Wednesday, April 13, 2022, 10:50
P2NC-220323
Preparing the P2N-UCx for online operation on June 2022
Two cartridges were filled with annular UO2/C foils last week.
48 cartridges total
Today, Darwin and I are placing one of the two cartridges in the EVAP1. The cartridge is P2NC-220323.
Thursday, April 14, 2022, 09:34
Carbothermal reduction heating process started with a ramp rate of 3 A/min
Pressure 1.8E-6T
Thursday, April 14, 2022, 10:31
Paused autoramp because pressure increasing too rapidly. Will continue ramp up once pressure stabilizes.
Thursday, April 14, 2022, 11:20
autoramp restarted @3A/min
IGP1=2.7E-4 Torr
Thursday, April 14, 2022, 13:24
After first major outgass finished and pressure trending down, increased autoramp to 5A/min to 600A
Thursday, April 14, 2022, 13:27
IGP1 = 3.3E-4A
TGHT = 600A, 2.5V
decrease ramp rate to 3A/min to 650A
Thursday, April 14, 2022, 13:45
Set autoramp to 670A
Thursday, April 14, 2022, 13:52
paused autoramp at 668A because pressure increase too steep.
Changed ramp rate to 0.5A/min and restarted ramp up to 700A
Thursday, April 14, 2022, 15:20
Continued increase in current towards 700A while pressure decrease indicated completeness of reduction.
Started rampdown to 650A.
Pressure was 1.7E-4 Torr on IGP1
Friday, April 15, 2022, 06:28
The current was reduced to 500A @ 3:50 PM yestesterday.
Currently, TGHT = 500A, 2.0V
started aurtoramp down @ -2A/min
IGP1= 2.4E-6 Torr
Monday, May 02, 2022, 12:32
Cartridge reloaded onto EVAP 1. Will heat back up to check carbothermal reduction.
Tuesday, May 03, 2022, 08:40
IGP1= 1.32e-6 Torr
Good vacuum 1e-1 Torr
Bad vacuum 5e-1 Torr
Autoramp set to 1A/10s to 500A
Autoramped up to 750A @ 1A/10s. Only slight pressure increases observed areound 150A and 650A to 700 A. Parameter curves will be evaluated.
Tuesday, May 03, 2022, 11:11
Started rampdown at -1A/10s.
IGP1 was 3.0e-5 Torr and trending down when rampdown started
|