintering BeO tests, pellets
1 to 4 were done in Evaporator#2.
 BeO_pellets_on_Re_foil.PNGTGHT_0-400A.PNGBeO_pellet#5_TGHT_100-600A.PNGBeO_pellet#5_@_600A__11hrs.PNG 
  63   Tuesday, April 02, 2013, 17:46 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes for UCx#6 (batch#03 - 02042013)Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11,
2013.
  
  64   Monday, May 06, 2013, 14:34 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#04 - 05032013) Monday, May 06, 2013, 14:29
UO2/C green was prepared on May 2,
2013 and let dry over the weekend.
 UC2_flakes_batch#04-05032013.PNG 
  65   Thursday, May 30, 2013, 16:25 John WongUC239165-6LP-SISDoneConditioning UCx#06Thursday, May 30, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2.
 UCx#6_conditioning_stage1.PNG 
  67   Thursday, June 06, 2013, 16:56 John WongUC239165-6LP-SISDoneConditioning UCx#06

    

       
            
 UCx#6_final_conditioning.PNG 
  69   Tuesday, June 25, 2013, 16:28 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  71   Thursday, July 11, 2013, 16:22 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  72   Monday, July 15, 2013, 09:45 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  74   Monday, August 05, 2013, 07:52 John WongUC238634-7LP-SISDoneConditioning UCx # 07

    

       
            
 UC#7_final_conditioning.PNG 
  75   Thursday, August 22, 2013, 18:00 John WongUO2/CTarget Boat #2 DoneProcessing UC2 flaskes (batch#06 - 08222013Thursday, August 22, 2013, 17:31
1st attempt: 
UO2/C green was prepared on Aug 14,
 UO2_C_cast.PNGUCx_flakes.PNG 
  76   Friday, August 23, 2013, 16:11 John WongUO2/CTarget Boat #2 Problems resolvedProcessing UC2 flaskes (batch#06 - 08222013

    

       
            
  
  79   Friday, September 20, 2013, 13:49 John WongUO2/CTarget Boat #2 DoneProcessing UC2Flk_00

    

       
            
  
  80   Friday, October 04, 2013, 15:56 John WongEmpty LP-SISDoneIgnore this entry - Process was done in Evap2Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
  
  81   Friday, October 11, 2013, 18:10 John WongUC239814-IVLP-IG-LISDoneUCx#8 - Final Conditioning Friday, October 11, 2013, 18:00
 
  
  89   Tuesday, March 04, 2014, 15:48 John Wong  TARGET BOATIn progressRe-sinterring end capsTuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were
  
  91   Wednesday, March 05, 2014, 23:05 John Wong  TARGET BOATDoneRe-sinterring end caps

    

       
            
 endcaps_Mar3_2014.PNG 
  92   Monday, March 24, 2014, 17:53 John WongUO2/C TARGET BOATDoneProcessing UC2Flk_02 Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March
21 and let dry over the weekend.  The
 UC2_flakes_batch#09-03242014.PNG 
  93   Wednesday, April 30, 2014, 14:58 John WongUC239165-9LP-SISDoneConditioning UCx#9Wednesday, April 30, 2014, 14:50
The target container was previously
coated with TaC and sintered in Evap 2.
 UCx#9_final_conditioning.PNG 
  94   Wednesday, May 21, 2014, 11:41 John WongUC2 TARGET BOATIn progressTests: Sintering carbon Mesh coated with UC2Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of
carbon mesh coated with UC2.  The sample
 Vac_Cur_plot.PNG 
  95   Friday, June 13, 2014, 15:21 John WongUC239165-10LP-SISDoneConditioning UCx#10 Friday, June 13, 2014, 15:02
Target container was previously coated
and sintered with TaC.  It's wrapped
  
  96   Friday, July 04, 2014, 10:23 John WongThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. 
Each sample consists of 5pack ThO2/Nb. 
 2014-07-03_12.29.29.jpgThO_raw_green_sintered_30um.pngpressure_current_plot.PNG 
  98   Thursday, August 14, 2014, 17:56 John WongThO2 LP-SISDoneSintering ThO2#1 Thursday, August 14, 2014, 17:54
Target container consists of 240
discs of ThO2/Nb discs.  The container
  
  101   Friday, October 10, 2014, 14:00 John WongUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_04

    

       
            
 archiver_TGHT&VAC.PNG 
  103   Monday, October 20, 2014, 16:22 John WongUC240282-5LP-SISDoneConditioning UCx #11

    

       
            
 power_bump.PNG 
  113   Thursday, July 02, 2015, 13:01 John WongUC240860-1LP-IG-LISIn progressConditioning UCx #13

    

       
            
  
  115   Wednesday, July 08, 2015, 10:52 John WongUC240860-1LP-IG-LISDoneConditioning UCx #13

    

       
            
 Screen_Shot_2015-07-09_at_5.20.37_PM.pngpressure_current_plot.PNG 
  116   Thursday, July 30, 2015, 17:19 John WongUO2/C40282-1TARGET BOATIn progressProcessing UC2_flk_07 Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared
on July 13, 2015.  See screen shot for
 IMG_20150714_145857963.jpg 
  120   Monday, September 14, 2015, 15:31 John WongUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_09 Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic
 poor_backing_pump.PNGcurrent_pressure_plot.PNG 
  121   Thursday, October 15, 2015, 16:05 John WongUC241077-5LP-SISIn progressConditioning UCx#14Thursday, October 15, 2015, 15:52
Target container previously sintered
with TaC in Evap#2 - Target current at 440A,
  
  126   Friday, February 26, 2016, 10:27 John WongUC241077-1LP-SISIn progressConditioning UCx#15

    

       
            
  
  134   Tuesday, August 23, 2016, 17:35 John Wong  TARGET BOAT Sintering TaC coated target boat Tuesday, August 23, 2016, 17:33
Target boat coated with TaC (sprayed)
and wrapped with Ta-heat shield. 
  
  135   Monday, September 12, 2016, 17:41 John Wong  TARGET BOATIn progressRUSH. Sintering end-caps Monday, September 12, 2016, 17:30
A bunch of end caps (12?) and a long
Ta-wire in spring sharp  were coated
  
  140   Tuesday, November 15, 2016, 10:02 John WongUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_13

    

       
            
  
  213   Thursday, July 05, 2018, 13:43 John WongUC2 HP-FEBIAD-CTLDoneConditioning UCx#23Thursday, July 05, 2018, 13:24
Target container was previously coated
and sintered with TaC, also wrapped with
  
  214   Wednesday, July 11, 2018, 17:44 John WongUO2/C TARGET BOATDoneProcessing UC2Flk_21Wednesday, July 11, 2018, 17:41
Cast prepared by Marla (see note
in Hotlab)
  
  215   Friday, August 03, 2018, 17:49 John WongUC2 LP-SISIn progressConditioning UCx#24Friday, August 03, 2018, 17:44
Target consists of 230 UCx discs,
total packing length of 7.1cm. 
  
  219   Saturday, September 29, 2018, 19:04 John WongUO2/C TARGET BOATIn progressProcessing UC2_flk_22Saturday, September 29, 2018, 18:52
Cast is from Jar#1.  (see process
sheet for details)
 striptool_capture.JPGTGHT_tripped.JPGpressure_limiting.JPG 
  220   Saturday, September 29, 2018, 20:53 John WongUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2

    

       
            
  
  221   Thursday, October 11, 2018, 18:13 John WongUC2 LP-SISIn progressConditioning UCx#25Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. 
 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG 
  259   Tuesday, May 26, 2020, 20:44 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#33 Carbothermal Reduction Tuesday, May 26, 2019,
18:20
  
  262   Wednesday, June 03, 2020, 08:10 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#34 Carbothermal ReductionWednesday, June 03, 2020, 08:11 
A loaded graphite cartridge
  
  272   Wednesday, June 30, 2021, 13:35 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#34 conditioningTarget
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021).
  
  273   Wednesday, July 07, 2021, 12:40 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx Provisional ID= 200229 conditioning Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929
  
  275   Thursday, September 23, 2021, 07:03 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#35 C reduction Thursday, September 23, 2021, 06:55
A loaded graphite cartridge
  
  281   Wednesday, June 01, 2022, 08:42 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction Provisional ID C211209-1 Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge
  
  282   Friday, June 03, 2022, 06:21 Darwin Ortiz RosalesUO2/C42218-4LP-IG-LISDoneUCx#39 reduction
Friday, June 03, 2022, 06:24
  
  283   Tuesday, June 07, 2022, 07:09 Darwin Ortiz RosalesUO2/CTarget Boat DoneUO2 reduction ID C220510-1Tuesday, June 07, 2022, 07:05
A loaded graphite cartridge
  
  284   Friday, October 07, 2022, 08:14 Darwin Ortiz RosalesUO2/C LP-SISDoneC-220928UCx conditioning experimentsFriday, October 07, 2022, 07:55
Cartridge-220928UCx was installed
 Cap_1_221011.pngCap_2.pngcap3.png 
  285   Wednesday, October 19, 2022, 12:28 Darwin Ortiz RosalesUC240253-5LP TUBEDoneC-220510 further conditioningWednesday, October 19, 2022, 10:27
Cartridge-220510Cx was installed
  
  286   Monday, November 28, 2022, 05:59 Darwin Ortiz RosalesUO2/C LP-SISDoneC221125experimentMonday, November 28, 2022, 05:58
Left weekend to pump down
current IGPI= 7.23e-7 Torr
 Data_summary.png 
  287   Monday, December 19, 2022, 10:45 Darwin Ortiz RosalesUO2/C LP TUBEDoneC-221207 ReductionMonday, December 19, 2022, 10:38
Cartridge with 175 discs (including
5 analysis discs) loaded into a graphite
  
  288   Thursday, January 19, 2023, 10:02 Darwin Ortiz RosalesUO2/C LP TUBEDoneC230105 ReductionThursday, January 19, 2023, 09:57
Cartridge #8 loaded with 198 discs
To be reduced inside a Ta container
  
  289   Wednesday, March 22, 2023, 22:29 Darwin Ortiz RosalesUO2/C LP TUBEDone230316 ReductionWednesday, March 22, 2023, 22:29
Cartridge #9 loaded with 213 plus
3 analysi discs
  
  290   Wednesday, October 11, 2023, 10:06 Darwin Ortiz RosalesUO2/C LP TUBEDoneTUCx-231005 reduction & conditioningWednesday, October 11, 2023, 9:36
Cartridge #10 loaded with 213 plus
3 analysi discs
  
  291   Tuesday, April 09, 2024, 14:43 Darwin Ortiz RosalesUO2 LP TUBEDoneUCx240408 reduction Tuesday, April 09, 2024, 14:42
Cartridge #16 loaded with 213 plus
3 analysi discs
  
  292   Thursday, September 12, 2024, 06:23 Darwin Ortiz RosalesUO2/C LP TUBEDoneUCx240904 reduction
Thursday, September 12, 2024, 06:19
Cartridge #19 loaded with 232 discs
including 5 analysis discs
  
  293   Tuesday, September 17, 2024, 06:49 Darwin Ortiz RosalesUO2/C LP TUBEDoneUCx240916 reductionTuesday, September 17, 2024, 06:45
Cartridge #20 loaded with 224 discs
plus 3 analysis discs
  
  294   Thursday, September 19, 2024, 22:48 Darwin Ortiz RosalesUO2/Cconditioning oven#3LP TUBEDoneUCx240917 reductionThursday, September 19, 2024, 22:44
 
Cartridge #21 loaded with 211 discs
  
  295   Tuesday, January 14, 2025, 16:28 Darwin Ortiz RosalesUO2/Cconditioning oven#3LP TUBEIn progressUCx250113 reductionTuesday, January 14, 2025, 16:26
 
Cartridge #22 loaded with 211 discs
  
  30   Tuesday, August 30, 2011, 09:31 Anders MjosEmptyTarget BoatLP-SISDoneSintering of End CapsTuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping
  
  35   Wednesday, September 07, 2011, 15:40 Anders MjosEmpty  MaintenanceRe-sealing of Glove Box2011-09-01:

    Glove box was leaking
(air/argon) between base and box. Light was
  
  82   Friday, November 01, 2013, 13:08 Anders Mjos   MaintenanceGloves, window and window gasket replaced.Work covered under work permit 2013-11-01-3
and performed by Anders and Rick with the
help of Danno (RPG).
  
  83   Monday, December 02, 2013, 16:09 Anders Mjos   Problems resolvedTGHT connector repositioned and tightenedThe right connector for the TGHT had rotated.
It has now been repositioned and both connectors
have been tightened to reduce the chance
 Evap1_rotated_TGHT_conductor_2013-12-02.pdf 
  84   Monday, December 02, 2013, 16:10 Anders Mjos   DoneCopper bar on TGHTThe conductivity of the TGHT circuit will
be measured with a copper bar shunt.
Monday, December 02, 2013, 16:00:
 Current_and_Voltage.pdf 
  119   Saturday, August 29, 2015, 16:12 Anders Mjos   ProblemsRestarting vacuum after power outageSaturday, August 29, 2015, 16:10: Roughing
Saturday, August 29, 2015, 16:10:
Starting turbo
  
  218   Friday, September 21, 2018, 10:22 Anders MjosUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2


   
        
            
  
  153   Wednesday, June 07, 2017, 12:48 Aaron Schmidt    Turbo pump cooling Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump.
  
  165   Thursday, September 07, 2017, 14:26 Aaron Schmidt   Maintenanceroughing pump oil replaced Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected
  
  166   Wednesday, September 20, 2017, 08:07 Aaron Schmidt   MaintenanceIon gauge & RP statusWednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old
  
  212   Tuesday, June 26, 2018, 12:12 Aaron Schmidt   Problems resolvedGloves replaced. Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out. 
The original right one was otrn.
  
  233   Thursday, March 21, 2019, 09:03 Aaron Schmidt   In progressEvap 1 pump down issueOn Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a
  
  234   Tuesday, March 26, 2019, 08:58 Aaron Schmidt   MaintenanceRoughing pump oiled.Oiled as per work permit:     
  250   Tuesday, November 05, 2019, 14:50 Aaron Schmidt   MaintenanceFallen Bolt. One of the TBHT bolts  fell out of reach   
  261   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  260   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  264   Tuesday, August 18, 2020, 12:40 Aaron Schmidt    IEVAP:IGP1 swap out INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38:
  
  3   Monday, March 28, 2011, 11:20    HP-FEBIADDoneDiffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
  
  5   Tuesday, March 29, 2011, 10:20     ProblemsLoss of cooling waterAccording to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about
  
  6   Tuesday, March 29, 2011, 10:30     DoneLoss of cooling water updateIt's the NON-ACTIVE water that will go
off.  The evaporator is on sity water,
so it will be OK.
  
ELOG V2.9.2-2455